4/23/24 – 4/26/24 Huestis Hall Rooms 11 and 12 Light Fixture Replacement Advisory

UPDATE:
This work has been rescheduled for next week, April 23 – 26, to align with facility schedules.

  • Room 011 will be offline each day between 7:00 am and 1:00 pm
  • Room 012 will be offline each day between 12:00 noon and 4:00 pm

 

BeginApril 15  Tuesday, April 23, 2024

End:      April 19   Friday, April 26, 2024

Building(s) or Area(s) Affected:  Huestis Hall

Scope:  Light fixtures will be replaced in rooms #011 and #012.

Services Impacted:  Users are encouraged to find alternate spaces during the days the lights are offline.

Work Performed By:  EC Electric

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall rooms 11 and 12

11/13/23, 11/15/23, 11/16/23, 11/30/23 Lokey Labs Electrical Shutdowns

UPDATE 11/14/23:
Due to holiday work schedules, the electrical shutdown planned for Monday, November 20th has been moved to Thursday, November 30th.

 

Dates and Times Involved:

  • Monday, November 13, 2023, at 6:00 am to 9:00 am
  • Wednesday, November 15, 2023, at 6:00 am to 9:00 am
  • Thursday, November 16, 2023, at 6:00 am to 8:00 am
  • Monday, November 20, Thursday, November 30, 2023, at 6:00 am to 8:00 am

Building(s) or Area(s) Affected:  Lokey Labs

Scope:  As part of the Huestis Hall Renovation project, there will be a final series of electrical shutdowns necessary to complete the project of separating the feeder connections from Huestis Hall and refeed Lokey Labs. The final series of electrical shutdowns will occur on November 13, 15, 16, and 20 and will affect Lokey Labs. Affected services and durations are listed by date below.

Monday, November 13, 6:00 am – 9:00 am at Lokey Labs
6:00 am – 7:00am Lighting control panels and lights will be offline for the first hour.
6:00 am – 9:00 am This shutdown will turn off the supply air handling units and lab exhaust fans, chilled water pumps and heating water pumps for 3 hours.  Siemens will monitor for alarms.

Wednesday, November 15, 6:00 am – 9:00 am at Lokey Labs
6:00 am – 7:00 am Lighting control panels and lights will be offline for the first hour.
6:00 am – 9:00 am This shutdown will turn off the supply air handling units and lab exhaust fans, chilled water pumps and heating water pumps for 3 hours.  Siemens will monitor for alarms.

Thursday, November 16, 6:00 am – 8:00 am at Lokey Labs
All normal power supply will be offline for the 2-hour duration. Users are advised to safely power down equipment the night before or ensure that critical equipment is plugged into a standby outlet or UPS.

Monday, November 20, Thursday, November 30, 6:00 am – 8:00 am at Lokey Labs
All normal power supply will be offline for the 2-hour duration. Users are advised to safely power down equipment the night before or ensure that critical equipment is plugged into a standby outlet or UPS.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.  For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu.  For non-copier questions, please reach out to the contact person listed below.

Work Performed By:  EC, Siemens and Lease Crutcher Lewis

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Lokey Labs

10/23/23 Huestis Hall and Lokey Labs Electrical Shutdown

Begin:  Monday, October 23, 2023, at 7:30 am

End:      Monday, October 23, 2023, at 11:00 am

Building(s) or Area(s) Affected:  Huestis Hall, Lokey Labs

Scope:  As part of the Huestis Renovation project, panels fed from temporary power sources will be refed from the new permanent power sources.

Services Impacted:  This shutdown will affect services on electrical panels 4L1 and 2L1 including the Fire Alarm in Huestis and Lokey, hallway lights in Huestis and LEF 1&2 in Lokey Labs. Contractor will provide fire watch.

Copier Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.  For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu.  For non-copier questions, please reach out to the contact person listed below.

