EMU North Elevator Out of Service 10/1/21 – 10/4/21
Posted on

UPDATE:

The elevator has been repaired and is operational.

 

Begin:  Effective Immediately – Friday, October 1st, 2021

End:      Expected repair – Monday, October 4th, 2021

Building(s) or Area(s) Impacted:  Erb Memorial Union

Scope:  We have received notice that the north elevator, near the card office, is not operational at this time.  A part has been ordered and is expected to arrive quickly and be installed sometime on Monday.  We will send out a notification when it has been repaired.

Services Impacted:  Elevator is offline.  Please use the other elevators in the building.

Work Performed By:  Otis Technician

ContactWork Control Center, Campus Planning and Facilities Management, 346-2319

Military Science Repelling Practice Advisory (Between McArthur Court and Tennis Center) 10/8/21
Posted on

Begin:  Friday, October 8th, 2021

End:      Friday, October 8th, 2021

Scope:  Military Sciences will be using the stairs, on the west side of the Tennis Center, to practice repelling.

Services Impacted:

  • No disruptions to traffic or access are expected.
  • ROTC cadets will be in the area marked below.

ContactJim Cody, CPFM Assoc. Dir of Facilities Services, 541-346-2302.

Oregon Hall 1st Floor Restrooms Shutdown 10/1/21-10/4/21
Posted on

UPDATE: A contractor is removing carpet and baseboard from H190, building a containment, and drying the wall finishes in the area. The first floor restrooms will be closed until approximately 10:00 AM on Monday October 4, 2021. Diagram is attached.

Begin:  Immediately

End:      10/1/21 at 12:00 pm 10/4/21 at 10:00 am

Building(s) or Area(s) Impacted:  Oregon Hall L150, H151, H190, 190, 191, and 192

Scope:  Waste water from the restrooms backed up from the drains and intruded into hallways 151 and 190 and lobby 150.

Services Impacted: The area, including the restrooms, will be closed until approximately 12:00 pm. Roto Rooter will be on-site snaking the drain lines.

Extra Notes: We will send an update when the restrooms are operational again.

Work Performed By:  CPFM Facilities Services Plumbing and Roto Rooter

Contact: Work Control Center, Campus Planning and Facilities Management, 346-2319

Oregon Hall Waste Water Intrusion[embeddoc url=”https://blogs.uoregon.edu/cpfmnotifications/files/2021/10/Oregon-Hall-Waste-Water-Intrusion.pdf” download=”all” viewer=”google”]