Johnson Hall Fire Sprinkler System Shutdown 11/4/19

On Monday, November 4th, from 6:00 am to 8:00 am, the fire sprinkler system will be shut down in the basement level.  This will allow the contractor to adjust the location of one fire sprinkler head plus an additional head near the west entry into the lower level of the building.  The rooms specifically affected are 001K and 003B.

Work will be performed by Preferred Construction.

For questions or concerns, please contact Gene Mowery at 541-346-5593 or gmowery@uoregon.edu.

Pacific Hall South Wing Labs Air and Water Shutdown 11/4/19

On Monday, November 4th, from 8:00 am to 9:00 am, the air handlers, heating water system, and chilled water system will be shutdown for approximately 30 minutes.  This will affect all south wing labs on the basement, first and second floors, south of hallway 108.

Work will be performed by Siemens.

For questions or concerns, please contact Spencer O’Neill at spencer.oneill@siemens.com.

 

Hendricks Hall Electrical Shutdown 11/5/19

On Tuesday, November 5th, from 6:00 am to 7:00 am, the electrical system will be shut down, affecting most of the building, including the elevator.  This will allow time for technicians to install parts in an electrical panel.

Building occupants need to shut down their computers the night before.

For questions or concerns, please contact Rob Berg at 346-2313 or rberg@uoregon.edu.

 

 

 

Huestis Hall Exterior & Window Washing 11/2/19-11/3/19

On Saturday, November 2nd, at 10:00 am through Sunday, November 3rd, at 5:00 pm the exterior of the building and the exterior windows will be washed at Huestis Hall. Due to the use of a lift, the walkways will be partially blocked, but will not interfere with ADA entrances.

There will possibly be exhaust from the power washer; U of O Facilities Services will work with the contractor to minimize this by positioning the power washer away from building air intakes

Please close all exterior windows on these dates.

Work will be performed by DDJ.

For questions or concerns please contact Kevin Farthing at kfarthin@uoregon.edu or 541-346-2857.

Pacific Hall Electrical Work Advisory 10/28/19 – 10/29/19

On Monday, October 28th and Tuesday, October 29th, EC Electric will be accessing the rooms listed below in order to make some corrections on the SIEMENS system in Pacific Hall.  This will involve pulling in some new wiring and making terminations at the SIEMENS HVAC controllers.  Each room will require approximately 1.5 hours of access.

 

Basement – 7, 10, 12

1st floor – 110, 111, 112, 113, 114

2nd floor – 210, 211, 212, 214, 217, 218, 220, 221

 

Prior notice was sent to Facilities Liaisons, PI’s, and Room Occupants.

If you have questions or concerns, please reach out to Work Control Center at 346-2319 or workcontrolcenter@uoregon.edu.

Onyx Bridge East Elevator Shutdown 10/22/19

Update 10/23:

The Otis technician received the parts and repaired the elevator. It is now operational.

 

The East elevator has malfunctioned. The Otis technician determined they need to order parts in order to make repairs. While repairs are being made, please use the Onyx West elevator or the elevator in Pacific Hall. We will send out an update as soon as we have a better idea of when the East elevator will be operational again.

For questions or concerns please contact CPFM Work Control Center 541-346-2319.

Willamette Hall Basement RO Water Shutdown 11/4/19 – 11/5/19

On Monday evening, November 4th at 10:30 pm, until Tuesday morning, November 5th at 6:30 am, the basement RO water will not be available.  This will allow contractors to further isolate the RO water for a basement lab renovation.

This will affect the basement level only.

Work will be performed by Lease Crutcher Lewis.

For questions or concerns, please contact Denise Stewart at 541-335-1258 or dstewart@uoregon.edu.

 

 

Huestis Hall 116: Lab to Office Conversion 10/22-11/28

Update 11/14:

This project has been extended and is expected to be completed on November 28th.

 

Beginning Tuesday, October 22nd, and proceeding through Thursday, November 14th 28th, Facilities Services and their contractors will be performing work in Huestis Hall room 116 to convert it from a lab to an office space. Building occupants can expect to hear normal and occasional construction noises, such as drilling and cutting, and may observe UO Facilities personnel and their subcontractors entering/exiting the building with tools and materials during regular business hours.

The Facilities team and their contractors are meeting to determine the construction activities most likely to result in potential disruption and will work with stakeholders to schedule these activities at optimal times. At this time, Facilities Services anticipates no utility disruptions or shutoffs; however, Facilities Services will provide additional notice(s) should any services be unexpectedly disrupted or shut down.

If you have any questions or concerns, please contact CPFM’s Construction Services Manager, Justin Griskin, at 541-356-5242.

