Esslinger Hall Electrical Shutdown 2/26/22
Posted on

Begin:  Saturday, February 26th, 2022 at 7:00 am

End:      Saturday, February 26th, 2022 at 1:00 pm

Building(s) or Area(s) Impacted:  Esslinger Hall – First Floor and Possibly Basement Level

Scope:  Contractors will shut down power to Panels C1 and C2 to terminate 8 circuits and re-feed additional circuits for rooms 112 and 116.

Services Impacted:  Power will be offline on the first floor and possibly affect some circuits in the basement level.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  Mortenson Construction/ EC Power

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

Frohnmayer Music Trench Work and Noise Advisory 2/15/22
Posted on

Begin:  Tuesday, February 15th, 2022

End:      Tuesday, February 15th, 2022

 Building(s) or Area(s) Impacted:  Frohnmayer Music and Parking Lot 20

Scope:  To facilitate wall sealing, a trench will be dug beside the east wall of the Frohnmayer Music building, outside rooms 150 and 178.

Services Impacted:

  • Some equipment noise can be expected around the area of rooms 035, 150, and 178.
  • Half-lane restriction on access road to Parking Lot 20 and the Frohnmayer east loading area.

Work Performed By:  CPFM FS Maintenance Support

ContactPiper Fahrney, CPFM Facilities Services Maintenance Support, 541-346-2319

HEDCO South Elevator Intermittently Working 2/9/22 – Unknown
Posted on

UPDATE 3/8/22:
Repairs have been completed on the South elevator.

 

UPDATE 2/10/22:
The elevator is running again. There is an intermittent issue with the door closing but it automatically resets itself.

 

Begin: Wednesday, February 9, 2022

End:    Unknown

Building Impacted: HEDCO South Elevator

Scope:  The south elevator is working intermittently. The Otis elevator technician is on-site investigating. An update will be sent when repairs are completed.

Services Impacted: The elevator is working intermittently.

Work Performed By: Otis

Contact:  Work Control Center, Campus Planning and Facilities Management, 541-346-2319