12/12/23 Huestis Hall Basement and Lokey Labs Fire Alarm System Testing Advisory

Begin:  Tuesday, December 12, 2023, at 6:00 am

End:      Tuesday, December 12, 2023, at 8:00 am

Building(s) or Area(s) Affected:  Huestis Hall basement and Lokey Labs

Scope:  Fire alarm system will be in test mode as contractors test the fire alarm system due to changes from the Huestis Hall project.

Services Impacted:  Strobes and audible alarms will annunciate throughout Lokey Labs during this test period. Contractor will provide fire watch throughout Lokey Labs and the Huestis Basement.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  IES

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall and Lokey Labs

11/29/23 – 11/30/23 Huestis Hall Basement and Lokey Labs Fire Suppression System Shutdown

1st Day:  Wednesday, November 29, 2023 – 7:00 am to 3:00 pm

2nd Day:   Thursday, November 30, 2023 – 7:00 am to 3:00 pm

Building(s) or Area(s) Affected:  Huestis Hall basement and Lokey Labs

Scope:  As part of the Huestis Deferred Maintenance Project, the fire suppression and alarm system will be shut down on two days to allow the contractor to complete final connections. This outage will affect Lokey Labs and Huestis basement. Contractor will provide fire watch during this event.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Harvey & Price, IES

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall and Lokey Labs

10/31/23 – 11/02/23 Huestis Hall Basement and Lokey Labs Fire Suppression System Shutdown

UPDATE:
The audible fire alarm testing will occur sporadically during this event. This will last for 1-2 hours per floor level 1, 2, 3, and penthouse inside Huestis Hall only.

 

Begin:  Tuesday, October 31, 2023, at 7:00 am

End:      Thursday, November 2, 2023, at 3:00 pm

Building(s) or Area(s) Affected:  Huestis Hall Basement and Lokey Labs

Scope:  As part of the Huestis Hall renovation project, the fire suppression system will be offline each day from 7:00 am to 3:00 pm to allow for final fire line connections to the Huestis Hall basement and Lokey Labs.  Contractors will be working in the Huestis Hall basement mechanical room and main hallway. Contractors will provide fire watch throughout Lokey Labs and the Huestis Hall basement during this shutdown.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Harvey & Price

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall and Lokey Labs

11/01/23 McArthur Court Fire Suppression System Shutdown

Begin:  Wednesday, November 1, 2023, at 6:00 am

End:      Wednesday, November 1, 2023, at 4:00 pm

Building(s) or Area(s) Affected:  McArthur Court

Scope:  Due to the need to add two additional fire sprinkler heads in McArthur Court, the fire suppression system to the north zone of the mezzanine will be shut down. The system will be up and running by the end of the day.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  GBC Construction/ Harvey & Price / IES

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

Current construction and impacts information can be found on the UO Maps site.

Image of McArthur Court

9/20/23 Prince Lucien Campbell Emergency Fire System Testing

Begin:  Wednesday, September 20, 2023, at 6:00 am

End:      Wednesday, September 20, 2023, at 7:30 am

Building(s) or Area(s) Affected:  Prince Lucien Campbell

Scope:  Safety & Risk Services will be performing an emergency test of the fire system.  Alarms will be heard and water will be released down the sides of the building.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  UO Safety & Risk Services

ContactMichael Brooks, UO SRS Fire Safety Officer, 541-346-5573

Current construction and impacts information can be found on the UO Maps site.

Image of Prince Lucien Campbell

9/15/23 & 9/20/23 Lillis Hall Room 369 Fire Alarm Test Advisory

UPDATE:

The fire alarm system in room 369 will be tested again, tomorrow morning, between 5:00 am and 6:00 am.

 

1st Test:  Friday, September 15, 2023, from 6:00 am to 6:30 am

2nd Test:  Wednesday, September 20, 2023, from 5:00 am to 6:00 am

Building(s) or Area(s) Affected:  Lillis Hall room 369

Scope:  A fire alarm test will take place tomorrow in room 369.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Integrated Electronic Systems

ContactJanell Cottam, CPFM Owner’s Representative, 541-346-7536

Current construction and impacts information can be found on the UO Maps site.