15th Avenue Tree Planting 10/18/19 – 10/23/19

Trees will be planted along both sides of 15th Avenue, beginning on the North end of the SRC to the Western edge of Hayward Field.  Prep work will start Friday, October 18th, with the tree planting scheduled to begin Monday, October 21st, for approximately three days.

Cones and yellow ropes will be set up to establish a perimeter around the work zone.  Access to the buildings should not be impeded, and there will be spotters to ensure pedestrian safety.

For questions or concerns, please contact Work Control Center at 346-2319 or workcontrolcenter@uoregon.edu.

LERC Heat Repair Advisory 10/17/19 – 10/24/19

Update 10/24:

The heating system has been repaired and is currently operating.

 

Per the supplier, the parts needed to repair the heating system for LERC, which we were told would arrive today, are now expected to arrive Tuesday morning, October 22nd.

For questions or concerns, please contact Work Control Center at 2346-2319 or workcontrolcenter@uoregon.edu.

JSMA Large Scale Sculpture Installation Advisory 11/25/19 – 11/27/19

Update 11/22/19: We just learned this morning that the sculpture installation planned for next week will need to be rescheduled.  A notice will be sent when the new dates have been determined.

 

Beginning Monday, November 25th at 7:00 am, through Wednesday, November 27th at 5:00 pm, JSMA will be installing a large scale sculpture in the museum’s north courtyard, with the assistance of a crane. This will affect the JSMA parking lot, bike cage, security entrance, north courtyard, and sidewalk adjacent to the north courtyard.

Work will be performed by Artech and Ness.

For questions or concerns, please contact Miranda Callander at 346-0970 or mirandac@uoregon.edu.

Millrace 3 Hot Water Shutdown 10/16/19

Update 3/4: One of the mixing valves was replaced on 2/28 and is working well. Repairs will continue to be on Fridays until all the mixing valves have been replaced.

 

Update 1/7: This project is not yet complete. The mixing valves needed to complete the repairs have still not arrived.

 

Update 11/21: This project is not yet complete. The mixing valves needed to repair the hot water to rooms 144C, 146, and 157 have not arrived. Repairs should be completed over winter break.

 

Update 11/20: This project is complete.

 

Update 10/18:

The hot water has been restored to all areas except the following: Rooms 146, 144C and 157. Room 157 is a standard sink that will not impact the classes/labs but the other locations 146 and 144C are Photo labs and the mixing valves in those locations are currently turned off. We will not have new parts for those locations for several weeks so users will need to use other labs within the building to complete their work. As soon as the parts arrive we will make it a priority to have them installed. Work Control will provide additional updates if more information becomes available.

 

As of October 16th, through midday tomorrow, October 17th end of November winter break February 3rd, the hot water will be shut down to allow Facilities Services to install new equipment.

For questions or concerns, please contact Work Control Center at 346-2319 or workcontrolcenter@uoregon.edu.

Prince Lucian Campbell Restroom Repair 10/21/19-11/6/19

Update 11/4: This project has been extended and is expected to be completed by 11/6/19.

 

Restroom 801 will be closed from Monday, October 21st, to Monday, November 4th Wednesday, November 6th for repairs. The adjacent all-gender restroom, 803, will still be operational.

Work will be performed by Facilities Services’ Carpentry Shop.

For questions or concerns please contact CPFM Work Control Center 541-346-2319 or workcontrolcenter@uoregon.edu.

Event Closes Kincaid and 13th Ave to Alder Street Impacting Traffic, LTD, and Parking 10/25/19

Campus Community,

Due to the 2nd Annual Community Welcome block party on Friday, October 25, street closures in west campus will impact travel and parking. Starting at 6:00 a.m. and extending until 10:00 p.m. on the 25th, Kincaid Street between 12th and 14th will be closed as well as 13th Avenue between Alder and Kincaid.  Throughout the day, the South Kincaid LTD station will be relocated to 14th Avenue, and the North Kincaid station will be relocated to 12th Avenue.  LTD will put signage out indicating the temporary relocation.  Parking along Kincaid Street and 13th Avenue will be temporarily closed.

This event is encouraging the community to use public transportation on Friday, October 25th, due to street and parking closures.

For questions, please contact Larissa Ennis, Assistant Director of UO Community Relations 541-346-2054 or email lennis@uoregon.edu.

 

Deschutes Hall Exterior Window Washing 10/16/19 – 10/17/19

On Wednesday, October 16th, at 8:00 am through Thursday, October 17th, at 5:00 pm, the exterior windows will be washed at Deschutes Hall. Due to the use of the lift, the walkways will be partially blocked, but will not interfere with ADA entrances.

Please close all exterior windows on these dates.

Work will be performed by DDJ.

For questions or concerns, please contact Kevin Farthing at 346-2857 or kfarthin@uoregon.edu.

Willamette Hall Sidewalk Closure 11/1/19

Update 10/24:

The date of the sidewalk closure has changed and will now be occurring on 11/1/19.

