11/30/22 Campus AMAG Academic Break and Holiday Door Locks 2022/2023

FASS-IT NOTICE

WHO IS AFFECTED: This notice was shared with AMAG Requestors

WHAT IS HAPPENING:

Campus administration is changing the UO policy on how buildings are locked during academic breaks and holidays. A note from Safety and Risk Services with the new policy details is below.

FASS-managed AMAG doors will be locked during campus breaks and holidays unless listed as a policy exception or with special approval. Card access for authorized individuals will still work over breaks and holidays, but FASS-managed doors will be LOCKED on the following dates in December/January:

  • Friday, 12/9/2022 5:00 PM – Tuesday 1/3/2022 7:00 AM

If FASS manages your door schedules and you need the doors unlocked during these days, please email fass@uoregon.edu or call the FASS Service Desk at 541-346-2455 in advance. The Campus Vulnerability and Assessment Team needs to review and approve all academic break and holiday building unlock requests for FASS-managed doors. Please contact the Card Office for getting prox access for individuals who may need it.

The following is a note from Safety and Risk Services: The purpose of this email is to share details of a new door lock procedure for observed holidays and academic breaks. The new procedure is designed to protect against theft and vandalism, while also providing access to specific public facing buildings on the UO’s campuses, as follows:

  • Most university building doors will be locked during observed holidays and academic breaks as defined below.
  • Some buildings with public facing services may not be subject to the locking schedule, especially during academic breaks. These building are listed in the procedure.
  • Faculty, staff, and student employees should already have either keys or prox card access to enter buildings during these times. Those who do not have access, may request it through their department coordinator.
  • Finance and Admin Shared Services IT (FASS-IT) will send reminders out through the AMAG requestors list as a reminder prior to each of the door locking dates. Those reminders will include instructions for adding prox card access for those who may need it.
  • No changes will be made to individual access, so anyone with existing access will still be able to access their normal locations.

Authorized individuals may request exceptions to the locking procedure, by meeting specific criteria listed in the procedure. Requests for exceptions can be submitted to FASS IT by calling 541-346-2245 or by emailing fass@uoregon.edu, providing as much advance notice as possible and noting which exception criteria their situation meets . FASS-IT will consult with the Campus Vulnerability Assessment Team on approval of exemptions.

 

Holiday – Veterans Day, 2022 5 PM, Thursday, November 10, 2022 7 AM, Monday 14, 2022  
Holiday – Thanksgiving 5 PM, Wednesday, November 24, 2022 7 AM, Monday, November 28, 2022  
Academic Break – Winter Break 5 PM, Friday, December 9, 2022 7 AM, Tuesday, January 3, 2023  
Holiday – Martin Luther King, Jr. Day 5 PM, Friday, January 10, 2023 7 AM, Tuesday, January 17, 2023  
Academic Break – Spring Break 5 PM, Friday, March 24, 2023 7 AM, Monday, April 3, 2023  
Holiday – Memorial Day 5 PM, Friday, May 26, 2023 7 AM, Tuesday, May 30, 2023  
Holiday – Juneteenth 5 PM, Friday, June 16, 2023 7 AM, Tuesday, June 20, 2023 Graduation occurs on Tuesday, June 20, 2023
Academic Break – Period between Spring and Summer terms 5 PM, Tuesday, June 20, 2023 7 AM, Monday, June 26, 2023  
Holiday – Independence Day 5 PM, Monday, July 3, 2023 7 AM, Wednesday, July 5, 2023  
Holiday – Labor Day 5 PM, Friday, September 1, 2023 7 AM, Tuesday, September 5, 2023  

 

11/29/22 Science Buildings Closure

UPDATE:
Eugene Springfield Fire has given the all clear to re-enter the science buildings.  All spaces except Pacific 332 are safe for normal activities.

 

Begin:  Effective Immediately – November 29th, 2022

End:    Unknown  November 29th, 2022

Building(s) or Area(s) Affected:  All Science Buildings

Scope:  Due to a chemical spill, the fire department is requiring that no one enter the Science Complex Buildings from Lawrence east to Lewis Integrative Science Building.

ContactJim Cody, CPFM Associate Dir. of Facilities Services, 541-346-2302

Information on current construction and impacts can be located on UO Maps

11/29/22 Pine Mountain Observatory Electrical Outage

Begin:  Tuesday, November 29th, 2022 at 10:00 am

End:      Tuesday, November 29th, 2022 at 3:00 pm

Building(s) or Area(s) Affected:  Pine Mountain Observatory

Scope:  There will be a planned power outage to allow Central Electric to do some system improvement work at their Hampton Substation.

If temperatures will be below freezing, the outage will be cancelled and rescheduled at a later date.  A call will be placed notifying Pine Mountain if the outage is taking place as scheduled or if it has been cancelled.