Image of Lillis Hall Room 369

9/12/23 Huestis Hall Fire Suppression and Fire Alarm System Shutdown

Begin:  Tuesday, September 12, 2023, at 6:00 am

End:      Tuesday, September 12, 2023, at 10:00 am

Building(s) or Area(s) Affected:  Huestis Hall Basement

Scope:  Related to the Huestis Hall Renovation project, the fire suppression and fire alarm system will be temporarily offline. The contractor will conduct fire watch during this outage.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations.

Work Performed By:  Harvey and Price, IES

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall

 

7/28/23 Huestis Hall Fire Suppression System Shutdown

Begin:  Friday, July 28, 2023, at 7:00 am

End:      Friday, July 28, 2023, at 10:00 am

Building(s) or Area(s) Affected:  Huestis Hall

Scope:  The fire suppression system will be down in Huestis Hall to allow for final connection of the north fire riser and the Fire Marshal’s inspections.  Contractor will provide fire watch in the occupied basement during this event.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Harvey and Price, IES

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall

9/12/23 Fenton Hall Fire Sprinkler System Work Advisory

UPDATE 8/31/23:
Prior to completion of our office space addition in room 314, our contractors need to perform some audible fire alarm testing. There will be a pre-test on September 6th between 6am and 8am, and a city fire alarm inspection on September 12th between 6am-8am. Both days may involve both audible alarms and lighted strobes during the specified times.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

 

DATE REVISED 8/04/23:
This work has been pushed out (again). Sprinkler work will resume August 22nd, and should be complete by the end of that day.

UPDATE 7/31/23:
This building has sectional valves, so only the 3rd floor should be affected.

UPDATE 7/18/23:
Due to a glitch encountered today, work has been rescheduled to Tuesday, August 1st.

UPDATE 7/17/23:
Due to scheduling of trades, this work has moved forward a day.
Sprinkler work will occur in Fenton 314 on Wednesday 7/19.

 

BeginJuly 20, July 19, August 1,  August 22, 2023, at 6:00 am

End:      July 20, July 19, August 1, August 22, Tuesday, September 12, 2023, at 8:00 am

Building(s) or Area(s) Affected:  Fenton Hall

Scope: Due to renovations on the top floor of Fenton Stacks, the fire sprinkler system will need to be shut down for alterations.

Services Impacted:  Work will take place in room 314 but the shutdown will affect the entire building.  This should only affect the 3rd floor.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  GBC Construction and Harvey & Price.

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

Current construction and impacts information can be found on the UO Maps site.

Image of Fenton Hall

7/03/23 Knight Library Fire Alarm Testing

Begin:  Monday, July 3, 2023, at 6:00 am

End:      Monday, July 3, 2023, at 2:00 pm

Building(s) or Area(s) Affected:  Knight Library

Scope:  Fire alarm testing will occur Monday, July 3rd, in the morning. ( I apologize for this late notice; I was just contacted by IES and they thought Monday the 3rd would be a good quiet day for testing.  I have reached out to Doug Hodson already and he has alerted staff.)

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Integrated Electronic Systems

ContactJanell Cottam, CPFM Owner’s Representative, 541-346-7536

Current construction and impacts information can be found on the UO Maps site.

Image of Knight Library

6/20/23 – 6/30/23 Knight Library Fire Alarm System Offline

Begin:  Tuesday, June 20, 2023

End:      Friday, June 30, 2023

Building(s) or Area(s) Affected:  Knight Library

Scope:  We will be installing a new fire alarm panel at the Knight Library as part of phase one to upgrade the system. This will involve some alarm testing once the new panel is installed, further notices will be shared when specific test times are identified. This work will occur primarily during the week between terms.

Services Impacted:  Work will take place in room 130A and near the front check-out desk.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Integrated Electronic Systems

ContactJanell Cottam, CPFM Owner’s Representative, 541-346-7536

Current construction and impacts information can be found on the UO Maps site.

