Student Rec Center HVAC Shutdown 9/16/21 – 9/17/21
Posted on

REVISED DATES:
The contractor has changed the dates and reschedule the work for September 16 – September 17.

 

BeginWednesday, September 15th, Thursday, September 16th, 2021 at 7:00 am

End:     Thursday, September 16th, Friday, September 17th, 2021 at 6:00 pm

Building(s) or Area(s) Impacted:  Student Rec Center (SRC)

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.

Services Impacted:  This will impact the main building air and should not affect mini-splits and local temperature control units.

Work Performed By:  ERS, Inc.

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

Esslinger Hall HVAC Shutdown 9/14/21 – 9/16/21
Posted on

REVISED DATES:

The contractor has made an adjustment to the dates. The work has been rescheduled for Tuesday 9/14 – Thursday 9/16.

 

BeginMonday, September 13th, Tuesday, September 14th, 2021 at 7:00 am

End:     Wednesday, September 15th, Thursday, September 16th, 2021 at 6:00 pm

Building(s) or Area(s) Impacted:  Esslinger Hall

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.

Services Impacted:  This will impact the main building air and should not affect mini-splits and local temperature control units.

Work Performed By:  ERS, Inc.

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

Pacific Hall HVAC Shutdown 9/10/21
Posted on

Begin:  Friday, September 10th, 2021 at 7:00 am

End:      Friday, September 10th, 2021 at 6:00 pm

Building(s) or Area(s) Impacted:  Pacific Hall

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.  This is to address the large air intakes and main air supply fans.

Services Impacted:  This will impact the main building air and should not affect mini-splits and local temperature control units.

Note:  Fume hood sashes will need to be closed and containers within the fume hoods sealed prior to the shutdown.

Work Performed By:  ERS, Inc.

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

 

Klamath Hall HVAC Shutdown 9/10/21
Posted on

Begin:  Friday, September 10th, 2021 at 7:00 am

End:      Friday, September 10th, 2021 at 6:00 pm

Building(s) or Area(s) Impacted:  Klamath Hall

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.  This is to address the large air intakes and main air supply fans.

Services Impacted:  This will impact the main building air and should not affect mini-splits and local temperature control units.

Note:  Fume hood sashes will need to be closed and containers within the fume hoods sealed prior to the shutdown.

Work Performed By:  ERS, Inc.

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

Streisinger Hall HVAC Shutdown 9/08/21 – 9/09/21
Posted on

Begin:  Wednesday, September 8th, 2021 at 7:00 am

End:      Thursday, September 9th, 2021 at 6:00 pm

Building(s) or Area(s) Impacted:  Streisinger Hall

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.  Apologies for the short notice.

Services Impacted:  This will impact the main building air and should not affect mini-splits and local temperature control units.

Note:  Fume hood sashes will need to be closed and containers within the fume hoods sealed prior to the shutdown.

Work Performed By:  ERS, Inc.

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

 

Lokey Labs HVAC Shutdown 9/08/21
Posted on

Begin:  Wednesday, September 8th, 2021 at 7:00 am

End:      Wednesday, September 8th, 2021 at 6:00 pm

Building(s) or Area(s) Impacted:  Lokey Labs

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.  Apologies for the short notice.

Services Impacted:  This will impact the main building air and should not affect mini-splits and local temperature control units.

Note:  Fume hood sashes will need to be closed and containers within the fume hoods sealed prior to the shutdown.

Work Performed By:  ERS, Inc.

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

Huestis Hall elevator down for repairs 9/3/21
Posted on
Begin: September 3, 2021

End: TBD

Building Impacted: Huestis Hall elevator

ScopeThe elevator is nonresponsive. The Otis elevator technician has been dispatched and will be on-site making repairs.

Services Impacted: The elevator is shutdown at the moment.

Extra Notes: An update will be sent when services are restored.

Work Performed By: Otis

Contact: Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Willamette Hall Construction Noise Advisory 9/09/21 – 9/10/21
Posted on

Begin:  Thursday, September 9th, 2021

End:      Friday, September 10th, 2021

Building(s) or Area(s) Impacted:  Willamette Hall

Scope:  Digital signage monitor (television) is being installed in the Willamette Atrium.

Services Impacted:

  • There will be intermittent drilling sounds as the network cabling and monitor mounts are being installed.
  • No other building disruptions are anticipated.

Work Performed By:  Network Telecom Services (NTS), Pro Sound & Video

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

 

Parking Lot 4 Closure Advisory 9/07/21 – 9/09/21
Posted on

Begin:  Tuesday, September 7th, 2021

End:      Thursday, September 9th, 2021

Building(s) or Area(s) Impacted:  Lot 4 (East of the Fine Arts Studios)

Scope:  Lot 4 will be closed next Tuesday, Wednesday, and Thursday for work associated with Knight Campus Phase 2.

Services Impacted:  Parking

Note:  Parking is available in the nearby Millrace Garage.

Work Performed By:  Contractor

ContactDarin Dehle, CPFM Director Capital Construction, 541-346-2282