 

On Friday, November 1st, Beginning Friday, October 25th and continuing through Monday, October 28th, a portion of the Willamette Hall sidewalk, on the north side of 13th, will be closed for safety reasons.  Renovations in the basement require new concrete, which will be delivered via a pump hose from a truck on 13th Avenue.

Work will be performed by Lease Crutcher Lewis.

For questions or concerns, please contact Denise Stewart at 541-335-1258 or dstewart@uoregon.edu.

 

 

Klamath Hall Steam Shutdown 10/24/19 – 10/25/19

On Thursday evening, October 24th at 7:00 pm, until Friday morning, October 25th at 7:00 am, steam (not clean steam) will be offline in order to modify steam and condensate piping for connecting to the 3rd floor renovation.  Heating water temperatures will likely be reduced until the steam is restored, at which time the temperatures will return to normal.

Temporary heaters will be supplied to controlled temperature rooms.

Work will be performed by Lease Crutcher Lewis.

For questions or concerns, please contact Denise Stewart at 541-335-1258 or dstewart@uoregon.edu.

 

 

Streisinger Room 266 Mold Clean Up Notice

Belfor will be conducting a cleaning in Streisinger 266 tomorrow starting at 8:30 AM. We anticipate the work will take all day. Belfor will clean all surfaces with an approved disinfectant and an air scrubber. EHS will inspect and approve upon completion. We have had minimal time to plan and set this up, so we may have to make adjustments on the fly once we get started. Should Belfor need ventilation to complete the work, we’ll have to work with them to find a way to get that set up. Hopefully this will not be necessary.

After cleaning has been finished, EHS will treat the space with our ozone generator.  Ozone treatment will occur on Thursday evening and again on Friday evening. Room 266 will be off limits until Monday morning, with signage on the door barring entry.

Please contact me (Adam Jones 346-8397 asjones@uoregon.edu) if you have any questions.

Fenton Hall Exterior Window Washing 10/10/19 – 10/11/19

On Thursday, October 10th through Friday, October 11th, the exterior windows will be washed at Fenton Hall.  Due to the use of the lift, the walkways will be partially blocked, but will not interfere with ADA entrances.

Please close all exterior windows on these dates.

For questions or concerns, please contact Kevin Farthing at 346-2857 or kfarthin@uoregon.edu.

Willamette Hall RO Water and Gas Shutdown 10/16/19 – 10/17/19

On Wednesday evening, October 16th at 10:30 pm to Thursday morning, October 17th at 4:30 am, the RO water in the basement will be shutdown, plus the natural gas, for the whole building, will be offline.  This will allow the contractor to isolate the RO water and natural gas utilities for renovation in the basement.

Work will be performed by Lease Crutcher Lewis.

For questions or concerns, please contact Denise Stewart at 541-335-1258 or dstewart@uoregon.edu.

 

Tykeson Hall Concrete Work and Noise Advisory 10/10/19 – 10/15/19

As part of the Tykeson Hall project, Fortis Construction will be demolishing and pouring concrete on the west side of Tykeson Hall. Work will occur on Thursday, October 10th at 7:00 am until Tuesday, October 15th at 4:00 pm.

There will be construction noise related to demolition, minor excavation, pipe cutting, concrete trucks and back-up vehicular beeping.  This will impact Tykeson, Chapman, Fenton, JSMA, and Johnson Halls.

For questions or concerns, please contact Martina Oxoby at 541-346-5880 or moxoby@uoregon.edu.

 

Allen Hall Fire Sprinkler System Shutdown 10/12/19

On Saturday, October 12th from 6:00 am to 2:30 pm, fire sprinkler system work will take place in Hallway 112 in the lower level of Allen Hall.  This shutdown is a follow-up to the one that occurred on October 5th.  Three additional upright sprinkler heads are required to be installed in the hallway.  IES will provide fire alarm support.  A fire watch will be in place and the sump floor drain in the Data Center sprinkler room will be monitored.

Work will be performed by Harvey & Price and IES.

For questions or concerns, please contact Gene Mowery at 541-335-5593 or gmowery@uoregon.edu.

Allen Hall Fire Sprinkler System Shutdown 10/5/19

On Saturday, October 5th from 6:00 am to 3:00 pm, fire sprinkler system work will take place in Hallway 112 in the lower level of Allen Hall. A new branch line will be tapped into an existing capped line and extended down the hallway.  IES will provide fire alarm support.  Fire watch will be in place, and the sump floor drain in the Data Center sprinkler riser room will also be monitored.

Work will be performed by Lease Crutcher Lewis, Harvey & Price, and IES.

For questions or concerns, please contact Gene Mowery at 346-5593 or gmowery@uoregon.edu.