UPDATE 7/11/24:
The vehicle and pedestrian gates are now operational and ready for use.
- The new gate is on a card reader system after hours (enter with card access through pedestrian gate, then push the button to operate the vehicle gate; exiting in vehicle will be automatic). The other gates will continue to be padlocked. If your card isn’t already programmed into the pedestrian gate reader, please contact Work Control Center to request access (541-346-2319).
- Per city requirement, a click2enter system will be in place for emergency vehicles.
- The gate will be open during regular business hours.
UPDATE 7/08/24:
- The new vehicle gate will be available for use once the temporary fencing has been removed. This is expected to happen by the end of the day today.
- The pedestrian gate is waiting to be programmed and should be completed by the end of the week. An update will be sent when it is ready for use.
UPDATE 6/10/24:
Installation of new fence posts is scheduled for 6/12. Electrical and concrete forms for sidewalk on 6/13. Sidewalk pour scheduled for 6/14. Asphalt resurfacing to occur next week, date to be determined. After which, the vehicle gate may be manually open to vehicle traffic – if the opportunity allows – while final wiring, programming, and testing take place. Once new fence panels are installed and construction site fencing is removed, closures will continue whenever work is occurring in or around the entrance. The pedestrian gate at the SE corner of the CPFM Administration building will continue to be the primary egress for pedestrians until the new pedestrian gate is fully operational. The end date for this project has been extended to June 28th.
UPDATE 5/15/24:
The pedestrian gate by the SE corner of the CPFM Administration Quonset has been opened. It is now keyed to the same gate key as the others.
Begin: Tuesday, May 14, 2024
End: June 14, 28 July 12 Thursday, July 11, 2024
Building(s) or Area(s) Affected: All buildings within the CPFM Compound, including 130, 136, 032, 137, 149, 131, 129, and 134
Scope: Construction associated with the replacement of the vehicle and pedestrian gates at the main entrance to the CPFM compound will begin May 14th and is scheduled to be completed June 12th 28th July 12th. The main entrance gates will be closed to vehicle and pedestrian traffic for the duration of the project.
Services Impacted:
- All vehicle traffic into the compound will circulate clockwise around the Central Power Station.
- Traffic signage will be posted on site.
- Some areas of service vehicle parking within the compound will be unavailable.
- The three parking spots in Lot 2, closest to the gate, will be closed.
Special Instructions: Refer to the attached diagram for additional details.
Work Performed By: Facilities Services with Braun Excavation, Island Fence, and their subcontractors.
Contact: Work Control Center, Campus Planning and Facilities Management, 541-346-2319