4/23/24 – 4/26/24 McKenzie Hall Emergency AHU-5 and AHU-6 HVAC Shutdown

UPDATE 4/26/24 12:00 noon
The work has been completed and the units are working fully now.

 

Begin:  Tuesday, April 23, 2024 – effective immediately

End:      Friday, April 26, 2024 – by end of day

Building(s) or Area(s) Affected:  McKenzie Hall

Scope:  The drives have failed on the supply air of AHU-6 and the return air of AHU-5.  Parts are on hand and repair work has already begun.  Both units are expected to be brought online by the end of the day on Friday, 4/26/24.  An update will be sent if services are restored earlier than 5:00 pm.

Services Impacted:  This will affect the heating and cooling on the northside of the building on floors 2 through 4.  There is still air flow, but the heating and cooling will be limited.  Impacts should be minimal and intermittent.

Work Performed By:  CPFM Facilities Service

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of McKenzie Hall

3/11/24 – 3/14/24 Oregon Hall Chilled Water Shutdown

Begin:  Monday, March 11, 2024, at 12:00 noon

End:      Thursday, March 14, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Oregon Hall

Scope:  Due to the installation of a new chilled water meter, the building air conditioning will be shut down.

Services Impacted:

  • This will affect the Oregon Hall Main Building Only.
  • This shutdown will NOT affect the Oregon Hall Data Center!
  • This work is planned during winter weather and will have little to no impact on building users.
  • Work will take place in the utility tunnel.

Work Performed By:  S2 Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Oregon Hall

1/09/24 and 1/12/24 Huestis Hall and Lokey Labs Fume Hoods, Exhaust, HVAC Air Supply and Fire Alarm System Shutdown

1st Day:             Tuesday, January 9, 2024, from 7:00 am until 4:00 pm

2nd Day:           Friday, January 12, 2024, from 7:00 am until 4:00 pm

Building(s) or Area(s) Affected:  Huestis Hall and Lokey Labs

Scope:

  • Huestis Hall: On Tuesday 1/9 and again on Friday 1/12 from 7:00 am – 4:00 pm, air and exhaust systems will be offline in the basement as the temporary AHU and exhaust fans are removed and final connections to building AHU units and lab exhaust fans are reconnected. User access to Huestis rooms 6, 12 and 13 should be limited or avoided during this shutdown.
  • Lokey Labs and Huestis Hall:  On Tuesday, 1/9 from 7:00 am until 4:00 pm, the fire alarm system will be offline to Huestis and Lokey Labs during this shutdown. Contractor will provide fire watch.

Services Impacted:  This will affect exhaust, fire alarm systems, fume hoods, heating, cooling, and the HVAC air supply.  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  JH Kelly, FM Sheetmetal, IES

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall and Lokey Labs

10/16/23 – 10/17/23 Esslinger Hall Rooms 190, 190A, 190B, 199 Emergency Air Conditioning Shutdown

Begin:  Monday, October 16, 2023 – effective immediately

End:      Tuesday, October 17, 2023 – around 12:00 noon

Building(s) or Area(s) Affected:  Esslinger Hall Rooms 190, 190A, 190B, and 199

Scope:  An emergency shut down of the air conditioning has occurred in the rooms listed.  Repairs are being made and the system is expected to be back online around noon tomorrow.  An update will be sent when services have been restored.

Services Impacted:  Cooling will be offline.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Esslinger 190, 190A, 190B, 199

10/18/23 Lawrence Hall Electrical Shutdown

UPDATE:
To ensure a smooth transition back into the school day, the electrical shutdown has been rescheduled for Wednesday, October 18th.  The time will remain the same (5:00 am to 7:00 am).

 

Begin:  Wednesday, October 11 18, 2023, at 5:00 am

End:      Wednesday, October 11 18, 2023, at 7:00 am

Building(s) or Area(s) Affected:  Lawrence Hall

Scope:  New electrical panel in Lawrence 188 must be tied in to existing, main electrical panel in Lawrence Hall.  Work will be performed early in the morning.

Services Impacted:  This will shutdown the lighting, electrical outlets, elevators, BAS controls fire alarm panels and IT closets within the building.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.  For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu.  For non-copier questions, please reach out to the contact person listed below.

