Tent Set-ups Around Campus 9/13-9/18
Posted on

Begin:  Sunday, September 13th, 2020 at noon

End:      Friday, September 18th, 2020 at 5:00 pm

Building(s) or Area(s) Impacted: EMU Green, Women’s Quad, UHC east entrance, and Frohnmayer Music Hall

Scope: Stages NW will be installing five large tents on campus at various locations around campus.

Work Performed By: Stages NW

Contact: Luke Helm, CPFM Owner’s Representative, 541-346-8216

 

Onyx Bridge West Elevator Out of Service 9/11/20 – 9/16/20
Posted on

UPDATE 9/16/20: 

The elevator has been repaired and is operational.

 

Begin:  Current Issue – Friday, September 11, 2020

End:      Unknown

Building(s) or Area(s) Impacted:  Onyx Bridge

Scope:  The west elevator is unresponsive.  A specialist from Portland will be coming down to address the issue.

Services Impacted:  West elevator is out of service.

Special Instructions:  Please use the Onyx Bridge East elevator or the elevator in Pacific.

Work Performed By:   ThyssenKrupp

ContactWork Control Center, Campus Planning and Facilities Management 346-2319