1715 Franklin Painting Advisory 9/13/2021-9/17/2021

Begin:  Monday, September 13, 2021

End:      Friday, September 17, 2021

Building(s) or Area(s) Impacted:  1715 Franklin

Scope:  CPFM Facilities Services will be patching and painting the north wall, in the vicinity of Room 281 and Hall 282.

Services Impacted:

  • Building occupants may see painters and equipment.
  • Painters will use low VOC paint. Minor odors may be noticed.

Work Performed By:  CPFM Facilities Services Painters

ContactBrianna Liberty, Architectural Drafter, 541-346-7612

Clinical Services Building Delivery and Construction Noise Advisory 9/7/21 – 9/11/21

Begin:  Tuesday, September 7th, 2021 at 7:00 am

End:      Saturday, September 11th, 2021 at 4:00 pm

Building(s) or Area(s) Impacted:  Clinical Services Building Room 145

Scope:  A new sound booth will be delivered to room 145.

Services Impacted:

  • A portion of lot 19, on the north side of the building, will be blocked off for the delivery.
  • Building occupants will hear construction sounds emanating from room 145 while this is assembled.
  • No building utilities will be affected and workers will access building from north parking lot.

Work Performed By:  Swinerton Construction

ContactBruce Budzik, CPFM Small Projects & Cap Imp Manager, 541-346-8834

Lewis Integrative Science Building HVAC Shutdown 9/01/21 – 9/02/21

Begin:  Wednesday, September 1st, 2021 at 7:00 am

End:      Thursday, September 2nd, 2021 at 6:00 pm

Building(s) or Area(s) Impacted:  Lewis Integrative Science Building

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.  Apologies for the short notice.

Services Impacted:  This will impact the main building air and should not affect mini-splits and local temperature control units.

Note:  Fume hood sashes will need to be closed and containers within the fume hoods sealed prior to the shutdown.

Work Performed By:  ERS, Inc.

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

Willamette Hall HVAC Shutdown 8/31/21

Begin:  Tuesday, August 31st, 2021 at 7:00 am

End:      Tuesday, August 31st, 2021 at 6:00 pm

Building(s) or Area(s) Impacted:  Willamette Hall

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.  Apologies for the short notice.

Services Impacted:  This will impact the main building air and should not affect mini-splits and local temperature control units.

Note:  Fume hood sashes will need to be closed and containers within the fume hoods sealed.

Work Performed By:  ERS, Inc.

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

Klamath Hall HVAC Shutdown 9/07/21

REVISED DATE

This work has been rescheduled for next Tuesday, September 7th, 2021

 

BeginMonday, August 30th, Tuesday, September 7th, 2021 at 8:00 am

End:      Monday, August 30th, Tuesday, September 7th, 2021 at 7:00 pm

Building(s) or Area(s) Impacted:  Klamath Hall

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.   Apologies for the short notice

Services Impacted:  This will impact the main building air and should not affect mini-splits and local temperature control units.

Note:  Fume hood sashes will need to be closed and containers within the fume hoods sealed.

Work Performed By:  ERS, Inc.

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

EC Cares elevator is down for repairs 8/30/21

Begin: August 30, 2021

End: TBD

Building Impacted: EC Cares

ScopeThe elevator is nonresponsive. The Otis elevator technician has been dispatched and will be on-site making repairs.

Services Impacted: The elevator is shutdown at the moment.

Extra Notes: An update will be sent when services are restored.

Work Performed By: Otis

Contact: Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Fire Systems Testing/Maintenance Schedule for Week of August 30 – September 3, 2021

Begin:  Monday, August 30th, 2021

End:     Friday, September 3rd, 2021

Scope: Fire systems testing and maintenance will be performed.

Buildings and Schedules:

  • Tuesday – 8/31              6:00 am – 8:00 am     Fine Arts A, B, and C
  • Wednesday – 9/1          6:00 am – 8:00 am     Millrace 1, 2, and 3
  • Thursday – 9/2             6:00 am – 8:00 am     1900 Millrace

Details: Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions: If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By: UO Safety & Risk Services

Contacts:  Zach Earl, UO Fire Systems Program Manager, 541-521-0351 or 541-346-9295

13th Ave. & University St. – Sidewalk Core Drilling 8/30/21

Begin:  Monday, August 30th, 2021 at 12:00 noon

End:     Monday, August 30th, 2021 at 3:00 pm

Building(s) or Area(s) Impacted:  Sidewalk at 13th Avenue and University Street

Scope:  A valve box will be inset into the sidewalk, which will involve core drilling into the concrete.  The process should take approximately two to three hours.

