12/17/25 University Hall Emergency Water and Sewer Line Shutdown
Posted on

Begin:  Wednesday, December 17, 2025, at 7:00 am

End:      Wednesday, December 17, 2025, at 3:00 pm

Building(s) or Area(s) Affected:  University Hall

Scope:  Delta Sand and Gravel will be working on a sewer line leaving University Hall. They will be working in the manhole located at the southeast corner of the building.

Services Impacted:  Plumbing is NOT to be used in University Hall for the duration of the work. This includes restrooms, breakroom sinks, and anything that drains to sanitary sewer.

Special Instructions: Restrooms are available to use in Villard Hall.

Work Performed By:  Delta Sand & Gravel and Fortis Construction

ContactRenee Benoit, CPFM Owner’s Representative, 541-346-5080

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of University Hall

12/1/25 – 12/1/28 Portland Child Behavioral Health Building Project and Parking Access Advisory
Posted on

Begin:  Monday, December 1, 2025, at 7:00 am

End:      Friday, December 1, 2028

Building(s) or Area(s) Affected:  Centennial Hall, Mary Neils Hall, Elizabeth Hall, Weber Hall, 6441 NE 30th House, parking at NE 29th Ave. between Centennial and Holman Apts, and the East Hall’s elevator.

Scope:  Site preparation will begin for the new Child Behavioral Health Building.  Beginning Monday, 12/1, the fencing will be installed.  On the following Monday, 12/8, abatement will begin on all the structures within the fenced perimeter.  Demolition to follow abatement in Spring/ Summer of ’26. East Hall elevator to be without phone service throughout the duration. Contact facilities if you need to operate the elevator.  Updates will be sent out as the project progresses.  The Child Behavioral Health Building construction is expected to be complete in the Winter ’28/29.

Services Impacted:

  • No parking or pedestrian traffic within fencing perimeter.
  • Abatement activities mostly limited to the interior of buildings and should not affect noise levels in surrounding areas.
  • Vehicular / construction traffic to be expected.

Special Instructions:  Alternate parking is available in campus parking lots or any of the side streets, except for NE 28th Ave..

Work Performed By:  GC Skanska, Abatement by Rose City, Alpha, and PMG

ContactAnnie Karel, CPFM D&C Owner’s Representative, 541-346-8215

Current construction and impacts information can be found on the UO Maps site.

Map view of affected area for the new Child Behavioral Health Building in Portland 12-1-25 thru 12-1-28

UO CBHB Logistics_11.12.25_Phase 1 Abatement

7/09/25 – 1715 Franklin 1st Floor North End Emergency Sanitary Line Shutdown
Posted on

ADDITIONAL INFORMATION:
Please do not flush anything other than toilet paper to prevent the system from clogging.  The current pumps do not have the ability to break down other materials like wipes or hygiene products.  Notices will be placed in the restrooms tomorrow regarding this issue.  Thank you for your understanding.

 

UPDATE:
The emergency repair has been completed and all services are back to normal.

 

Begin:  Wednesday, July 9, 2025 – effective immediately

End:      Wednesday, July 9, 2025

Building(s) or Area(s) Affected:  1715 Franklin – 1st floor only on the north end of building

Scope:  All sanitary lines for the 1st floor north end have been shut down for an emergency repair.  The sanitary sewer pit on the east side of the building will be cleaned out.  An update will be sent when the drain lines have been restored to service.

Services Impacted:

  • This affects the drinking fountains, sinks, and restrooms on the north end, 1st floor only.
  • The 2nd floor north end and the south end of the building are not impacted and drain lines are working in these sections.

Special Instructions:  Please use the drinking fountains, restrooms, and sinks on the 2nd floor or in the south end of the building.

Work Performed By:  CPFM Crews and Roto Rooter

ContactLydia Fitzpatrick, CPFM Campus Planning, Real Estate and Leasing Coordinator, 541-346-3804

Shaun Frasier, CPFM Plumbing and Mechanical Shop Manager, 541-346-0275

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

1715 Franklin on the map

7/15/25 – 7/31/25 Columbia St. and E. 17th Public Improvement Project and Traffic Advisory
Posted on

Begin:  Tuesday, July 15, 2025, at 7:00 am

End:      Thursday, July 31, 2025, at 5:00 pm

Building(s) or Area(s) Affected:  Central Kitchen, Traffic on E. 17th and Columbia St., Neighboring building traffic

Scope:  Public improvement project to install new manholes and extend public storm and sanitary lines to the Next Gen project site. Work will be completed in the south portion of the intersection of E. 17th and Columbia St., in Columbia St. between E. 17th and the north entrance of the Central Kitchen, and the north potion of the Central Kitchens parking/loading area.