Additional Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  OEG

ContactDavid Mason, CPFM Owner’s Representative, 541-346-5679

Current construction and impacts information can be found on the UO Maps site.

Image of Lawrence Hall

 

7/25/23 Knight Library Air Conditioning Shutdown

Begin:  Tuesday, July 25, 2023, at 6:00 am

End:      Tuesday, July 25, 2023, at 12:00 noon

Building(s) or Area(s) Affected:  Knight Library

Scope:  The air conditioning for the library will be temporarily shut down the morning of July 25th to accommodate renovations occurring in the basement.

Services Impacted:  The air conditioning to the building will be offline except the Special Collections system and a few other areas of the library will remain functional.  The entire system is expected to be on again by midday.

Work Performed By:  Harvey & Price and CPFM Facilities Services

ContactJanell Cottam, CPFM Owner’s Representative, 541-346-7536, Bruce Budzik, CPFM Small Projects & Cap Imp Manager, 541-346-8834

Current construction and impacts information can be found on the UO Maps site.

Image of Knight Library

5/30/23 Onyx Bridge Cold Room 485 Emergency A/C Shutdown

Begin:  Tuesday, May 30, 2023 – effective immediately

End:      Unknown

Building(s) or Area(s) Affected:  Onyx Bridge Cold Room 485

Scope:  An emergency shutdown of the air conditioning for cold room 485 has taken place due to the system freezing up.  The air will be off for at least a day.  An update will be sent when the system has been restored.

Services Impacted:  The air conditioning will be offline in the cold room.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Onyx Bridge cold room 485

4/11/23 Clinical Services Chilled Water Shutdown

Begin:  Tuesday, April 11, 2023, at 7:00 am

End:      Tuesday, April 11, 2023, at 3:00 pm

Building(s) or Area(s) Affected:  Clinical Services

Scope:  Due to an incorrectly located temperature sensor during the chilled water meter work, building air conditioning will be shutdown to install the sensor in the correct location.

Services Impacted:  There should be minimal impact to building users due to cooler Spring weather.

Work Performed By:  CPFM Utilities & Energy

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Clinical Services

4/03/23 Huestis Basement Steam and Condensate Shutdown

Begin:  Monday, April 3, 2023, at 7:00 am

End:      Monday, April 3, 2023, at 3:30 pm

Building(s) or Area(s) Affected:  Huestis Hall

Scope:  As part of the Huestis Renovation project, the steam and condensate to the Zebrafish Facility in the basement of Huestis Hall will be offline. This will also require the shutdown of equipment LEF 1&2, AHU 1&2, Willamette Hall supply and exhaust fan to quarantine. Dish and rack washing will be affected and scheduled off during this period.

Services Impacted:  This will affect the heating systems, exhaust, HVAC air supply, and steam condensate.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

3/20/23 – 3/22/23 Clinical Services Building Chilled Water Shutdown

Begin:  Monday, March 20, 2023, at 7:30 am

End:      Wednesday, March 22, 2023, at 3:00 pm

Building(s) or Area(s) Affected:  Clinical Services Building

Scope:  Due to the installation of a new chilled water meter, building air conditioning will be shutdown.

Services Impacted:

  • There will be some noise and slight odor from pipe work in basement mechanical room 050.
  • According to the current weather forecast, this work should have little to no impact on building users.

Work Performed By:  S2 Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

2/15/23 – Unknown – Lillis HVAC AHU-1 Emergency Shutdown

Begin:  Wednesday, February 15, 2023 – effective immediately

End:      Unknown

Building(s) or Area(s) Affected:  Lillis

Rooms:

  • Suite 140- 140, 140A, 140B, 140C 140D, 140E, 140F
  • Suite 145- 145, 145A, 145B
  • Suite 155- 155, 155A, 155B
  • Room 169
  • Suite 240- 240, 240A, 240D, 240E
  • Suite 250- 250, 250A, 250B, 250C, 250D, 250e
  • Rooms 219, 263, 269

Scope:  The AHU-1 has been shut down to make emergency repairs.  Parts have been ordered and an update will be sent when the system has been restored.

Services Impacted:  The heat will be offline in the rooms listed above.