Services Impacted:  Traffic will not be affected.

Work Performed By:  NW Natural Gas

ContactJames McGladrey, UO Transportation Services Field Operations Manager, 541-346-2676

Cascade Hall HVAC Shutdown 8/26/21

Begin:  Thursday, August 26th, 2021 at 7:00 am

End:      Thursday, August 26th, 2021, 2021 at 6:00 pm

Building(s) or Area(s) Impacted:  Cascade Hall

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.

Services Impacted:  This will impact the main building air but should not affect mini-splits and local temperature control units.

Note:  Fume hood sashes will need to be closed and containers within the fume hoods sealed prior to the shutdown.

Work Performed By:  ERS, Inc.

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

Huestis elevator is down for repairs 8/25/21

Begin: August 25, 2021

End: TBD

Building Impacted: Huestis Hall elevator

ScopeThe elevator is nonresponsive. The Otis elevator technician has been dispatched and will be on-site making repairs.

Services Impacted: The elevator is shutdown at the moment.

Extra Notes: An update will be sent when services are restored.

Work Performed By: Otis

Contact: Work Control Center, Campus Planning and Facilities Management, 541-346-2319

CPFM Lock and Key Shop Temporary Electrical Service Advisory 9/7/21

Begin:  Tuesday, September 7th, 2021 at 7:00 am

End:      Tuesday, September 7th, 2021 – unknown

Building(s) or Area(s) Impacted:  Lock and Key Shop

Scope:  Building power will be put on temporary service to support the adjacent ZIRC project.

Services Impacted:  Build power.

Work Performed By:  Fortis Construction

ContactColin Brennan, CPFM Owner’s Representative, 541-346-8242 or 541-654-2972

CPFM Warehouse Construction Work Advisory 8/23/21

Begin:  Monday, August 23, 2021 – currently

End:      Monday, August 23, 2021

Building(s) or Area(s) Impacted:  CPFM Warehouse

Scope:  Overhead plumbing work is currently being done in the breezeway, using a lift.

Services Impacted:  Access may be affected during the day.

ContactJeff Hanson, CPFM Construction Project Manager, 541-346-7991 (for Tim Allenbaugh)

Campus Electrical Outages for Arc Flash Study 8/30/21 – 9/08/21

SCHEDULE UPDATES 9/03/21:

  • Jordon Schnitzer Museum of Art – Tuesday, September 7th, CHANGED TO: 8:00 am – 10:00 am

 

SCHEDULE UPDATES 9/02/21:

  • Jordon Schnitzer Museum of Art – Tuesday, September 7th, CHANGED TO: 6:00 am – 8:00 am
  • Knight Library – Sept 8th 6:00 am – 10:00 am AND Sept 9th 6:00 am – 10:00 am;  CANCELLED

 

SCHEDULE UPDATE 8/31/21:

  • Many Nations Longhouse – Wednesday, September 1st, 11:00 am – 3:00 pm  CANCELLED
  • Clinical Services – CHANGED TO : Tuesday, Sept 7th 6:00 am – 7:30 am

SCHEDULE UPDATES 8/26/21:

  • Oregon Hall – Tuesday, August 31st, 11:00 am – 2:00 pm CANCELLED
  • Knight Library – CHANGED TO : Sept 8th 6:00 am – 10:00 am AND Sept 9th 6:00 am – 10:00 am

 

Scope:  As part of the University of Oregon’s electrical safety program, CPFM is performing an Electrical Arc Flash Study of the electrical distribution system within the building. As part of the National Electrical Code, NFPA 70E requires that an arc flash risk assessment be performed in order to identify arc flash hazards and estimate the likelihood of an injury occurring. To complete this study, data must be collected from electrical equipment that is not readily visible from the outside of the equipment. To comply with NFPA 70E and OSHA guidelines, the electrical equipment must be de-energized to complete this work. Please see the schedule below for dates and times.