Image of Knight Library

5/05/23 Huestis Hall Basement Fire Suppression System Emergency Shutdown

Begin:  Friday, May 5, 2023, at 7:00 am

End:      Friday, May 5, 2023, at 2:00 pm

Building(s) or Area(s) Affected:  Huestis Hall Basement

Scope:  Related to the Huestis Hall Renovation project, the fire suppression system will be offline. The contractor will conduct fire watch during this outage.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Harvey & Price

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall

 

1/24/23 Huestis Basement Fire Alarm System Shutdown Advisory

Begin:  Tuesday, January 24, 2023, at 6:00 am

End:      Tuesday, January 24, 2023, at 2:00 pm

Building(s) or Area(s) Affected:  Huestis Hall Basement

Scope:  As part of the Huestis Renovation project, the fire suppression system serving the basement will be shut down to temporarily move pipes to accommodate concrete work.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Harvey & Price

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

1/17/23 Prince Lucien Campbell 3rd Floor Fire Alarm System Work and Testing Advisory

REVISED DATE:
The date has been changed to the following day, Tuesday, January 17.

 

BeginMonday, January 16, 2023, at 7:00 am  Tuesday, January 17, 2023, at 7:00 am

End:      Monday, January 16, 2023, at 3:00 pm  Tuesday, January 17, 2023, at 3:00 pm

Building(s) or Area(s) Affected:  Prince Lucien Campbell 3rd floor

Scope:

  • In association with the remodeling work taking place in rooms 348 and 353, IES will put the fire panel in test mode for the third floor.
  • Harvey & Price will then install fire sprinkler piping in the ceiling space of room 348.
  • Once piping is installed and tested, IES will put the fire panel back on line.
  • GBC Construction will provide fire watch personnel for the third floor during this time.

Details: Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions: If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  EIS, Harvey & Price, GBC Construction

ContactGene Mowery, CPFM Owner’s Representative, 541-346-5593 or 541-799-4016

Current construction and impacts information can be found on the UO Maps site.

12/19/22 Frohnmayer Music Beall Hall Fire Alarm System Shutdown Advisory

Begin:  Monday, December 19th, 2022 at 7:00 am

End:      Monday, December 19th, 2022 at 2:00 pm

Building(s) or Area(s) Affected:  Frohnmayer Music Beall Hall

Scope:  The Beall Hall fire suppression system will be shut down temporarily to add additional sprinkler heads.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Harvey & Price and IES

ContactDavid Mason, CPFM Owner’s Representative, 541-346-5679 or 541-852-5659

Current construction and impacts information can be found on the UO Maps site.

12/19/22 Huestis Hall Basement Fire System Shutdown

Begin:  Monday, December 19th, 2022, at 6:00 am

End:      Monday, December 19th, 2022, at 10:00 am

Building(s) or Area(s) Affected:  Huestis H001 basement lobby and hallway around the elevator

Scope:  The fire suppression system will be shut down to remove heads out of the demo zone.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Harvey & Price

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

12/12/22 Huestis Hall Basement Fire Suppression System Shutdown

Begin:  Monday, December 12th, 2022 at 6:00 am

End:      Monday, December 12th, 2022 at 9:00 am

Building(s) or Area(s) Affected:  Huestis Hall Basement

Scope:  The fire suppression system will be offline to accommodate construction activities for the Huestis Hall renovation project.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Harvey & Price

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

12/12/22 – 1/06/23 Campus Fire Systems Testing/Maintenance Schedule for Winter

UPDATE:
Housing locations have been added to this schedule.

 

Begin: Monday, December 12th, 2022

End:     Friday, January 6th, 2023

Scope:  Fire systems testing and maintenance has been scheduled for the various campus buildings listed below.

Reminders will be sent to each building prior to testing.

Buildings and Schedules:

