4/29/17: Klamath Supply Air Shutdown

Building Occupants,

On Saturday, April 29th from 6:00 am until 9:00 am, supply air and temperature control will be offline. Once the fan and controls are back on, temperatures will stabilize.

The only portions of Klamath Hall that will be affected are the north halves of the ground floor, 1st, 2nd and 3rd.

Work will be performed by GBC Construction.

For questions or concerns about how this may impact your area, contact Denise Stewart, Campus Planning and Facilities Management (CPFM) Design and Construction at 346-2280.