Schedule:

  • McKenzie Hall – Monday, August 30th , 6:00 am – 11:00 am
  • Friendly Hall – Monday, August 30th , 11:00 am – 2:00 pm
  • Prince Lucien Campbell – Monday, August 30th, 6:00 am – 11:00 am
  • Hendricks Hall – Monday, August 30th, 11:00 am – 2:00 pm
  • Volcanology – Tuesday, August 31st, 6:00 am – 11:00 am
  • Oregon Hall – Tuesday, August 31st, 11:00 am – 2:00 pm CANCELLED
  • Onyx Bridge – Tuesday, August 31st, 6:00 am – 11:00 am
  • Frohnmayer Music – Tuesday, August 31st, 11:00 am – 2:00 pm
  • Cascade Hall – Wednesday, September 1st, 6:00 am – 10:00 am
  • Price Science Commons – Wednesday, September 1st, 6:00 am – 10:00 am
  • Many Nations Longhouse – Wednesday, September 1st, 11:00 am – 3:00 pm  CANCELLED
  • Willamette Hall – Wednesday, September 1st, 6:00 am – 2:00 pm
  • Deschutes Hall – Thursday, September 2nd, 6:00 am – 11:00 am
  • Clinical Services – Thursday, September 2nd, 11:00 am – 2:00 pm  CHANGED TO : Tuesday, Sept 7th 6:00 am – 7:30 am
  • McArthur Court – Thursday, September 2nd, 6:00 am – 11:00 am
  • Columbia Hall – Thursday, September 2nd, 11:00 am – 2:00 pm
  • Jordon Schnitzer Museum of Art – Tuesday, September 7th, 6:00 am – 11:00 am  UPDATED CHANGE: 8:00 am – 10:00 am
  • Knight Library – Sept 8th 6:00 am – 10:00 am AND Sept 9th 6:00 am – 10:00 am;  CANCELLED

Please note:

  • Each building will be shut down separately with no known impacts to other buildings, with the exception of Cascade Hall and Price Science Commons which are interconnected and will be shut down at the same time.
  • The outages in Oregon Hall and Frohnmayer Music would not be throughout the entire building but in select areas.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Contact:  For questions or concerns, please reach out to either Dale Stadler, CPFM D&C Project Electrical Engineer, 541-514-6277 or Rob Berg, CPFM Facilities Electrical Supervisor, 541-346-2313.

Updated OSHA Rule Regarding Indoor Mask Requirement Signage 8/17/21

Oregon OSHA has implemented a new rule, effective immediately, that requires indoor mask requirement signage to be posted on all entry doors to workplace buildings. Please check the doors of your building to see if there are signs reminding folks that masks are required indoors. If signs need to be posted, please use the attached PDF to print out signage and display on every exterior door of your building that is intended to be used for entry (ie: keyed or card swipe). Postings are not required on exterior doors that are egress-only.

Lindsey J. Salfran

Executive Assistant
to the CRO and Associate VP of Safety and Risk Services
Safety & Risk Services | University of Oregon
1260 University of Oregon | Eugene, OR 97403-1260
Direct: 541.346.8853 | Fax: 541.346.7008
http://safety.uoregon.edu

COVID mask indoors 8.5×11 081521

Campus Exterior Window Cleaning Schedule for the Week of 8/30/21 – 9/05/21

Begin:  Monday, August 30th, 2021

End:      Sunday, September 5th, 2021

Building(s) or Area(s) Impacted:

  • HEDCO 8/30
  • Lokey Ed 8/30
  • Clinical Services 8/31
  • Education Annex 8/31
  • Frohnmayer Music 8/31
  • Knight Library 8/31 & 9/01
  • Chiles 9/01
  • Peterson 9/01
  • Anstett 9/01 & 9/02
  • Allen Hall 9/02
  • Lillis 9/02 to 9/05

Scope:  The exterior windows will be cleaned over the course of a week, and a lift will be utilized as needed.  Please close windows the night prior to the scheduled date.

Services Impacted:  Please be aware of the lift staging area, which will move from building to building.

Work Performed By:  American Cleaning Solutions

ContactKevin Farthing, CPFM Assoc. Dir Facilities Services Env., 541-346-2857

Hayward Field Electrical Panel Shutdown 8/26/21

Begin:  August 26th, 2021 at 6:00 AM

End:      August 26th, 2021 at 12:00 PM

Building(s) or Area(s) Impacted:  Human Physiology Tenant Improvement (Bowerman Sports Science Center) at Hayward Field

Scope:  Electrical panel (NW-LPE) shutdown for metering controls work.

Services Impacted:  Power to locations listed in attached photo.

Work Performed By: EC Electric and Siemens

ContactGene Mowery, CPFM Owner’s Representative, 541-346-5593

SRC Closure and Odor Advisory for Esslinger 8/28/21 – 9/12/21

Begin:  Saturday, August 28th, 2021

End:      Sunday, September 12th, 2021

Building(s) or Area(s) Impacted:  SRC and Esslinger

Scope:  The Student Recreation Center will be closed August 28th-September 12th for annual maintenance. As part of facility maintenance, hardwood floors will be screened and sealed. An outside vendor (New Dimension Hardwood Floors) will be applying a new seal to select floors. This work will take place over four working days starting Tuesday, August 31st and concluding on Friday, September 3rd.