Services Impacted:  Power is expected to be offline for approximately 5 hours.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  Central Electric Cooperative, Inc.

Contact:  Brent ten Pas, Director of Member Services and Public Relations 541-548-2144

Information on current construction and impacts can be found at UO Maps

11/28/22 – 12/16/22 Walnut Street Sidewalk Repair Advisory

Begin:  Monday, November 28th, 2022

End:      Friday, December 16th, 2022

Building(s) or Area(s) Affected:  Sidewalks on the East and West side of Walnut Street between Franklin Blvd. and East 15th Ave.

Scope:  Sections of the sidewalk will be closed for repairs, starting on the East side of Walnut, in front of the Transportation Services building, then moving down the West side, beginning at Franklin Blvd. moving south down to East 15th Ave.

Services Impacted:  Sections of the sidewalk will be closed as repairs are being made

Work Performed By:  Pacific Excavation

ContactGabe Hein, CPFM Facilities Services, 541-346-2319

Information on current construction and impacts can be found at UO Maps

11/28/22 – 12/7/22 Huestis Hall Demolition Noise Advisory

Begin:  Monday, November 28th, 2022 at 6:00 pm

End:      Wednesday, December 7th, 2022 at 2:00 am

Building(s) or Area(s) Affected:  Huestis Hall, Lokey Labs and Streisinger Hall

Scope:  Demolition of the brick pavers in the North and South interior lobbies of the first floor in Huestis Hall will be performed.  This work will be done during the evening hours to limit the disruption to building occupants.

Services Impacted:  Noise and vibration can be expected in the basements of Huestis and the surrounding buildings.

Work Performed By:  Staton and Lewis

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts can be found on the UO Maps site

11/28/22 – 11/29/22 13th Avenue Garage Elevator #2 Emergency Repair Shutdown

UPDATE 11/29/22
The elevator has been repaired and returned to service.

 

Begin:  Effective immediately – Monday, November 28th, 2022

End:   Possibly Tuesday, November 29th, 2022 or Wednesday, Nov. 30th, 2022

Building(s) or Area(s) Affected:  13th Avenue Garage

Scope:  Elevator #2 has been shut down for repairs.  Parts have been ordered and are expected to arrive tomorrow or Wednesday.

Services Impacted:  Elevator #2 is offline.  Please use the other elevator or stairs.

Work Performed By:  Otis Elevator

ContactRob Berg, CPFM Facilities Electrical Supervisor, 541-346-2313

Information on current construction and impacts can be located on UO Maps

11/22/22 Onyx Bridge Fume Hood Intermittent Shutdowns

UPDATE:
The fume hood shutdown was postponed and has been rescheduled for Tuesday, November 22nd.

 

BeginThursday, November 10th, 2022 Tuesday, November 22nd, 2022 at 8:00 am

End:      Thursday, November 10th, 2022 Tuesday, November 22nd, 2022 at 3:00 pm

Building(s) or Area(s) Affected:  Onyx Bridge

Scope:  Intermittent fume hood shut downs will occur to allow for servicing of equipment.

Services Impacted:  Individual outages of fume hoods are expected to be 5 – 10 minutes in duration.

Special Instructions:  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Work Performed By:  CPFM Facilities Services Mechanical Shop

ContactJim Cody, CPFM Associate Dir. of Facilities Services, 541-346-2302

To view current construction and impacts, visit UO Map.

11/17/22 1715 Franklin Building Recycling Program Informational Notice

Dear 1715 Franklin Building Occupants,

The CPFM Zero Waste Program will setup multiple recycling collection sites on each floor of the 1715 Franklin Building near the elevator starting Thursday, 11/17/22.  The attached floor plans detail where these sites are located.

The following sorting guide details the items accepted in our program.  All corrugated cardboard still needs to be taken to the recycling dumpster on the outside of the building.

Below is a link to a recent video the CPFM Office of Sustainability created that details more about UO’s recycling efforts:

https://youtu.be/6_HMfxmuqsY

If you have any questions about this recycling program inside the 1715 Franklin Building, please contact Donny Addison at addisdt@uoregon.edu.

1715 site locations

 

11/16/22 Volcanology, Pacific, Cascade, and Columbia Halls Steam Shutdown Advisory

Begin:  Wednesday, November 16th, 2022, at 7:30 am

End:      Wednesday, November 16th, 2022, at 3:00 pm

Building(s) or Area(s) Affected:  Volcanology, Pacific Hall, Cascade Hall, and Columbia Hall

Scope:  A valve installation related to an emergency steam pipe replacement will be conducted

Services Impacted:  Steam will be shutdown and there will be no heat or hot water to the buildings for the duration of the work.  This work will be expedited as much as possible and steam service restored following its completion.

Work Performed By:  S2 Industrial

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.