Work Performed By:  CPFM Facilities Crew

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

2/06/23 – 2/08/23 Lawrence Hall Chilled Water Shutdown

Begin:  Monday, February 6, 2023, at 7:00 am

End:      Wednesday, February 8, 2023, at 3:00 pm

Building(s) or Area(s) Affected:  Lawrence Hall East

Scope:  Due to the installation of a chilled water meter, the chilled water used for air conditioning will be shut down.

Services Impacted:   Because of winter weather, this outage will have little to no impact on building users.

Work Performed By:  S2 Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

10/13/22 Zebrafish International Resource Center Electrical Outage

Begin:  Thursday, October 13th, 2022, at 7:00 am

End:      Thursday, October 13th, 2022, at 7:30 am

Building(s) or Area(s) Impacted:  Zebrafish International Resource Center

Scope:  Building power will be offline for 30 minutes to install an electric meter .

Services Impacted:  This will impact electrical power, exhaust, and the HVAC air supply.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  Fortis Construction

ContactColin Brennan, CPFM Owner’s Representative, 541-346-8242 or 541-654-2972

10/04/22 Huestis Basement Zebrafish Facility AHU and Exhaust Fan Shutdown

Begin:  Tuesday, October 4th, 2022 at 4:00 am

End:      Tuesday, October 4th, 2022 at 7:00 am

Building and Area:  Huestis Basement Zebrafish Facility

Scope: AHU 1 and 2 and Exhaust Fans 1 and 2 serving the Huestis basement Zebrafish Facility will be shutdown to accommodate a temporary duct reroute.

Services Impacted:  This will affect the exhaust, fume hoods, and HVAC air supply in the Zebrafish Facility.

Special Instructions:  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Work Performed By:  JH Kelly and EC

Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

 

9/28/22 Ford Alumni Center Emergency AHU 1, AHU 2, and AHU 3 Shutdown

Begin:  Wednesday, September 28th, 2022 effective immediately

End:      Wednesday, September 28th, 2022 at 5:00 pm

Building and Area:  Ford Alumni Center

Scope: The disconnect for AHU-1, AHU 2, and AHU 3 needs to be replaced.

Services Impacted:  This shutdown will affect air supply and exhaust in Ford Alumni Center

Work Performed By:  Matt Paeschke, CPFM

Contact: Work Control Center, Campus Planning and Facilities Management, 346-2319

To view current construction and impacts. visit UO Map.

9/14/22 Lokey Labs Electrical Shutdown

Begin:  Wednesday, September 14th, 2022 at 6:00 am

End:      Wednesday, September 14th, 2022 at 7:00 am

Building and Area:  Lokey Labs

Scope: As part of the Huestis Renovation Project, there will be a brief shutdown of electrical panel 2N2 and 2N2A

Services Impacted:  This electrical outage will affect the chilled water, compressed air, power, exhaust, fume hoods, and HVAC air supply.

Special Instructions:  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Additional Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  Lease Crutcher Lewis and EC

Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

9/13/22 Willamette Hall and Huestis Steam/Condensate plus Supply/Exhaust Air Shutdown

Begin:  Tuesday, September 13th, 2022 at 7:30 am

End:      Tuesday, September 13th, 2022 at 11:30 am

Building(s) or Area(s) Affected:  Willamette Mechanical Room 50 and Huestis Basement

Scope:  As part of the Huestis Renovation project, steam and condensate plus supply and exhaust air will be shut down.

Services Impacted:  The following equipment will be affected and unavailable during this time: Willamette Hall AHU-2, Huestis Hall AHU-1&2, HX-1 and steam sterilizers.

Work Performed By:  Lease Crutcher Lewis and JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

9/06/22 – 9/08/22 McKenzie Hall Rooms 125, 129, and 229 HVAC Shutdown

Begin:  Tuesday, September 6th, 2022 at 7:00 am

End:      Thursday, September 8th, 2022 at 5:00 pm

Building(s) or Area(s) Affected:  McKenzie Hall

Scope:  Heating water and chilled piping to MZ-2 will be cut and rerouted to provide pathway for new ductwork routing as part of the ductwork repair project.

Services Impacted:  The air handling unit will continue to operate to provide ventilation but will not have heating or cooling in classrooms 125, 129, and 229.  This will not affect the rest of the building.

Work Performed By:  Harvey and Price

ContactKevin Waldrop, CPFM Facilities Engineer, 541-346-2315

To view current construction and impacts. visit UO Map.

