LISB Domestic Hot Water Emergency Shutdown 9/13/19

Update: The plumbers have discovered that the domestic hot water shut down will also affect cage washers.

 

Effective immediately, September 13th, the domestic hot water has been shut down in LISB.  This is expected to be off throughout the weekend and into Monday. This will affect all sinks in the restrooms and break rooms, plus the showers.

Industrial hot water to the labs has not been affected, and will remain operational.

If you have any questions or concerns, please contact Ken Straw at 346-5406 or kstraw@uoregon.edu.

 

Hendricks Hall Drinking Water Notification Update 9/12/19

In August of 2019, CPFM installed filters on all of the drinking fountains in Hendricks Hall.  EHS collected confirmation samples on August 26, 2019, and results were received yesterday.  Results show that the issues have been successfully mitigated.  The water from the drinking fountains is now safe to drink and the fixtures have been returned to service.  See the table below for the initial lead results and the confirmation results after filters were installed.

Room Number, Name Fixture Type Initial Result (PPB) Confirmation Result (PPB)
L119 – First floor lobby Drinking fountain 4.56 2.06
L119 – First floor lobby Bottle fill station 4.29 4.41
L219 – Second floor lobby Drinking fountain 27.1 4.29
L319 – Third floor lobby Drinking fountain 56.7 2.47

Iron content has also shown significant reduction, dropping from 1,610 ppb to 69.4 ppb.  Iron is a by-product of water sitting in the plumbing during periods of low building use and is considered a secondary contaminant by the EPA.  That is, it affects taste and appearance of the water as opposed to the health of building users.  Please note that discoloration may return during periods of low use and can be cured by flushing several gallons of water through the fixture.

Additional information on the University’s Drinking Water Monitoring program and a link to results posted online can be found at https://safety.uoregon.edu/drinking-water-monitoring.

 

Millrace Studio 3 Planned Heat and Hot Water Shutdown 8/26 – 9/6/19

Update 9/5/19:

This project has been extended by three days and is expected to be completed on 9/6/19 after the power is connected to the new water heater.

 

Beginning Monday, August 26, at 8 a.m., Facilities Services technicians will shut off all heat and domestic hot water to Millrace Studio 3 while they perform planned repairs. Technicians will restore both heat and hot water services by Tuesday Friday, September 3 6.

CPFM Facilities Services technicians will complete this work.

Please refer any questions or concerns to CPFM Work Control Center at 541-346-2319.

 

 

Thompson University Center Planned Domestic Hot Water Shutdown 8/22/19

On Thursday, August 22 from 10 a.m. – 3:30 p.m., domestic hot water in Thompson University Center will be shut off while Facilities Services replaces a recirculation pump. This will impact all bathroom and break room sinks in the building, as they will have no hot water while plumbers replace the pump.

CPFM plumbers will perform this work.

Please direct questions or concerns to Work Control Center at 541-346-2319.

Thompson University Center is located at 720 E. 13th Ave.

 

Vivian Olum Child Development Center Room 103 Renovation 8/26/19 – 8/30/19

From Monday, August 26 through Friday, August 30, Facilities Services will renovate Room 103 in the Vivian Olum Child Development Center. Renovations involve carpentry and plumbing work to modify the height of the cabinet and sink. Occupants can expect to hear normal and occasional construction noises, such as drilling and cutting, and may observe UO Facilities personnel entering/exiting the building with tools and materials during regular business hours.

At this time, Facilities Services anticipates no utility disruptions or shutoffs; however, Facilities Services will provide additional notice(s) should any services unexpectedly be disrupted or shut down.

Please contact Justin Grishkin with questions or concerns at 541-346-5242 or jgrishki@uoregon.edu.

University Health, Counseling, and Testing – Domestic Hot Water Shutdown 8/12/19

On Monday evening, August 12th from 6:00 pm to 10:00 pm, domestic hot water will be shut off while new water heaters are installed.  The hot water is expected to be restored within four hours.

Work will be performed by Lease Crutcher Lewis.

For questions and concerns, please contact Colin Brennan at 541-654-2972 or brennan@uoregon.edu.

