5/20/17: Sidewalk closures affecting several buildings for tree trimming

Building Occupants,

On Saturday, May 20th from 8:00am until 4:00pm access to the south entrance to Lawrence Hall will be closed for tree trimming by Sperry Tree Care. The walkway between Lawrence and Allen will be closed. Loud noise will be intermittent as work is carried out affecting primarily Allen Hall, Lawrence Hall, and Pacific Hall.

The Lawrence Hall alley and the walkways connecting to it will be closed or restricted as will access to the south entrance to Lawrence Hall.

For questions or concerns please contact Kevin Farthing  Zone D Maintenance Manager at 541-346-2857.

5/5/17-6/7/17: Klamath Lab Prep Tie-ins for Waterline Replacement

Building Occupants,

Thank you all for your continued patience and support for this project.

Reminder –

This week Andersen Construction has been working on tying in water in individual labs per the previously sent schedule for the Ground floor.  Below is the schedule which was sent out 04/19/2017 and includes both Ground floor and the next few weeks tie-ins which are on the 1st floor.  Also shown below is the schedule for the following weeks after that, when we will work on the 2nd floor.  The maps have our proposed dates and we just need you to contact Joe Hubbard if you need them to move slightly.

***Please make sure you remove items from your wall/ shelves and relocate equipment from the work area indicated on the plan, prior to the start date shown.

After construction work is complete, make sure you run water through your plumbing fixtures (sinks, drinking fountains, etc.) until the water runs clear (usually less than a minute).

If you have concerns or questions related to construction, please contact Joe Hubbard with Anderson Construction 541-514-5794.  For all other questions or concerns about how this may impact your area, contact Jana Gerow, Campus Planning and Facilities Management (CPFM) Design and Construction at 346-8317.

May-Summer 2017: PLC Painting & Radiator Work in Basement to 3rd Floor

Building Occupants,

Starting at the end of May, maintenance staff will be painting all hallways and performing work on hallway radiators in PLC.  They will begin on the ground/basement level and hope to reach the 3rd floor by the end of summer.

You can expect to see painting tarps, ladders, work carts, paint cans, paint trays, etc.  Please be mindful of the work spaces as you pass by them.  Areas containing wet paint will be posted.  You can also expect mild noise as the crews remove and replace radiator covers and possibly drill out stubborn screws.

For questions or concerns about how this may impact your area, contact Jim Cody, Campus Planning and Facilities Management (CPFM) Zone A Maintenance Manager at 346-2302.

5/17/17: Upcoming Fire System Testing at Bowerman/Hayward Field

Building Occupants,

Fire system testing is scheduled for Wednesday, May 17th from 6:00 am until 8:00 am.

Horns, Strobes and Speakers on the fire alarm system will not sound after the scheduled time, but there may be activity such as door holders closing and smoke detector testing that will occur throughout the morning. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

If there are questions regarding emergency evacuation please visit Emergency Management & Continuity, http://emc.uoregon.edu/node/50 and follow the UO Campus Emergency Procedures Manual.

You may also call Safety and Risk Services at 541-346-2958 if you have any questions or concerns.

 

5/9/17: Upcoming Fire System Testing at Straub Hall

Building Occupants,

Fire system testing is scheduled for Tuesday May 9th from 6:00 am until 8:00 am.

Horns, Strobes and Speakers on the fire alarm system will not sound after the scheduled time, but there may be activity such as door holders closing and smoke detector testing that will occur throughout the morning. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

If there are questions regarding emergency evacuation please visit Emergency Management & Continuity, http://emc.uoregon.edu/node/50 and follow the UO Campus Emergency Procedures Manual.

You may also call Safety and Risk Services at 541-346-2958 if you have any questions or concerns.

 

5/3/17: Upcoming Fire System Testing Baker Downtown Center

Building Occupants,

Fire system testing is scheduled for Wednesday, May 3rd, from 6:00 am until 8:00 am.

Horns, Strobes and Speakers on the fire alarm system will not sound after the scheduled time, but there may be activity such as door holders closing and smoke detector testing that will occur throughout the morning. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

If there are questions regarding emergency evacuation please visit Emergency Management & Continuity, http://emc.uoregon.edu/node/50 and follow the UO Campus Emergency Procedures Manual.

You may also call Safety and Risk Services at 541-346-2958 if you have any questions or concerns.