11/14/22 – 1/31/23 Pacific Hall Rooms 203 and 204 Minor Interior Work Advisory

Begin:  Monday, November 14th, 2022

End:      Tuesday, January 31st, 2023

Building(s) or Area(s) Affected:  Pacific Hall Rooms 203 and 204

Scope:  There will be intermittent minor interior work being done in rooms 203 and 204 over the next several months.

Services Impacted:  Occasional noise may be heard in the surrounding area.

Work Performed By:  CPFM Facilities Services

ContactBrianna Liberty, CPFM D&C Design Associate, 541-346-7612 or 541-556-9618

Current construction and impacts can be found on the UO Maps site.

11/14/22 Susan Campbell Hall Steam Shutdown Advisory

Begin:  Monday, November 14th, 2022 at 8:00 am

End:      Monday, November 14th, 2022 at 1:00 pm

Building(s) or Area(s) Affected:  Susan Campbell Hall

Scope:  The steam will be shutdown to the entire building to upgrade radiator control valves in rooms 132 and 150

Services Impacted:  The Heating for the entire building will be down for the duration of this work

Work Performed By:  CPFM Facilities Services Mechanical Shop

ContactWork Control Center, Campus Planning and Facilities Management, 346-2319

To view current construction and impacts, visit UO Map.

11/11/22 University Hall and Villard Hall Parking Lot Closure Advisory

Begin:  Friday, November 11th, 2022, at 7:00 am

End:      Friday, November 11th, 2022, at 5:00 pm

Building(s) or Area(s) Affected:  Villard Hall, University Hall, Parking Lot 9

Scope:  As part of the Heritage Project, some exploratory excavation will be performed around both University Hall and Villard Hall.  This work has been scheduled to take place during an observed University holiday to minimize disruption to classes and parking.

Services Impacted:  Parking Lot 9 between University and Villard Halls will be closed during this work, and the noise from the machinery will be quite loud.

Work Performed By:  Fortis Construction

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

To view current construction and impacts. visit UO Map.

11/10/22 Huestis Hall Basement Fire Suppression System Shutdown

Begin:  Thursday, November 10th, 2022 at 6:00 am

End:      Thursday, November 10th, 2022 at 3:30 pm

Building(s) or Area(s) Affected:  Huestis Hall Basement

Scope:  The fire suppression system will be offline in the Huestis basement to accommodate duct work removal in break room 31.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Harvey & Price

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

11/09/22 Hendricks Hall Power Washing Noise Advisory

Begin:  Wednesday, November 9th, 2022

End:      Wednesday, November 9th, 2022

Building(s) or Area(s) Affected:  Hendricks Hall

Scope:  Power Washing on the sidewalk North West of Hendricks Hall will be taking place today

Services Impacted:  No services are expected to be impacted however, some noise from the equipment may be heard inside the building

Work Performed By:  CPFM Facilities Services Maintenance Shop

ContactGabe Hein, CPFM Facilities Services, 541-346-2319

To view current construction and impacts, visit UO Map.

11/09/22 – 1/6/23 Area between Volcanology and Columbia Hall Excavation/Utility Work Advisory

UPDATE 11/29/22:

Due to some necessary engineering changes on this project the tentative completion date is now Friday, January 6th, 2023.  The steam will still be restored as scheduled after today’s work, 11/29/22 at 3:00 pm.

UPDATE 11/22/22:
Due to piping connections needing to be made as part of the emergency steam pipe repair project, steam service will be shut down on Tuesday, November 29th, 2022 from 7:00 am until 3:00 pm in Volcanology.
There will be no heat or hot water to the building for the duration of the work.
Steam service will be restored following its completion.

 

UPDATE 11/17/22:
S-2 Contracting will be performing core drilling, adjacent to Columbia Hall, as part of the Volcanology steam pipe emergency replacement project. They will begin work prior to building occupancy, starting at 7:00 am, and will be keeping noise to a minimum, as much as possible. The noise will be intermittent at times during the course of their work, but should not be at a level that will prevent normal operations.  They are expected to complete their task by 12:00 noon.

Begin:  Wednesday, November 9th, 2022 at 7:00 am

End:      Wednesday, November 30th, 2022 at 4:00 pm Friday, January 6th, 2023 at 4:00 pm

Building(s) or Area(s) Affected:  Area between Volcanology and Columbia

Scope:  Excavation activities will be taking place for several days, between 11/9/22 and 11/16/22, generating construction noise and possible vibration. Upon completion of excavation, piping installation work will follow, with an estimated end date of 11/30/22.

Services Impacted:  Fencing will be installed around the perimeter of the work area (shown as pictured) prior to the beginning of construction activities, which will restrict travel between the Volcanology building and Columbia Hall.

Special Instructions:  Please plan to take an alternate routes of travel during this time.

Work Performed By:  S2 Industrial and Pacific Excavation

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.