Fume Hood Instructions:  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Fire Alarm Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  EC

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall and Lokey Labs

10/12/23 Huestis Hall 16A and 16B Electrical Panel Work Advisory

Begin:  Thursday, October 12, 2023, at 6:00 am

End:      Thursday, October 12, 2023, at 7:30 am

Building(s) or Area(s) Affected:  Hustis Hall

Scope:  As part of the Huestis Renovation project, the basement electrical panels will be refed from temporary power sources to final.

Services Impacted:  This activity will affect lights in 16A and 16B.

Work Performed By:  EC

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

map of Huestis Hall

4/24/23 – 5/05/23 Lillis Hall Room #369 Ceiling and Lighting Construction Work Advisory

Begin:  Monday, April 24, 2023

End:      Friday, May 5, 2023

Building(s) or Area(s) Affected:  Lillis Room #369

Scope:  A new suspended ceiling and lighting will be installed to create a Wellness Room. The construction will begin the week of April 24th.

Services Impacted:  During the installation of the ceiling, for a few hours there may be a series of brief percussive noises as the suspension wires are installed into the flooring above.

Work Performed By:  Bridgeway Construction

ContactJanell Cottam, CPFM Owner’s Representative, 541-346-7536

Current construction and impacts information can be found on the UO Maps site.

Diagram of Lillis Hall Room 369

4/18/23 – 4/19/23 Klamath and Price Science Commons Automation System Panel Upgrades Advisory

Begin:  Tuesday, April 18, 2023, at 6:00 am

End:      Wednesday, April 19, 2023, at 10:00 am

Building(s) or Area(s) Affected:   Klamath Hall and Price Science Commons

Scope:  Due to building automation system upgrades, two Siemens building automation system panels will be upgraded to provide better reliability of the building mechanical systems.  We will perform one panel upgrade per day starting at 6:00 am with systems returning to some level of operation by 8:00 am and all systems operating normally by 10:00 am.

4/18/23: PXCM60 – Located in Klamath Hall,

Systems impacted:
– Air Handling Unit Systems serving Klamath Hall Ground, 1st, and 2nd Floors
– Lab and Domestic Hot Water Heating System serving Klamath Hall
– Terminal HVAC devices and room temperature control serving Klamath Basement, Ground, 1st, and 2nd floor
– Lighting Controls: Lab 261

4/19/23: PXCM187 – Located in Klamath Hall,

Systems Impacted:
– Air Handling Unit Systems serving Price Science Commons and Klamath Basement
– Chilled water System serving Price Science Commons
– Heating Water System serving Price Science Commons and Klamath Hall
– Terminal HVAC equipment serving Price Science Commons
– Domestic Hot Water System serving Price Science Commons

Work Performed By:  Siemens

ContactKevin Waldrop, CPFM Facilities Engineer, 541-346-2315

Current construction and impacts information can be found on the UO Maps site.

Image of Klamath and Price Science Commons

3/20/23 – 3/31/23 Parking Lot 2 (South of CPFM Warehouse) Light Pole Installation Advisory

UPDATE 4/26/23:
We will be blocking four spaces at the base of each of the two poles in Parking Lot 2 for the installation of the security cameras. This will occur Tuesday, May 2nd – Thursday, May 4th.  We do not anticipate any other disruption to the area.  Work will be performed by ADT Security.

 

UPDATE 3/30/23:
A crane truck will be in Parking Lot 2 tomorrow, March 31st, starting at 11:00 am to install the two light poles and heads. Spaces near the pole bases will be blocked tonight after work. The north access lane of the parking lot will be blocked for through traffic during the installation. If you park in this area, be aware you may be blocked during the time of the lift. Parking along the mill race and that access area will remain open.