 

9/01/22 – 9/08/22 510 Oak HVAC Work Advisory

Begin:  Thursday, September 1st, 2022

End:      Thursday, September 8th, 2022

Building(s) or Area(s) Affected:  510 Oak

Scope:  Technicians will be servicing the AC units in this building.

Services Impacted:

  • Systems will be up and running, except for short, individual shut downs (usually under 20 min a room/system.)  Not all rooms may be impacted.
  • Technicians will be in and out of office, storage and common spaces intermittently throughout the week.

Work Performed By:  CPFM Facilities Mechanical Crew

ContactPiper Fahrney, CPFM FS Mechanical Shop, 541-346-2319

To view current construction and impacts, visit UO Map.

8/19/22 – 8/24/22 Baker Downtown Center HVAC Shutdown

Begin:  Friday, August 19th, 2022

End:      Wednesday, August 24th, 2022

Building(s) or Area(s) Affected:  Baker Downtown Center

Scope:  Due to unforeseen conditions the HVAC unit is not working. Hopefully repairs will be complete tomorrow, but the building wide cooling may be down until Wednesday.

Services Impacted:  Building wide cooling will be offline until repairs can be made.

Work Performed By: FM Sheetmetal

Contact: Bruce Budzik, CPFM Small Projects & Cap Imp Manager, 541-346-8834

8/19/22 – Unknown Computing Center Cooling Shutdown

Begin:  Today, August 19th, 2022 at 9:00 am

End:      Unknown, possibly Monday, August 22nd, 2022

Building(s) or Area(s) Affected:  Computing Center

Scope:  A water intrusion was found on the 2nd floor and Air Handling Unit 5 was determined to be the source. AHU-5 has been shut down to stop the water intrusion and will be off until repairs can be made. This will impact the cooling in the building.

Services Impacted:  Users may notice a difference in building cooling throughout the day.

Work Performed By: CPFM FS Mechanical and Plumbing Shops

ContactKyle Harshbarger, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

6/17/22 Huestis Hall HVAC Shutdown

Begin:  Friday, June 17th, 2022 at 11:00 am

End:      Friday, June 17th, 2022 at 1:00 pm

Building(s) or Area(s) Affected:  Huestis Hall

Scope:  As part of the Huestis Renovation Project and isolating the active basement space from levels 1-3, supply fan 1A (SF-1A) will be shutdown tomorrow.

Services Impacted:  This affects heating and cooling air supply to Suite 34.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

6/16/22 Huestis Hall Basement HVAC Shutdown

Begin:  Thursday, June 16th, 2022 at 11:00 am

End:      Thursday, June 16th, 2022 at 2:00 pm

Building(s) or Area(s) Affected:  Huestis basement rooms 17, 20, 20B, 21, 21A, and 31

Scope:  As part of the Huestis Renovation Project, supply fan 2-B will be shutoff for 3 hours.

Services Impacted:  This work will affect heating and cooling air supply to the Huestis basement rooms.

Work Performed By:  Mortenson Construction

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

5/11/22 – 5/13/22 Klamath Hall Air Handler Units Shutdown

UPDATE:
90% of the coil repairs have been completed and all air handlers have been turned on.  One air handler will be shut down for a short, unknown period of time on Friday May 13th to complete the repairs.
Thank you for your continued patience.

 

Begin:  May 11th, 2022 at 8:00 am

End:      May 11th, 2022 at 12:00 pm  Friday, May 13th, 2022

Building(s) or Area(s) Involved:  Klamath Hall

Scope:  Klamath Hall air handler units will be shut down to repair continuously failing chilled water coils.

Services Impacted:  Building-wide cooling

Work Performed By:  S2 Industrial

ContactKyle Harshbarger, CPFM Mechanical and Plumbing Shop Manager, 541-346-2055

8/09/22 Baker Downtown Center Chilled Water Shutdown Notice

Begin:  Tuesday, August 9th, 2022 at 7:00 am

End:      Tuesday, August 9th, 2022 at 4:00 pm

Building(s) or Area(s) Affected:  Baker Downtown Center, Rooms 100 – 140

Scope:  The chilled water system that serves the air handling units for the south side of the building will be shut down

Services Impacted:   The affected areas will not have air conditioning during this time

Work Performed By:  FM Sheet Metal

Contact: Kyle Harshbarger, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406