 

11/08/22 – 11/09/22 Price Science Commons Ground Floor Restroom Shutdown

Begin:  Tuesday, November 8th, 2022 – effective immediately

End:      Wednesday, November 9th, 2022

Building(s) or Area(s) Affected:  Price Science Commons Ground Floor Restroom

Scope:  Due to a clogged line, repairs need to be made in the All-Gender Restroom next to the Elements Café.  Work is expected to be completed tomorrow.

Services Impacted:  The ground floor restroom is closed.  Please use the restrooms on the lower level.

Work Performed By:  CPFM Facilities Services Plumbing Crew

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

To view current construction and impacts, visit UO Map.

11/08/22 Zebrafish International Resource Center Steam Shutdown

Begin:  Tuesday, November 8th, 2022 at 11:00 am

End:      Tuesday, November 8th, 2022 at 3:00 pm

Building(s) or Area(s) Affected:  Zebrafish International Resource Center

Scope:  Due to a leaking main steam valve, the steam will be shut down to make repairs.

Services Impacted:  This will affect the building heat and the domestic hot water.

Work Performed By:  CPFM Utilities & Energy

ContactKyle Wilson, CPFM Utilities Maintenance Manager, 541-346-2246

To view current construction and impacts, visit UO Map.

 

11/08/22 – 12/9/22 Knight Law Restrooms 166, 167, 231A Construction Advisory

UPDATE:  The end date for this work has been extended out to Friday, December 9th, 2022, each restroom will be closed as they are being worked on.

Begin: Tuesday, November 8th, 2022

End: Thursday, November 17th, 2022 Friday, December 9th, 2022

Building(s) or Area(s) Affected: Knight Law Restrooms 166, 167, and 231A

Scope: Three restrooms will be offline to replace toilet stall partitions.

  • 11/08/22 – 11/09/22 Restroom #231A
  • 11/10/22 – 11/14/22 Restroom #166
  • 11/16/22 – 11/17/22 Restroom #167

Services Impacted: The three restrooms will be out of order during their assigned dates.  The three restrooms will be closed as they are being worked on.

Special Instructions: Please use other restrooms located in the building.

Work Performed By: CPFM Facilities Services Night Maintenance Crew

Contact: David Cates, CPFM Design Mgr. and Staff Architect, 541-346-8238

To view current construction and impacts. visit UO Map.

11/07/22 Jordan Schnitzer Museum of Art Fire Alarm System Advisory

Begin:  Monday, November 7th, 2022, at 9:00 am

End:      Monday, November 7th, 2022, at 1:00 pm

Building(s) or Area(s) Affected:  Jordan Schnitzer Museum of Art, Rm. 124

Scope:  The remodel project in JSMA 124 requires adding additional fire sprinklers to the fire alarm system

Services Impacted:  Fire Alarm System in Room 124 only

Work Performed By:  Harvey & Price and IES

ContactDavid Mason, CPFM Owner’s Representative, 541-346-5679 or 541-852-5659

To view current construction and impacts. visit UO Map.

11/03/22 Bean Hall Steam Heating and Hot Water Shutdown

UPDATE:
The work has been completed.

 

Begin:  Thursday, November 3rd, 2022, at 10:00 am

End:      Thursday, November 3rd, 2022, at 3:00 pm

Building(s) or Area(s) Affected:  Bean Hall

Scope:  Due to a steam valve leak in the tunnel, the steam has been shut down to make repairs.

Services Impacted:  This will affect the building heat and the domestic hot water.

Work Performed ByCPFM Utilities & Energy

ContactKyle Wilson, CPFM Utilities Maintenance Manager, 541-346-2246

To view current construction and impacts, visit UO Map.

11/02/22 Huestis Hall Basement Fire Suppression System Shutdown

Begin:  Wednesday, November 2nd, 2022 at 6:00 am

End:      Wednesday, November 2nd, 2022 at 9:00 am

Building(s) or Area(s) Affected:  Huestis Hall Basement

Scope:  The fire suppression system will be offline in the Huestis basement to allow for piping reroutes in the south stair tower.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Lease Crutcher Lewis and Harvey & Price

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

11/01/22 Pacific Hall Vacuum System Shutdown

Begin: Tuesday, November 1st, 2022 at 7:00 am

End: Tuesday, November 1st, 2022 at 12:00 noon

Building(s) or Area(s) Affected:  Pacific Hall

Scope:  The lab vacuum will be shut down to allow a contractor to perform preventive maintenance on the vacuum pump. It is necessary to take the vacuum system offline while the contractor is servicing the pump.

Services Impacted: This will affect all rooms and equipment connected to the building vacuum system.

Work Performed By: Roger’s Machinery

Contact: Kyle Harshbarger, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

To view current construction and impacts, visit UO Map.