Diagram of Parking Lot 2

UPDATE 3/07/23:
We will be closing spaces and blocking through traffic in Parking Lot 2, south of the CPFM building.  User’s with B-North Permits are allowed to also park in C lots which include the Millrace Garage.  Fencing will be up around the construction area. Be aware of construction equipment and activity when driving and parking in the remaining spots. The drive through area adjacent to the CPFM building will be re-opened between construction activities as possible.  The drive through in the lot will be closed for the duration.  The majority of the work and space closures will be completed by Monday, March 27.  Additional camera installation and cabling will continue through March 31st.   During the week of March 27th-31st, traffic lanes will be open and only a few spots near the new poles will be blocked for work.

 

UPDATE 2/7/23:
Parking spaces (approx. 35 spaces) and traffic flow in Parking Lot 2 will be impacted during the installation of two light poles with cameras.
We have moved the start date up by three days (3/20/23 – 3/31/23) so that the construction will be completed by the end of Spring Break.
We will coordinate with those using the lot for alternative parking solutions during the construction.
See revised diagram.

 

Begin: Thursday, March 23, 2023 Monday, March 20, 2023

End: Friday, April 07, 2023 Friday, March 31, 2023

Building(s) or Area(s) Affected:  Parking Lot 2 (South of CPFM Warehouse)

Scope:  Two new light poles with security cameras are scheduled to be installed in Parking Lot 2.

Services Impacted:

  • This will impact the availability of some parking spaces and modify the traffic flow during the construction.
  • Construction and Design is working with Parking to develop temporary parking solutions as needed.

Work Performed By:  Preferred Construction

ContactJanell Cottam, CPFM Owner’s Representative, 541-346-7536

Current construction and impacts information can be found on the UO Maps site.

3/03/23 Lewis Integrative Science Building Rooms 142, 145 -152 Electrical Shutdown

Begin:  Friday, March 3, 2023, at 7:00 am

End:      Friday, March 3, 2023, at 10:00 am

Building(s) or Area(s) Affected:  Lewis Integrative Science Building – Rooms affected per drawing: 142, 145, 146, 147, 148, 149, 150, 151, 152

Scope:  CPFM Facilities crew will replace a relay in the mezzanine.  Power will be shut off to CKT#10 in PNL BN2-4 (located in basement), which supplies lighting to multiple rooms – see attachment for details.

Services Impacted:  Power will be off during this time.

Work Performed By:  CPFM FS BAS Dept.

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

10/13/22 Zebrafish International Resource Center Electrical Outage

Begin:  Thursday, October 13th, 2022, at 7:00 am

End:      Thursday, October 13th, 2022, at 7:30 am

Building(s) or Area(s) Impacted:  Zebrafish International Resource Center

Scope:  Building power will be offline for 30 minutes to install an electric meter .

Services Impacted:  This will impact electrical power, exhaust, and the HVAC air supply.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  Fortis Construction

ContactColin Brennan, CPFM Owner’s Representative, 541-346-8242 or 541-654-2972

Unthank Hall Electrical Shutdown 3/23

Begin:  March 23rd, 2022 at 8:00 AM

End:      March 23rd, 2022 at 2:00 PM

Building(s) or Area(s) Impacted:  Unthank Hall

Scope:  We will have an electrical shutdown at Unthank Hall. The building will be on standby power during the shutdown. Stand-By will power walk-in coolers, walk-in freezers, walk-in beverage coolers, ADA doors, MDF/IDF rooms, FSD’s, fire alarm system, elevator system, and all lighting that is on egress. This shutdown is to test the ATS and install a metering cabinet in the main switchgear.

Services Impacted: All electricity will be down except walk-in coolers, walk-in freezers, walk-in beverage coolers, ADA doors, MDF/IDF rooms, FSD’s, fire alarm system, elevator system, and all lighting that is on egress.