Week of 12/12 – 12/16

  • Tuesday, Dec. 13           6:00 am – 8:00 am       HDC (hoods only)
  • Tuesday, Dec. 13           8:00 am – 10:00 am     Unthank (plus hoods)
  • Tuesday, Dec. 13           10:00 am – 12:00 pm   Living Learning Center (plus hoods)
  • Tuesday, Dec. 13           12:00 pm – 2:00 pm     Barnhart (plus hoods)
  • Tuesday Dec. 13            1:00 pm – 3:0 pm          Riley
  • Wednesday, Dec. 14   6:00 am – 7:00 am         Ford Alumni Center
  • Wednesday, Dec. 14   7:00 am – 8:00 am         Jaqua Center (Kone)
  • Wednesday, Dec. 14    8:00 am – 10:00 am     Kalapuya Ilihi
  • Wednesday, Dec. 14    9:00 am – 12:00 pm      Global Scholars (plus hoods)
  • Wednesday, Dec. 14    12:30 pm – 2:00 pm      Carson (plus hoods)
  • Wednesday, Dec. 14    1:00 pm – 3:00 pm        Grad Village East and West
  • Thursday, Dec. 15        6:00 am – 8:00 am        Pacific Hall
  • Thursday, Dec. 15         8:00 am – 10:30 am      Earl
  • Thursday, Dec. 15         10:30 am – 12:30 pm    Bean
  • Thursday, Dec. 15         1:00 pm – 3:00 pm        Hamilton (plus hoods)
  • Friday, Dec. 16               7:00 am – 8:00 am       Spencer View (hoods only)
  • Friday, Dec. 16             8:00 am – 9:00 am         Moss St. (hoods only)
  • Friday, Dec. 16             9:00 am – 12:00 pm       EMU (hoods only)
  • Friday, Dec. 16               12:00 pm – 2:00 pm     Central Kitchen (hoods only)
  • Friday, Dec. 16               2:00 pm – 3:00 pm       Many Nations Long House (hoods only)

Week of 12/19 – 12/23

  • Wednesday, Dec. 21    6:00 am – 8:00 am     Knight Library – Elevators
  • Thursday, Dec. 22       6:00 am – 8:00 am     Knight Library – Alarms and Sprinklers (w/N2 Generator)

Week of 12/26 – 12/30

  • Tuesday, Dec. 27         6:00 am – complete   Klamath / Willamette / Cascade / Price Science Commons / Onyx & EHS office
  • Wednesday, Dec. 28   6:00 am – 8:00 am     Streisinger / Lokey Labs / LISB
  • Wednesday, Dec. 28   8:00 am – 9:00 am     Black Cultural Center
  • Thursday, Dec. 29       6:00 am – 7:00 am      Transportation
  • Thursday, Dec. 29       7:00 am – 8:00 am      EC Cares West 12th
  • Thursday, Dec. 29       8:00 am – 9:00 am     EC Cares Westmoreland and Whitaker

Week of 01/02 – 01/06

  • Tuesday, Jan. 3            6:00 am – 8:00 am     Lillis
  • Wednesday, Jan. 4      6:00 am – 8:00 am     Knight Law
  • Thursday, Jan. 5          6:00 am – 8:00 am     JSMA (w/N2 Generator)
  • Friday, Jan. 6               6:00 am – 8:00 am     Millrace Garage

(Winter Term Begins 1/09/23)

Details: Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions: If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By: UO Safety & Risk Services

Contact: Zach Earl, UO Fire Systems Program Manager, 541-521-0351 or 541-346-9295.

Plus three EC Cares locations

9/27/22 Baker Downtown Center Fire Systems Testing – Rescheduled

UPDATE:
The fire system testing has been rescheduled for September 27th  at the same time.

 

Begin:  Friday, September 23rd, 2022 Tuesday, September 27th, 2022 at 6:00 am

End:      Friday, September 23rd, 2022 Tuesday, September 27th, 2022 at 8:00 am

Building and Area Affected:  Baker Downtown Center – Suite 100 and adjoining areas

Scope:  As a part of the Baker Center 100 remodel project, fire systems testing will be performed.

Details: Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions: If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Sunset Electric

Contact: David Mason, CPFM Owner’s Representative, 541-346-5679

To view current construction and impacts. visit UO Map.

9/16/22 Huestis Fire Suppression System Work Advisory

Begin:  September 16th, 2022 at 7:00 am

End:      September 16th, 2022 at 3:30 pm

Building and Area:  Huestis room 034 and 001A for access, but shutdown will affect all spaces

Scope: As part of the Huestis Renovation project, the fire suppression system will be shut down in the Huestis Basement. Active fire watch will be conducted by Lease Crutcher Lewis.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By: Lease Crutcher Lewis and Harvey & Price

Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880

9/14/22 Planned Power Outage

UPDATE:
Utilities & Energy has switched from island mode back to the normal power configuration as planned.
Please report any issues caused by the outage, including IT, to the CPFM Work Control Center at 541-346-2319,  workcontrolcenter@uoregon.edu, or by entering a service request on the UO call log https://cgis.uoregon.edu/Calllog.
Thank you.

