4/19/24 Woodshop Domestic Cold Water Shutdown

Begin:  Friday, April 19, 2024, at 8:00 am

End:      Friday, April 19, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Woodshop

Scope: In order to perform final piping connections, domestic cold water will be shutdown.

Services Impacted:  Domestic cold water will be offline during this time.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Woodshop Overhead

3/05/24 Romania Warehouse Domestic Water Shutdown

Begin:  Tuesday, March 5, 2024, at 11:00 am

End:      Tuesday, March 5, 2024, at 1:00 pm

Building(s) or Area(s) Affected:  Romania Warehouse

Scope:  The domestic water will be shut down while a new water meter is installed.

Services Impacted:  Restrooms, sinks, and drinking fountains will be offline during this time.

Work Performed By:  EWEB

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Romania Warehouse

2/22/24 – 2/23/24 Huestis Hall Basement Sanitary Discharge Shutdown

Begin:  Thursday, February 22, 2024, at 6:00 pm

End:      Friday, February 23, 2024, at 3:00 pm

Building(s) or Area(s) Affected:  Huestis Hall basement

Scope:  Sanitary discharge in the Huestis Hall basement will be limited to allow work to be completed in the sanitary pit.

Services Impacted:

  • Restrooms and handwashing sinks in labs and the break room will not be available during this shutdown.
  • Contractor will provide overflow waste bins for lab water discharge at floor sinks and floor drains.

Special Instructions:  Please use restrooms in adjacent buildings.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

map of Huestis Hall

1/10/24 – 1/19/24 Huestis Hall Basement Sanitary Discharge Shutdown

Begin:  Wednesday, January 10, 2024, at 6:00 pm

End:      Friday, January 19, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  Huestis Hall basement

Scope:  Sanitary discharge in the Huestis basement will be limited to allow work to be completed in the sanitary pit.

Services Impacted:

  • Restrooms and handwashing sinks in labs and the break room will not be available during this shutdown.
  • Contractor will provide overflow waste bins for lab water discharge.

Special Instructions:  Please use restrooms in adjacent buildings.

Work Performed By:  Lease Crutcher Lewis, JH Kelly, EC

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

map of Huestis Hall

12/04/23 Huestis Hall Basement Domestic Hot and Cold Water Shutdown

Begin:  Monday, December 4, 2023, at 6:00 am

End:      Monday, December 4, 2023, at 11:30 am

Building(s) or Area(s) Affected:  Huestis Hall basement

Scope:  Domestic hot and cold water will be shut down to allow for final connections as part of the Huestis Hall Deferred Maintenance project.

Services Impacted:  Restroom toilets and sinks, break room sinks, handwashing sinks, and drinking fountains throughout the basement facility will not be available during this time.

Special Instructions:  Please use the facilities in nearby buildings.

Work Performed By:  JH Kelley

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall

 

11/27/23 Huestis Hall Basement Domestic Hot and Cold Water Shutdown

Begin:  Monday, November 27, 2023, at 7:00 am

End:      Monday, November 27, 2023, at 11:00 am

Building(s) or Area(s) Affected:  Huestis Hall basement

Scope:  Domestic hot and cold water will be shut down throughout the basement of Huestis Hall.

Services Impacted:  Toilets, handwashing sinks, and break room sinks will not be available during this time.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall

8/29/23 – 8/30/23 Lawrence Hall First Floor Heating Hot Water and Domestic Hot Water Emergency Shutdown

UPDATE:
Due to unforeseen circumstances, work has been extended through tomorrow at 3:30 pm.
This shutdown is also affecting the north side of the building, too.

 

Begin:  Tuesday, August 29, 2023 – effective immediately

End:      Unknown – Wednesday, August 30, 2023, at approximately 3:30 pm

Building(s) or Area(s) Affected:  Lawrence Hall – first floor and north side of building

Scope:  The domestic hot water and heating hot water has been shut down to make emergency repairs.  They estimate it will be completed by the end of the day.  An update will be sent when services have been restored.

Services Impacted:  Heating hot water and domestic hot water will be offline during this time.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Lawrence Hall

8/12/23 Huestis Hall and Lokey Labs Domestic Water Shutdown

Begin:  Saturday, August 12, 2023, at 7:00 am

End:      Saturday, August 12, 2023, at 3:00 pm

Building(s) or Area(s) Affected:  Huestis Hall Basement, Lokey Labs

Scope:  As part of the Huestis Renovation project, domestic water will be shut down on a Saturday to allow for final connections of the new domestic water main.

Services Impacted:  Handwashing sinks, lab sinks, toilets and drinking fountains will not be available during this event.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall and Lokey Labs

 

8/15/23 – 8/16/23 Huestis Hall Basement Industrial Cold Water and RO Water Shutdown

1st Day:  Tuesday, August 15, 2023, at 7:00 am to 10:00 am

2nd Day:  Wednesday, August 16, 2023, at 7:00 am to 10:30 am

Building(s) or Area(s) Affected:  Huestis Hall Basement

Scope:  As part of the Huestis Hall renovation project, the basement facility will experience two (2) shutdowns to the industrial cold water and RO water supply to allow for the final and permanent new main supply for industrial water and cold water.

Services Impacted:  Lab sinks and equipment on lab cold water will be affected and unavailable during this shutdown.

Work Performed By:  JH Kelley

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall

7/26/23 Prince Lucien Campbell (PLC) Heat for Hot Water Shutdown

Begin:  Wednesday, July 26, 2023, at 8:00 am

End:      Wednesday, July 26, 2023, at 1:00 pm

Building(s) or Area(s) Affected:  Prince Lucien Campbell

Scope:  Heat to all hot water (domestic and heating) in PLC will be turned off to work on a steam line.