Special Instructions: Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By: Oregon Electric Group

Contact: George Bleekman, CPFM Owner’s Representative, 541-346-2625

Klamath Hall Ground Floor Electrical Shutdown 3/12/22

Begin:  Saturday, March 12, 2022 at 7:00 am

End:  Saturday, March 12, 2022 at 3:00 pm

Building(s) or Area(s) Impacted:   Klamath Hall Ground Floor – see specific rooms affected below

 Scope:   Power will be shut down to electrical panel serving portions of the Ground floor while contractors connect additional circuits for room 019.

Services Impacted:  Electrical power will be shut down to rooms 018, 019, 019A, 019B, 019C, 019D, 021, 023, 024, 030, 032, 033, 065, 065A-065C, 053, 073A, 075, 075A and the corridor lights will be off in hallways H002, H004, H005, and H006.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By: Mortenson Construction, EC Electric

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

 

Esslinger Hall Electrical Shutdown 2/26/22

Begin:  Saturday, February 26th, 2022 at 7:00 am

End:      Saturday, February 26th, 2022 at 1:00 pm

Building(s) or Area(s) Impacted:  Esslinger Hall – First Floor and Possibly Basement Level

Scope:  Contractors will shut down power to Panels C1 and C2 to terminate 8 circuits and re-feed additional circuits for rooms 112 and 116.

Services Impacted:  Power will be offline on the first floor and possibly affect some circuits in the basement level.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  Mortenson Construction/ EC Power

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

Friendly Hall Elevator Lobby Lighting Work Advisory 11/16/21

Begin:  Tuesday, November 16th, 2021 at 7:30 am

End:      Tuesday, November 16th, 2021 at 9:30 am

Building(s) or Area(s) Impacted:  Friendly Hall

Scope:  Sunset Electric will install new lighting in front of the elevator on the 1st floor.

Services Impacted:  Construction works will be working in the first floor elevator lobby area.

Work Performed By:  Sunset Electric

ContactGene Mowery, CPFM Owner’s Representative, 541-346-5593

Ford Alumni Lighting Advisory – Effective Immediately 7/19/21 – approx. 7/23/21

UPDATE 7/23/21:
The lighting controls have been restored.

 

UPDATE 7/22/21:
The lighting controls repairs are being delayed one more day. Lutron Electronics Company will be here tomorrow to try to fix the programming.

 

Begin:  Effective immediately – Monday, July 19th, 2021

End:      Approximately Wednesday, July 21st, 2021 July 23rd, 2021

Building(s) or Area(s) Impacted:  Ford Alumni Center

Scope:  The light controller is malfunctioning and the switches do not work.  The lights that are currently on will remain on 24/7, and the lights that are currently out will remain out. We have a Lutron technician that will be on sight Wednesday, July 21st, to try to resolve the issues.

Services Impacted:  Lighting throughout the building

Work Performed By:  Contractor

ContactRob Berg, CPFM Facilities Electrical Supervisor, 541-346-2313

Pacific Hall Rooms 202, 203, and 204 Remodel Advisory 9/2/20 – 11/30/20

UPDATE: The scope of the work has been expanded and is projected to finish on 11/30.

Begin:  Wednesday, September 2nd, 2020

End:      Friday, October 23rd 30th, 2020 November 6th 30th, 2020

Building Impacted:  Pacific Hall 202, 203, 204

Scope:  Remodel of 3 suites to connect suites and refresh finishes, electrical, lighting, mechanical ventilation system and add new storefront entries.  Minor asbestos abatement is required.

Services Impacted:

  • Asbestos abatement will occur in suites 202 and 204 from 9/2 to 9/4.  It will not impact suite 203. Additional asbestos abatement will occur the week of 10/19.
  • Construction to begin 9/14.
  • No electrical or HVAC disruptions are known at this time.  A shut down notice will be issued as necessary.
  • Users can expect to hear construction noises like hammering and drilling, and see employees and UO staff entering and exiting the building during normal business hours.

Work performed by:  Chambers Construction and their subs.