 

 

We are writing to remind you of the upcoming annual planned power outage on Wednesday, September 14th, 2022.

In the event our campus service from the local EWEB electrical grid is interrupted, the UO Utility and Energy plant is capable of providing the campus with electricity (called Island Mode). To best ensure this system operates as designed when needed, the Utility and Energy plant now exercises this system annually. This year’s Island Mode event will take place on Wednesday, September 14, 2022, at 7:35 am. 

At 7:35 am, the entire campus will shift from the primary EWEB power source to the backup generator system at the Central Power Station, also known as “Island Mode”.

While not anticipated, some buildings may briefly lose power when the switch occurs, if a portion of the system does not perform as expected.

At 7:45 am, Feeder 1 will be de-energized.  Affected buildings will experience a  power outage lasting approximately 1 hour.  During this time Utilities and Energy staff will be disconnecting power in a vault for a switch replacement project and exchanging the feeder breaker. Crews will then ensure systems are successfully coming back online.

At 9:00 am, Feeder 10 will be de-energized.  Affected buildings will experience a power outage lasting 15 minutes. During this time Utilities and Energy staff will be exchanging the feeder breaker.  Crews will then ensure systems are successfully coming back online.

At 10:00 am, Standby feeder 2 will be de-energized. This will have no affect to the campus buildings.

At 12:00 noon, Utilities and Energy will Initiate normal power configuration.

For a detailed schedule of feeders and maps of buildings affected, visit the 2022 Power Outage webpage. Updates about the project will be posted on that page and Around the O.

Individuals who wish to request planning assistance for the outages should contact Campus Planning and Facilities Management Work Control at workcontrolcenter@uoregon.edu or 541-346-2319.

Please remember to shut down all multi-function copier devices as well as any printers. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

To view current construction and impacts. visit UO Map.

8/03/22 Huestis Hall Fire Suppression System Shutdown

Begin:  Wednesday, August 3, 2022 at 7:00 am

End:      Wednesday, August 3, 2022 at 12:00 noon

Building(s) or Area(s) Affected:  Huestis Hall

Scope:  The fire suppression system will be shut down to complete the isolation of the renovation zone from the active basement zone. Fire watch will be in place.

DetailsHorns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special InstructionsIf there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Lease Crutcher Lewis, Harvey & Price

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

8/01/22 PLC Fire Alarm Noise Advisory

Begin:  Monday, August 1st, 2022 at 6:00 AM

End:    Monday, August 1st, 2022 at 8:00 AM

Building(s) or Area(s) Impacted:  PLC

Scope:  A contractor will be performing work on the fire system Monday morning. This may cause fire alarms to sound.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  UO Safety & Risk Services and a contractor

Contact: Zach Earl, UO Fire Systems Program Manager, 541-521-0351 or 541-346-9295.

7/15/22 ZIRC Fire Alarm Testing Advisory

Begin: Friday, July 15, 2022, at 8:00 am

End:      Friday, July 15, 2022, at 9:00 am

Building: ZIRC

Scope: project fire alarm test with City of Eugene. Demonstration will include testing of horns and strobes for a short duration.

Services Impacted:  Fire alarm testing

Work Performed By: Fortis / IES

Contact: Colin Brennan, CPFM Owner’s Representative, 541-346-8242 or 541-654-2972

To view current construction and impacts. visit UO Map.

 

6/28/22 Lokey Education Fire Sprinkler Install

Begin:  June 28th, 2022 at 7:00 am

End:      June 28th, 2022 at 4:00 pm

Building Affected:  Lokey Education

Scope:  Due to installation of new fire sprinkler heads for the Lokey Education elevator modernization project the associated fire sprinkler system will be temporarily shut down between the hours of 7:00 am and 4:00 pm.

Services Impacted:  The fire alarm and sprinkler system will be shut down during this time.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. The contractor will monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions: If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By: Ryan Thomas Construction