5/10/17: Preventative Maintenance Supply Air Shutdown for Cascade Hall and Cascade Annex

Building Occupants,

On Wednesday, May 10th, from 8:00 am to 3:30 pm, annual maintenance of building mechanical equipment will take place in Cascade Hall and Cascade Annex.  Systems affected will be the exhaust and fume hoods.

–          Between the hours of 8:00 am to 12:00 pm, building supply air will be affected.  Please keep lab doors open during this time.

–          Between the hours of 1:00 pm to 3:30 pm, fume hood and general exhaust will be affected.  Please keep fume hood sashes closed.

Work will be performed by CPFM’s Facilities Services.

For questions or concerns about how this may impact your area, contact Bruce Budzik, Campus Planning and Facilities Management (CPFM) Zone B Maintenance Manager at 346-8834.

4/29/17: Klamath Supply Air Shutdown

Building Occupants,

On Saturday, April 29th from 6:00 am until 9:00 am, supply air and temperature control will be offline. Once the fan and controls are back on, temperatures will stabilize.

The only portions of Klamath Hall that will be affected are the north halves of the ground floor, 1st, 2nd and 3rd.

Work will be performed by GBC Construction.

For questions or concerns about how this may impact your area, contact Denise Stewart, Campus Planning and Facilities Management (CPFM) Design and Construction at 346-2280.

4/20/17-5/2/17: Klamath Abatement Shutdown

Building Occupants,

Beginning Thursday night, April 20th at 7:00 p.m. until 6:00 a.m. and again on Friday evening, April 21st, at 7:00 p.m. until 6:00 a.m., contractors will be working on the ground floor, 1st, 2nd and 3rd floors doing Abatement as shown on red in the attached maps.

Starting April 24th, during their 4:00 a.m. to 7:30 a.m. work time, Anderson Construction will begin to open up wall sections as shown in Green on the 2nd floor only. These areas marked in green will then be abated from 7p.m. to 6a.m. starting Thursday, April 27th, and continuing during these hours until complete, approximately 3 days.

The areas affected are the Klamath hallways, some labs and janitor spaces where exposed water pipe fittings are.

For questions or concerns about how this may impact your area, contact Jana Gerow, Campus Planning and Facilities Management (CPFM) Design and Construction at 346-8317.

5/3/17: Streisinger Air Supply Shutdown

Building Occupants,

On Wednesday, May 3rd, from 8:00 am to 3:30 pm, there will be intermittent air supply disruptions throughout the day.  Between the hours of 8:00 am to 11:00 am, please keep lab doors open. Between the hours of 11:00 am to 3:30 pm, please keep fume hood sashes closed.  Systems affected will be the cooling, exhaust, fume hoods, and HVAC air supply.

Work will be performed by CPFM’s Facilities Services.

For questions or concerns about how this may impact your area, contact Bruce Budzik, Campus Planning and Facilities Management (CPFM) Zone B Maintenance Manager at 346-8834.

4/22/17: Klamath Domestic Hot & Cold Water, Natural Gas, Nitrogen, RO/DI Water, Vacuum Shutdown

Building Occupants,

On Saturday, April 22nd, between 7:00 am and 5:00 pm, the below services will be interrupted due to continued work on the 2nd floor renovation in Klamath Hall.

  • From 7:00 am to 11:00 am, emergency showers, emergency eye washes, drinking fountains, restroom sinks and kitchen sinks will not have water.  All levels of Klamath Hall will be affected.  No hot or cold domestic water will be available during this time.
  • From 11:00 am to 1:00 pm, natural gas will not be available.  All Bunsen burner gas valves should remain closed.  All levels of Klamath Hall will be affected.
  • From 1:00 pm to 3:00 pm, nitrogen will be offline.  All levels of Klamath Hall will be affected.
  • From 3:00 pm to 5:00 pm, the RO/DI water will be offline.  Only the 2nd floor of Klamath Hall will be affected.
  • From 3:00 pm to 5:00 pm, the vacuum will be offline.  Only rooms 292, 292B, 295, 296, and 297 of Klamath Hall will be affected.

This work was scheduled on a Saturday to limit the impact to building occupants.

For questions or concerns about how this may impact your area, contact Denise Stewart, Campus Planning and Facilities Management (CPFM) Design and Construction at 346-2280.