Contact:  Theo Davis, CPFM Design & Construction Project Manager, 541-346-1012

Friendly Hall Selective Electrical Shutdown 8/13/20

Begin:  Thursday, August 13th, 2020 at 8:00 am

End:      Thursday, August 13th, 2020 at 4:00 pm

Building(s) or Area(s) Impacted:  Friendly Hall

Scope:  Electrical shutdown for relocation of feeder conduits passing through the new elevator shaft area.

Services Impacted:  Three separate areas:

  • EM electrical panel will impact all hallway and exterior lighting at all floors;
  • Electrical Panel K will impact all 4th floor offices;
  • Electrical Panel D will impact all of the 1st floor.

Extra Notes:

Special Instructions:  Please shut down all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when power is turned back on, a power surge can corrupt the clone files in the machines, and can change preconfigured settings.

Work Performed By:   Sunset Electric

ContactGene Mowery, CPFM Owner’s Representative, 541-346-5593

Klamath Third Floor Lighting Shutdown 7/29/20

Begin:  Wednesday, July 29, 2020 at 5:00 am

End:      Wednesday, July 29, 2020 at 7:00 am

Building(s) or Area(s) Impacted: Klamath Hall third floor

Scope: The power panel will be shutdown to full feeder conductors for phase 2 lighting on the third floor. All of the third floor’s lighting will be impacted.

Work Performed By: Lease Crutcher Lewis

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

LISB 153, 154, and 155 Lighting Shutdown 7/29

Begin:  Wednesday, July 29, 2020 at 7:00 am

End:      Wednesday, July 29, 2020 at 3:30 pm

Building(s) or Area(s) Impacted: Lewis Integrated Science Building rooms 153, 154, and 155

Scope: To complete the new MRI Emergency shut off connection and connect the new lights, lighting circuits will be momentarily switched. This will shutdown lights to LISB rooms 153, 154, and 155 for one hour.

Work Performed By: New Way Electric and GBC

Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880

1715 Franklin Electrical Shutdown 6/18/20

UPDATE:

Please note that both the data network and telephone services to the building may be out for the duration of the power outage.

 

Begin:  Thursday, June 18th, 2020 at 6:30 pm

End:      Friday, June 19th, 2020 at 12:01 am

Building(s) or Area(s) Impacted:  1715 Franklin Blvd

Scope:  EWEB will be shutting down power for approximately five and one-half hours.

Services Impacted:

  • Electricity will be off for the entire building.
  • Both the data network and telephone services to the building may be out for the duration of the power outage.

Special Instructions:  Please shut down all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when power is turned back on, a power surge can corrupt the clone files in the machines, and can change preconfigured settings.

Work Performed By:  EWEB

ContactMelinda Seeley, CPFM Campus Planning Real Estate Prop Specialist, 541-346-5550

Klamath Hall Electrical Panel (Tunnel Lighting, Mechanical Room Lighting, Fire Alarm) Shutdown 3/25/2020

Begin:  Wednesday, March 25th, 2020 at 5:00 am

End:      Wednesday, March 25th, 2020 at 10:00 am

Building or Area Impacted:  Klamath Hall

Scope:  Renovation contractor needs to revise power source to electrical panels.

Services Impacted:  Tunnel lighting, mechanical room lighting, and fire alarm.

Extra Notes:  Fire watch will be conducted during this time.

Work Performed By:  Lease Crutcher Lewis

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Klamath Hall Lamp Change-Out Week of August 19

Our electrical crew will be changing out lamps in Klamath Hall the week of August 19. Advance notice was sent to Facilities Liaisons on July 31 for scheduling access to the laser labs, or any lab, that may present a danger to us or to their equipment.

Here is a schedule of the labs that replied to the email.