PeaceHealth North Water Shutdown 7/17/19

On Wednesday morning, July 17th, between 6:00 am and 8:30 am, there will be an isolated water shutdown.  Plumbers need to turn off water to install a new valve in room #454.  This shutdown may temporarily affect water flow in some or all nearby bathrooms (486, 487, 488, 408, and 418).  We will post signs at the locations that will be temporarily shut down.

This is part of the ongoing project being performed by Lease Crutcher Lewis.

If you have any questions or concerns, please contact CPFM Design and Construction Project Manager Tim Allenbaugh at 346-8214 or timallen@uoregon.edu.

Lawrence Hall Domestic Hot and Cold Water Shutdown 6/28

Facilities Liaisons,

Our contractor Harvey and Price needs to make a repair that involves shutting down the domestic hot and cold water at Lawrence Hall.  We have coordinated 6:00 am – 8:00 am with Kyle Harshbarger, College of Design Facilities Manager.   This will impact plumbing fixtures building wide.  The restrooms will be temporarily closed during this outage.

Contact:  Work Control Center

For questions or concerns please contact CPFM Work Control Center at 541-346-2319

Water Shutdown Impacting Buildings: 108, 109, 110, 111, 112, 115 & 116 (6/27)

Facilities Liaisions,

On June 27 from 7:00 am – 3:30 pm Facilities Services needs to temporarily shut down the domestic cold and hot water that services the following buildings:

Quonset 108
Greenhouse Preparation 109
Old Greenhouse 110
Research Greenhouse 111
Paleoecology Research 112
MNCH Prep Lab 115
Archaeology Research 116

This is necessary for Greenhouse Operations swamp cooler repairs. The Greenhouse is dealing with a failed value and having to manually put water in the units. There are restrooms available in the CPFM Administration Building and portable toilets outside the CPFM Warehouse that can be accessed during this outage.

We appreciate your patience as we make urgent repairs to the swamp coolers.

For questions or concerns please contact CPFM Work Control Center at 541-346-2319

Water Shutdown Impacting Cascade Hall and Price Science Commons 6/20

Facilities Liaisons,

Due to emergency repairs to a toilet on the third floor of Cascade Hall the domestic water will need to be temporarily shut down until 2 pm on Thursday, June 20.

This will impact Price Science Commons and Cascade Hall.

Facilities Services confirmed that this would not impact the Cafe because it closed during this time. This will not impact the industrial cold water.

Contact:  Work Control Center

For questions or concerns please contact the Work Control Center at 541-346-2319.

Onyx Bridge Heating Water Shutdown 6/11

Facilities Liaisons,

As part of the Onyx Elevator upgrade contractors need to shut down the building heating water loop that services Onyx Bridge. This will impact heating water building wide on June 11, 2019, from 8:00 am – 4:00 pm. The hope is with warmer weather this will have limited impact to occupants. The work will be performed by Fortis.

For questions or concerns please contact CPFM Design and Construction Project Manager Bruce Budzik at 541-346-8834.

 

University Health Center Water Shutdown 6/10/19-6/11/19

On Monday evening, June 10th from 6:00 pm until Tuesday morning, June 11th at 6:00 am, domestic hot/cold and chilled water will be shutdown to make utility connections for the new addition.

Work will be performed by LCL.

If you have any questions or concerns, please contact CPFM’s Design and Construction Owner’s Representative Colin Brennan at (541) 346-8242 or brennan@uoregon.edu.

 

Living Learning Center – south domestic water shutdown 5/1

Facilities Liaisons,

Due to construction the domestic water to Living Learning Center south will be temporarily shutdown Wednesday, May 1 from 12:00 pm – 4:00 pm.   This will impact restrooms and sinks.  Hoffman Construction will provide two portable restrooms outside on the southwest corner of LLC south.

This shutdown has been coordinated with Housing.

For questions or concerns please contact CPFM Design and Construction Facilities Engineer Sarah Follet at 541-346-8264.

Oregon Hall Hot Water Shutdown 3/26

Facilities Liaisons,

Due to immediate repairs to the hot water heater that services Oregon Hall the building will be without hot water until parts arrive and repairs can be completed. Updates will be sent out when the plumbing shop has additional information. This will impact restrooms and breakrooms building-wide

For questions or concerns please contact CPFM Work Control Center at 541-346-2319.