4/26/17: HVAC Preventative Maintenance for Knight Library

Building Occupants:

On Wednesday, April 26, from 8:00 am – 3:30 pm, preventative maintenance is scheduled on the Knight Library heating, ventilation and air conditioning (HVAC) equipment.  Building occupants should expect intermittent shutdowns on air handling units and restroom exhaust fans to allow crews to change system filters.

Work will be performed by Campus Planning and Facilities Management (CPFM) Preventative Maintenance Crew.

For questions or concerns about how this may impact your area, contact Jim Cody, Campus Planning and Facilities Management (CPFM) Zone A Maintenance Manager at 346-2302.

4/12/17: Shutdown of PLC heating systems for emergency repairs

Building Occupants,

The damaged pump which is causing a lack of heat in Prince Lucien Campbell Hall (PLC) will be repaired tomorrow, April 12th. This will require all heat in PLC to be shutoff in order to safely repair the damaged pump. Once the pump is repaired, the entire system will need to be refilled with water. The actual repair is expected to take up to four (4) hours, assuming all elements fall into place. Refilling the system will take an unknown amount of time.

Zone maintenance personnel are installing an additional fill point to expedite the process, but due to the age, size and volume of the system, we cannot calculate the exact time heat will be restored. When the system is restored, you may hear noises as trapped air works its way out of the system. If you see any water leaking, please notify customer service immediately at 346-2319.

For additional questions on how this may impact your services, please contact Jim Cody at 541-346-2302.

5/9/17 (revised date): McKenzie Hall Chilled Water Shutdown

UPDATE:  The shutdown originally scheduled for April 24th and 25th did not take place, but has been rescheduled for Tuesday, May 9th from 8:00 am to 5:00 pm.

Building Contacts,

On May 9th at 8:00 am until 5:00 pm, there will be a shutdown for the chilled water service to McKenzie Hall for the purpose of installing a water meter device in the main inlet to the building.  Air conditioning for the building will be affected.

Work will be performed by GBC Contractors and Twin River Plumbing.

For questions or concerns about how this may affect your services, contact Gene Mowery, Campus Planning and Facilities Management (CPFM) Design and Construction at 346-5593.

4/24/17 – 4/26/17: Autoclave Untreated Steam Shutdown for Huestis, Klamath, Onyx, and Zebra Fish

Building Occupants:

On April 24th at 7:00 am until April 26th at 4:00 pm, the autoclave untreated steam will be shut down for annual service maintenance and overhaul.

There will be access to treated 60# steam if you send a request to Mo Soleimani by e-mail.

Work will be performed by CPS Maintenance, a Mueller technician, and a S2 Industrial contractor.

For questions or concerns, please contact Mo Soleimani at 346-2213.

 

4/19/17: Planned heating water shutdown for Willamette Hall

Building Occupants,

Due to scheduled repairs on Willamette Hall (East side, 1st floor, rooms #139-#178), occupants should expect intermittent shutdowns (heating water) to install valves. The affected areas will be cooler than during a normal shutdown .  Scheduled work will take place on Wednesday, April 19, 2017, from 7:00 am – 9:00 am.

For additional questions on how this may impact your services, please contact Glen MacDonald at 541-346-2281.

 

 

4/12/17: Planned HVAC Shutdown for preventative maintenance work (ZIRC/ZIRC Annex)

Building Occupants,

Due to scheduled preventative maintenance on ZIRC 101 and ZIRC Annex, occupants should expect intermittent shutdowns (heating and cooling) on air handling units and restroom exhaust fans to allow crews to change system filters.  Scheduled work will be taking place on Wednesday, April 12, 2017, from 8:00 am – 3:30 pm.

For additional questions on how this may impact your services, please contact Bruce Budzik at 541-346-8834.

 

4/5/17 – 4/11/17: Klamath Hall (night work) Asbestos Abatement

Building Occupants,

PMG (contractor) will be conducting asbestos abatement work above the ceiling spaces in the women’s restrooms from the basement through 3rd floor levels of Klamath Hall. The work will begin tonight (April 5th) at 5:00PM and is estimated to be completed by early next week at the latest. All work will be conducted at night between 5:00PM and 6:00AM.

For questions or concerns about this project, contact Nate Ferguson Safety & Risk Services at 346-2901.