On Monday, November 4th, from 6:00 am to 8:00 am, the fire sprinkler system will be shut down in the basement level.  This will allow the contractor to adjust the location of one fire sprinkler head plus an additional head near the west entry into the lower level of the building.  The rooms specifically affected are 001K and 003B.

Work will be performed by Preferred Construction.