12/28/23 Huestis Hall Basement Domestic Hot and Cold Water Shutdown

Begin:  Thursday, December 28, 2023, at 7:00 am

End:      Thursday, December 28, 2023, at 1:30 pm

Building(s) or Area(s) Affected:  Huestis Hall basement

Scope:  Domestic water service will be offline to install a new mixing valve for the safety showers as part of the connections with the Huestis Hall project.

Services Impacted:  During this shutdown, the following will not be available for use – restrooms, handwashing sinks, drinking fountains, safety showers.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall

 

7/06/23 PeaceHealth North Domestic Water Shutdown

Begin:  Thursday, July 6, 2023, at 5:00 am

End:      Thursday, July 6, 2023, at 7:30 am

Building(s) or Area(s) Affected:  PeaceHealth North

Scope:  The main water line that supplies 677 E. 12th is in need of repair.  Work will be performed early in the morning.

Services Impacted:  There will not be any water during this time for drinking fountains, sinks, or toilets until the repair is completed.

Work Performed By:  Rexius and PeaceHealth North

ContactMelinda Seeley, CPFM Campus Planning, Real Estate Property Specialist, 541-346-5550

Current construction and impacts information can be found on the UO Maps site.

Image of PeaceHealth North

5/14/22 & 5/21/22 Huestis Hall, Lokey Labs, and Willamette Hall Domestic Water Shutdown – Update

UPDATE:
The fire water line shutdown will still occur 5/14 as scheduled, however the domestic water shutdown has been rescheduled for next Saturday, May 21, due to delays in materials.  Willamette Hall will also be affected by the domestic water shutdown on Saturday, May 21st.

 

 

Fire Water Line:  Saturday, May 14th, 2022 from 7:00 am till 3:00 pm

Domestic Water Line:   Saturday, May 21st, 2022 from 7:00 am till 3:00 pm

Building(s) or Area(s) Impacted:  Huestis Hall and Lokey Labs (and Willamette Hall 5/21)

Scope:  As part of the Huestis Hall Renovation project, the main domestic water line and fire water line will be shut down on Saturday for 8 hours.

Services Impacted:  All services that need water will be unavailable during this time. This could include lab equipment, HVAC building equipment, fire sprinkler systems, and restroom plumbing services.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations.

Work Performed By:  Mortenson Construction

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Columbia Hall Domestic Cold and Hot Water Shutdown POSTPONED

UPDATE 2/3/22: Due to a staff  shortage this shutdown has been delayed. An update will be sent out when it has been rescheduled.

BeginThursday, February 3rd, 2022 at 8:30 am Unknown

End:      Thursday, February 3rd, 2022 at 12:00 noon Unknown

Building(s) or Area(s) Impacted:  Columbia Hall

Scope:  In order to make a valve repair on the domestic cold water system, the domestic cold and hot water will be shut down.

Services Impacted:  All restroom sinks, toilets, urinals will be affected. This includes all the cold water and hot water to lab faucets, drinking fountains, fume hoods, and the safety eyewashes/showers.

Work Performed By:  CPFM FS Plumbing Shop

ContactOlin Vermillion, CPFM Facilities Plumbing, 541-346-2319

Klamath Hall Domestic Hot Water Advisory 8/9/21 – 9/1/21

UPDATE 9/1/21: The domestic hot water is restored.

 

Begin:  Monday, August 9th, 2021 – effective immediately

End:      Unknown

Building(s) or Area(s) Impacted:  Klamath Hall

Scope:  The domestic hot water was found not working today.  It will be luke warm until further notice.  Parts will be order by the BAS shop.

Services Impacted:

  • Domestic hot water temperature reduced to the restrooms, custodial closets, and eyewash stations.
  • This does not affect the Industrial hot water.

Work Performed By:  CPFM BAS and Plumbing Shops

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

Willamette Hall Water Shut Off 2/16 – 2/16

2/22/21 Update for Willamette Hall:

The drying phase of the Willamette Hall Room 156 water intrusion has been completed. Equipment will be removed and the cove base restored today and tomorrow. Carpets in 160, 161, & 162 will then be shampooed and the furnishings removed to their original locations.