Services Impacted:  Although measures will be taken to reduce the impact, the floor sealant gives off an odor that may impact those with respiratory sensitivity. In previous years there have been reports of odor impacting occupants of Esslinger Hall. Although work will be completed on 9/3, there could still be off-gassing taking place for a couple of days.

  • Midtown Courts – SRC 138
  • Oldtown Courts – SRC 42 & 44
  • Studio 283 – SRC 283

Work Performed By:  SRC Staff, Facilities Services, New Dimension Hardwood Floors

ContactCody Weaver, PE & Rec Associate Director for Facilities, 541-346-8993

Knight Library Fire System Testing 8/20/21

Begin:  Friday, August 20th, 2021 at 6:00 am

End:      Friday, August 20th, 2021 at 6:30 am

Building(s) or Area(s) Impacted:  Knight Library

Scope:  A fire systems test/maintenance will be performed.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  UO Safety & Risk Services

ContactZach Earl, UO Fire Systems Program Manager, 541-521-0351 or 541-346-9295.

Millrace Parking Garage Main Water Line Shutdown 8/23/21

Begin:  Monday, August 23rd, 2021 at 9:00 am

End:      Monday, August 23rd, 2021 at 1:00 pm

Building(s) or Area(s) Impacted:  Millrace Parking Garage

Scope:  EWEB will be working on the main water line.

Services Impacted:  This will only affect the fire sprinkler system and irrigation.

Work Performed By:  EWEB

ContactWork Control Center, Campus Planning and Facilities Management, 346-2319

Columbia Hall HVAC Shutdown 8/20/21

Begin: August 20th, 2021 at 7:00 am

End: August 20th, 2021 at 6:00 pm

Building(s) or Area(s) Impacted: Columbia Hall

Scope: Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.

Services Impacted: HVAC units will be offline for the entire building.

Work Performed By: ERS, Inc.

Contact: Adam Jones, SRS Buildings Sciences Manager, 541-346-8397

Deschutes Hall HVAC Shutdown 8/20/21

Begin: August 20th, 2021 at 7:00 am

End: August 20th, 2021 at 6:00 pm

Building(s) or Area(s) Impacted: Deschutes Hall

Scope: Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.

Services Impacted: HVAC units will be offline for the entire building.

Work Performed By: ERS, Inc.

Contact: Adam Jones, SRS Buildings Sciences Manager, 541-346-8397

Volcanology HVAC Shutdown 8/19/21

Previous notice sent – actually 8/19

 

Begin:  August 19th, 2021 at 7:00 am

End:     August 19th, 2021 at 6:00 pm

Building(s) or Area(s) Impacted:  Volcanology

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.

Services Impacted:  HVAC units will be offline for the entire building.

Work Performed By:  ERS, Inc.

Contact:  Adam Jones, SRS Buildings Sciences Manager, 541-346-8397

Oregon Hall HVAC Shutdown 8/23/21 – 8/24/21

Begin:  Monday, August 23rd, 2021 at 8:00 am

End:      Tuesday, August 24th, 2021 at 7:00 pm

Building(s) or Area(s) Impacted:  Oregon Hall

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.

Services Impacted:  HVAC units will be offline.

Note:  The data center will not be impacted by this project.

Work Performed By:  ERS, Inc.

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

Onyx Bridge HVAC Shutdown 8/24/21 – 8/25/21

Begin:  Tuesday, August 24th, 2021 at 7:00 am

End:      Wednesday, August 25th, 2021, 2021 at 6:00 pm

Building(s) or Area(s) Impacted:  Onyx Bridge

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.

Services Impacted:  HVAC units will be offline.

  • 8-24-2021 – First floor through – Fourth Floor & EHS 90 Day Area
  • 8-25-2021 – EHS Office Areas

Note:  Fume hood sashes will need to be closed and containers within the fume hoods sealed prior to the shutdown.

Work Performed By:  ERS, Inc.

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

Pacific Hall and Price Science Commons HVAC Shutdown 8/25/21 – 8/26/21

Begin:  Wednesday, August 25th, 2021 at 7:00 am

End:      Thursday, August 26th, 2021, 2021 at 6:00 pm

Building(s) or Area(s) Impacted:  Pacific Hall and Price Science Commons

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.

Services Impacted:  HVAC units will be offline.

Note:  Fume hood sashes will need to be closed and containers within the fume hoods sealed prior to the shutdown.

Work Performed By:  ERS, Inc.

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397