Untreated Steam Emergency Shutdown 9/25/19
Posted on

On Wednesday, September 25th from 6:00 am to 7:00 pm, clean (untreated) steam will be shut down in order to repair a pipe weld.

During the shutdown, no steam will be available.

Impacted Buildings:

University Health, Counseling and Testing Center
Lewis Integrative Science Building
Streisinger Hall
Huestis Hall
Willamette Hall
Klamath Hall
Onyx Bridge
Cascade Annex
Pacific Hall
Columbia Hall
Volcanology
ZIRC

For questions or concerns, please contact:
Jeff Madsen, CPFM Design and Construction 541-346-2256
Darin Dehle, CPFM Design and Construction 541-346-2282

McKenzie Hall AHU 3 Shutdown 9/20/19
Posted on

Update 9/24/19: The Air Handling Unit has been repaired and is up and running.

 

Due to a power issue last night, on 9/19/19, Air Handling Unit 3 has been put out of service. The power issue tripped the smoke and fire dampers, which is now affecting the air distribution.

Air Handling Unit 3 services the South sections of floors 1 and 2, as well as the L200. These areas will be without heating and cooling over the weekend. Repairs will resume on Monday and an update will be provided then.

Contact: Ken Straw

For questions or concerns please contact CPFM Mechanical & Plumbing Shop Manager Ken Straw at 541-346-5406 or kstraw@uoregon.edu.

 

Klamath Hall Fume Hood Shutdown 9/27/19
Posted on

On Friday, September 27th, from 6:00 am to 12:00 noon, contractors will be accessing the north exhaust plenum on the Klamath roof to build a barrier.  This will allow them to safely work in the shaft and avoid multiple shutdowns.  To enter the plenum, the north exhaust fans have to be shut off for safety reasons.

The evening prior to the shutdown, Thursday September 26th, please close all fume hood sashes in the north half of the building, for all floors.

Work will be performed by Lease Crutcher Lewis.

For questions or concerns, please contact Denise Stewart at 541-335-1258 or dstewart@uoregon.edu.

 

 

New Project Intake Form Launches 9/23
Posted on

Facilities Liaisons,

Monday, September 23, the project request form will take you to a new project intake form that is integrated with the U of O Call Log. If you are already a call log user, you can toggle at the top of the screen between “Project Request” and “Service Request.”

The form will remain available via the Design and Construction website under “Initiate a Project.”

https://cpfm.uoregon.edu/design-construction

This new integration streamlines the project intake process into our Work Management system AiM. Many of the questions are similar to the previous project intake form. The interactive map now allows the requestor to select more than one location through multiple pin drops.

The requestor has the ability to notify the Liaison when the pin is dropped. Click on details next to Liaison count. The Liaison list provides the requestor the opportunity to inform the Liaison of the project request by selecting notify.

 