8/19/19

  1. Klamath Hall Rm.   45
  2. Klamath Hall Rm. 109
  3. Klamath Hall Rm. 115

8/20/19

  1. Klamath Hall Rm. 118
  2. Klamath Hall Rm. 120
  3. Klamath Hall Rm. 124
  4. Klamath Hall Rm. 174

8/21/19

  1. Klamath Hall Rm. 121
  2. Klamath Hall Rm. 127
  3. Klamath Hall Rm.  60  (Work to begin at 11 a.m.)
  4. Klamath Hall Rm. 344 (Work to follow after completing Rm. 60)

8/22/19

  1. Klamath Hall Rm. B48
  2. Klamath Hall Rm. B84
  3. Klamath Hall Rm.  108
  4. Klamath Hall Rm.  132

 

We are assuming that the labs that didn’t respond have not access concerns, so we will enter these spaces when we are in the area to complete our work.

If you have any questions or concerns, please contact Ernie Dangerfield at 346-2805 or erniemd@uoregon.edu.

Willamette Hall Lamp Change Out Week of August 12th

Our electrical crew will be changing out lamps in Willamette Hall the week of August 12th. Advance notice was sent to Facilities Liaisons on July 31st for scheduling access to the laser labs, or any lab, that may present a danger to us, or to their equipment.

Here is a schedule of the labs that replied to the email.

8/13/19

  1. Willamette Hall Rm. 363
  2. Willamette Hall Rm. 171 and 171A

8/16/19

  1. Willamette Hall Rm. B32
  2. Willamette Hall Rm. 209
  3. Willamette Hall Rm. 210

We are assuming that the labs that didn’t respond do not have access concerns, so we will enter them to do our work, when we are in the area.

If you have any questions or concerns, please contact Ernie Dangerfield at 346-2805 or erniemd@uoregon.edu.

5/19/18: Oregon Hall Electrical and Network Shutdown

Building Occupants,

As part of the Oregon Hall Renovations on Saturday, May 19, 2018, from 6:00 am – 3:30 pm contractors will be shutting down the 800A breaker in the Basement MDA Panel Labeled West Power/Lights.  This will impact lights, receptacles, and mechanical equipment that services the west portion of the building and network equipment in Room 225.  The Building Network system will be down, except for areas served by East Wing data rooms.  West side lighting, receptacles, mechanical equipment and the network will all be shut down during this time.

This work is necessary to allow for re-circuiting lights, receptacles and power to network equipment.

For questions or concerns please contact CPFM Design and Construction Owners Rep Patrick Mucker at 541-346-8216.

 

12/19: [JANE SANDERS STADIUM] Outage: Electrical Outage Impacting Various Equipment & Systems

Building Occupants,

On December 19, 2017 from 7:30 am – 2:00 pm JKG Electric and Fortis Construction will be onsite at the Jane Sander Stadium impacting the below systems:

Date: Time: Impact:
12/19 7:30 am – 11:30 am MOP 001 Switchboard 1N1-4 Shutdown
• All building and field lighting
• All building equipment – HVAC, circulation pumps, elevator and water vault sump pumps, fire sprinkler compressor, propane pump, cameras etc.
• All building and field receptacles – including MDF racks, concessions, press box, offices, concourse, team lounge and lockers, etc.
• Elevator
• Fire alarm control panels
• Access control panel
• Primary source to emergency panel 2E1-4 (secondary source should be available through ATS)
• Broadcast truck panel

12/19 12:30 pm – 2:00 pm MOP 002 Lighting Panel 2E1-4 Shutdown
• Emergency lighting
• Fire Alarm Control Panel

For questions or concerns regarding this outage please contact CPFM Design and Construction Owners Rep Charlene Lindsay at 541-346-5503.

7/1/17: Cascade Hall Egress + Emergency Egress Lighting Shutdown

Building Occupants,

On Saturday, July 1st from 3:30 am to 6:00 am, emergency egress lighting will be off, and from 6:00 am to 11:30 am, all egress lighting will be off.

Work will be performed by Andersen Construction.

For questions or concerns about how this may impact your area, contact Denise Stewart, Campus Planning and Facilities Management (CPFM) Design and Construction at 346-2280.