The restoration phase of this water intrusion will be managed by CPFM. Please contact CPFM Work Control if you have any questions.

2/19/21 Update:

This is an update to the notification sent on February 18, 2021, regarding the Willamette Hall Room 156 Water Intrusion.

The mitigation equipment has been set up in Willamette Hall, including H160, 160, and 161. The equipment will run for the weekend. We will reassess on Monday morning and remove the equipment as we can.

Please feel free to contact EHS, Adam Jones, 541.346.8397 if you have any questions.

 

A water intrusion has been identified in Willamette Hall. It is currently known to be affecting rooms H160, 160, & 161.

 This intrusion occurred on Tuesday, February 16, 2021 and was the result of a clogged drain in room 156. Impacts to walls and carpets were noted in rooms 160, 161, and H160.

 The mitigation process is tasked with drying all affected materials with the ultimate goal of limiting demolition and preventing mold growth. The mitigation process is managed by Environmental Health & Safety. Mitigation efforts onsite will be conducted by CPFM. During this period, you will see fans and well dryers set up, as well as dehumidification equipment. It is important that this equipment is left running at all times to ensure that impacted building materials are dried appropriately and in a timely fashion. Mitigation is anticipated to be complete by early next week.

 The reconstruction process is tasked with returning the space to finished and operational status. The reconstruction process is managed by CPFM.

 Both mitigation and reconstruction are conducted by University staff whenever possible to save money and reduce complications associated with the work. Outside contractors are used when mitigation or reconstruction scopes exceed our available staff or equipment resources. Further information on the University’s Water Intrusion process can be found by contacting Adam Jones at asjones@uoregon.edu.

Individual departments are responsible for inventorying damaged non-building related items, such as computers, office furnishings, lab equipment, etc. The Office of Risk Management within Safety & Risk Services is available to provide guidance, inventory forms, and other information on the insurance process associated with these claims. This information can be found at https://safety.uoregon.edu/property-claims.

Finally, all future updates associated with this event will be posted to the CPFM BLOG for the event at this link: https://blogs.uoregon.edu/cpfmnotifications/2021/02/16/willamette-hal-water-shut-off-2-16-unknown/

UPDATE: The building water has been restored.

Begin:  February 16, 2021 – Immediately

End:      Unknown – An update will be sent when the water has been restored.

Building(s) or Area(s) Impacted:  Willamette Hall

Scope:  All water in Willamette Hall is unusable. There was a sewage leak and all water to the building is shut off for repairs. This includes toilets, sinks, showers, drinking fountains, etc.

Services Impacted:  All building water.

Extra Notes: An update will be sent when the water has been restored.

Special Instructions: Do not use any water in the building.

Work Performed By:  FS Mechanical Shop

Contact: Richard Vaughan, CPFM Facilities Services, 541-346-2319

Pacific Hall Emergency Water Shutdown 1/6/21

UPDATE:

The broken water line has been repaired and the water has been restored.

 

Begin:  Wednesday, January 6th, 2021 effective at 10:00 am

End:      Wednesday, January 6th, 2021 till approximately 12:00 noon

Building(s) or Area(s) Impacted:  Pacific Hall

Scope:  EMERGENCY water shutdown due to a broken water line.  Expected to take approximately 2 hours to repair.

Services Impacted:  All water will be shut down in the building, including restrooms, sinks, and drinking fountains.

Work Performed By:  CPFM Facilities

ContactKen Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

 

Klamath Hall 3rd Floor RO and Safety Shower Station Shutdown 2/13/2020

UPDATE:  The only safety shower impacted will be room 345.  The 3rd floor RO will still be offline from 9:00 to 3:00 as planned.

 

Begin:   Thursday, February 13th, 2020 at 9:00 am

End:      Thursday, February 13th, 2020 at 3:00 pm

Building or Area Impacted:  Klamath Hall

Scope:  Klamath 3rd floor renovation needs to reroute and isolate the RO water and safety showers stations.

Services Impacted:  RO will be offline on the 3rd floor and the only safety shower impacted will be in room 345.

Work Performed By:  Lease Crutcher Lewis

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258