Services Impacted:  Water in the building will continue to flow, but it will not get hot.

Work Performed By:  CPFM Facilities Mechanical Shop

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Prince Lucien Campbell Hall

UPDATED: 8/28/23 – 8/30/23 Global Scholars Hall Steam Shutdown

Begin: Wednesday, August 9, 2023 at 2:00 pm  Monday, August 28th, 2023 at 2:00 pm

End:      Friday, August 11, 2023, at 4:00 pm Wednesday, August 30th, 2023 at 4:00 pm

Building(s) or Area(s) Affected:  Global Scholars Hall

Scope:  Due to a failing steam flow meter, the building steam heat and hot water will be shut down to replace the meter and upgrade piping to meet campus standards.

Services Impacted:

  • Building steam heat and the domestic hot water will be offline during this time.
  • Work will take place in the utility tunnel and main mechanical room.

Work Performed By:  S2 Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

 

7/10/23 Living Learning Center North Domestic Water Shutdown

Begin:  Monday, July 10, 2023, at 10:00 am

End:      Monday, July 10, 2023, at 3:00 pm

Building(s) or Area(s) Affected:  Living Learning Center North

Scope:  EWEB will be shutting down a water line fed from Agate Street in order to move a fire hydrant for the Walton Replacement Project. This line will be isolated between Agate Street and a valve north of Living Learning Center North.

Services Impacted:  This will shut down the domestic water line to the LLC North building only, affecting drinking fountains, sinks, and restrooms.

Work Performed By:  EWEB

ContactGeorge Bleekman, CPFM Owner’s Representative, 541-346-2625

Current construction and impacts information can be found on the UO Maps site.

Image of area around Living Learning North

7/06/23 PeaceHealth North Domestic Water Shutdown

Begin:  Thursday, July 6, 2023, at 5:00 am

End:      Thursday, July 6, 2023, at 7:30 am

Building(s) or Area(s) Affected:  PeaceHealth North

Scope:  The main water line that supplies 677 E. 12th is in need of repair.  Work will be performed early in the morning.

Services Impacted:  There will not be any water during this time for drinking fountains, sinks, or toilets until the repair is completed.

Work Performed By:  Rexius and PeaceHealth North

ContactMelinda Seeley, CPFM Campus Planning, Real Estate Property Specialist, 541-346-5550

Current construction and impacts information can be found on the UO Maps site.

Image of PeaceHealth North

6/14/23 – 6/15/23 – 1715 Franklin North Wing Drainage System Shutdown

UPDATE:
While repairs are made to the sewage lift station, seven parking spaces (#8 – #14) will be blocked off for the contractor’s pump truck.  These spots are located directly in front of the east entrance.

Image of parking lot at 1715 Franklin

 

Begin:  Wednesday, June 14, 2023, at 7:00 am

End:      Thursday, June 15, 2023, at 5:00 pm

Building(s) or Area(s) Affected:  1715 Franklin Blvd – North Wing

Scope:  Due to sewage lift station repair/upgrade, all drain piping will be out of service on the first and second floor of the north wing until repairs are complete.

Services Impacted:  This will impact usage of domestic hot and cold water in all sinks, toilets, urinals, and drinking fountains.

Special InstructionsPlease use restrooms and sinks in the south wing.

Work Performed By:  CPFM Facilities and Roto Rooter

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of 1715 Franklin 1st floor north wing

5/26/23 – 6/01/23 – Collier House Sewer Line Emergency Shutdown

UPDATE 6/01/23:
All sinks and restrooms are now operational and can be used.

 

UPDATE 5/26/23:
The second floor kitchen and bathroom will remain out of order until further notice due to issues encountered with the sewer line.  Only the first floor restroom, which is on a separate sewer line, is still operational.  An update will be sent when repairs have been completed.

 

Begin:  Friday, May 26, 2023 – effective immediately

EndUnknown Thursday, June 1, 2023

Building(s) or Area(s) Affected:  Collier House

Scope:  The sewer line has been shut down to remove a clog in the system.  An update will be sent when the drain is back online.

Services Impacted:

  • All drain lines in the building for the sinks and restrooms will be offline.
  • Noise and odor can be expected outside of the building as the contractor jets the system.

Work Performed By:  Roto Rooter

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Collier House

5/09/23 – Unknown – Chapman Hall Basement Women’s Restroom Sink Water Shutdown

UPDATE:  We were informed that this was previously restored.

 

Begin:  Tuesday, May 9, 2023 – effective immediately

End:      Tuesday, May 9, 2023 – unknown

Building(s) or Area(s) Affected:  Chapman Hall Women’s Restroom #002

Scope:  The water to the Women’s basement restroom sinks has been shut down until the necessary parts arrive.  This does not affect the water supply to the toilets.  An update will be sent when the sink water has been restored.

Services Impacted:  The sinks will be out of order until further notice.  Other restrooms are available for use within the building.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of location of women's restroom in Chapman Hall basement

5/02/23 – 5/03/23 – 1715 Franklin North Wing Emergency Drainage System Shutdown

UPDATE:
The sump pump issue has been repaired and the drains are back online.

 

Begin:  Tuesday, May 2, 2023 – effective immediately

End:      Unknown Wednesday, May 3, 2023

Building(s) or Area(s) Affected:  1715 Franklin

Scope:  Emergency shut down of the drains on the first and second floor north wing due to sump pump issues.  A notice will be sent when the drains have been restored.

Services Impacted:  This affects the restrooms, sinks, drinking fountains, and custodial closets in the north wing.  This does not affect the south wing.

Special Instructions:  Please use restrooms and sinks in the south wing.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of 1715 Franklin 1st floor north wing