Millrace I, II & III Potable Water Shutdown 3/27

Facilities Liaisons,

Potable water will be shut off to the Millrace Studios I, II, & III on March 27 for the entire day to repair a leak on the potable water line. This shutdown requires a sink and restroom closure. The contractor Roto-Rooter will completing repairs. Crews hope to have service restored by 5:00 pm.

For questions or concerns please contact CPFM Facilities Services Associate Director Kevin Farthing at 541-359-6633.

Klamath Hall Immediate Domestic Hot Water Shutdown 2/4

Building Occupants,

The Klamath industrial heating water is controlled by an actuator valve that failed. In order to keep the industrial heating online, the domestic heating water actuator was swapped over to the industrial side. The result is there will be no domestic heating water until the new actuator arrives, currently nine days. Staff is working to see if the order can be expedited.

Work Control will continue to provide updates as new details are received.

Please contact Stacy Breaux 541-521-5376 and Ron Warren 541-515-4728 with questions or concerns.

This email was sent to building occupants based on spatial data contained in UO Spaces for Klamath Hall and Facilities Liaisons.

EWEB Water Main Replacement Water Shutdown 12/18

On December 18 from 6:00 pm – 10:00 pm our utility provider EWEB is planning their first tie-in between the new water pipeline and the existing water pipeline on 17th Ave. EWEB has chosen evening hours to minimize impacts to the campus community activities.

EWEB anticipates this will impact the following UO Buildings:

Olum Child Development Center
Student Conflict Resolution Center
Ombuds Program
Oregon Law Clinic
CPFM Grounds House

Non UO Building:

Eugene Fire Department

For questions or concerns please contact EWEB Chris Irvin, P.E. Senior Engineer, Water Engineering at 541-685-7619 christopher.irvin@eweb.org

Immediate Domestic Hot Water Shutdown – Klamath Hall 11/21

This is a notification of an immediate emergency shutdown on 11/21 for the heat exchanger located in Klamath Hall Room B045.  Due to a failed component on a circulation pump occupants may experience a lack of hot water in restroom fixtures starting at 1:00 pm.  This may also impact certain lab sinks during this outage and repair.  Crews hope to have the hot water restored by 4:00 PM today.

 

Please direct all questions to CPFM Work Control at 541-346-2319.

 

This notice has been sent to building occupants in Klamath.

[ESSLINGER & MCARTHUR COURT] Domestic Water Shutdown 7/10

[CASCADE ANNEX & ONYX BRIDGE] Steam Shutdown 6/18 – 6/25

Building Occupants,

Starting Monday, June 18, 2018, at 10:00 am through the following Monday, June 25, 2018, ending at 10:00 am steam that services Cascade Annex and Onyx Bridge will be shut down for repairs. Work will be performed by CPFM Utilities and Energy and an Outside Contractor.

This shutdown will impact all services that utilize steam, steam heat, and steam hot water systems.

For questions or concerns please contact CPFM Design and Construction Project Manager Jana Gerow at 541-346-8317 Office or 970-640-0176 Cell

6/19: Pacific Hall Steam and Hot Water Shutdown

Building Occupants,

As part of the B-2 project Andersen Construction is installing a steam meter on Tuesday, June 19, 2018, from 7:00 am – 5:00 pm at Pacific Hall. This shutdown will require the steam to be offline during this time and will impact the entire building.  Domestic hot water and lab hot water will be temporarily run cold during this time.

For questions or concerns please contact CPFM Design and Construction Project Manager Jen Miley at 541-346-1530

4/18: Volcanology Domestic Water Shut-Down

UPDATE:  Water has been restored.

Campus Community,

As part of a renovation in the Volcanology building, rooms 120 and 225, domestic water will be shut down in the building on Wednesday, April 18 from 8:00 am-10:00 am. As a result, bathrooms and drinking fountains will be inoperable during the shut-down.

For questions or concerns about this project or outage, contact Owner’s Representative, Colin Brennan with CPFM Design and Construction at (541) 346-8242.