Services Impacted:  Local traffic will be able to travel along E. 17th, but traffic will be limited and controlled while work in done in the intersection. During this period there will be a temporary closure to Columbia St. between E. 17th and the Central Kitchen.

Work Performed By:  Fortis Construction

ContactColin Brennan, CPFM Owner’s Representative, 541-346-8242 or 541-654-2972

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of location of Next Gen Project Site 7-15-25 thru 7-31-25

6/17/25 Riverfront Parkway Utility Work and Intermittent Slow Traffic Advisory
Posted on

Begin:  Tuesday, June 17, 2025, at 7:00 am

End:      Tuesday, June 17, 2025, at 2:00 pm

Building(s) or Area(s) Affected:  Riverfront Parkway, Knight Campus 1, Millrace Garage, and Millrace Drive

Scope:  Contractors will access existing manholes to test and inspect sewer connections. (see diagram below)

Services Impacted:  Intermittent slow traffic. Flaggers will be present.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Overhead map view showing utility access locations for sewer inspections on Riverfront Parkway 6/17/25

3/07/24 – 4/08/24 Klamath Hall Women’s Restroom #012B Shutdown
Posted on

UPDATE:
Harvey and Price will be here Monday, April 8th, for the full day, to address the broken 3” vent in the ceiling.  Noise is to be expected during the drilling and fastening of anchor points for the vent as it is properly supported to the wall.  This will then allow for the broken section to be removed and put back together.

 

Begin:  Thursday, March 7, 2024 – effective immediately

End:      Unknown    Monday, April 8, 2024

Building(s) or Area(s) Affected:  Klamath Hall Women’s Restroom #012

Scope:  Women’s restroom #012B will be shut down due to a cracked sewer vent pipe.  An update will be sent when the restroom has been restored to service.

Services Impacted:  This restroom will be offline during this time.

Special Instructions:  Please use other restrooms in the building.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Klamath Hall Women's Restroom 012B

7/06/23 PeaceHealth North Domestic Water Shutdown
Posted on

Begin:  Thursday, July 6, 2023, at 5:00 am

End:      Thursday, July 6, 2023, at 7:30 am

Building(s) or Area(s) Affected:  PeaceHealth North

Scope:  The main water line that supplies 677 E. 12th is in need of repair.  Work will be performed early in the morning.

Services Impacted:  There will not be any water during this time for drinking fountains, sinks, or toilets until the repair is completed.

Work Performed By:  Rexius and PeaceHealth North

ContactMelinda Seeley, CPFM Campus Planning, Real Estate Property Specialist, 541-346-5550

Current construction and impacts information can be found on the UO Maps site.

Image of PeaceHealth North

6/19/23 – 7/06/23 East 13th Ave., Kincaid St., Duck Store Area Construction Work Advisory
Posted on

Begin:  Monday, June 19, 2023

End:      Thursday, July 6, 2023

Building(s) or Area(s) Affected:  West and north sides of the UO Duck Store, E. 13th Ave., and Kincaid Street

Scope:  A privately engineered public improvement (PEPI) project is planned for construction within the right-of-way that is adjacent to the UO Duck Store. The project is privately designed, privately funded, and privately constructed.  The construction will occur at 871 E 13th Avenue in Eugene, Oregon 97401.  Please see the attached map for the project location.

Construction within E. 13th Avenue will begin in late June, approximately June 26th. Construction within Kincaid Street will begin roughly a week later.  During construction, the sidewalk on the north side of E. 13th Avenue and on the west side of Kincaid Street will be closed. Work on Kincaid Street will be done at night.  This project includes utility Improvements. The improvements include:

  • Sanitary sewer line extension
  • New sanitary manhole
  • Storm line extension
  • New storm manhole
  • Minor paving 12th Alley, E 13th Avenue and Kincaid Street

Work Performed By:  John Hyland Construction

Contact:  If you have questions or concerns regarding design Issues, please contact:

Donna Stark
City of Eugene Public Works Engineering
OR 99E Broadway, Ste 400
Eugene, OR 97401
541.729.4638
dstark@eugene-or.gov

Aaron Williams
John Hyland Construction
1941Laura Street
Springfield, OR 97477
541.501.8623
awi1liams@jhconst.com

Current construction and impacts information can be found on the UO Maps site.

Map of area by the Duck Store 6-14-23

Construction Work by UO Duck Store

6/14/23 – 6/15/23 – 1715 Franklin North Wing Drainage System Shutdown
Posted on

UPDATE:
While repairs are made to the sewage lift station, seven parking spaces (#8 – #14) will be blocked off for the contractor’s pump truck.  These spots are located directly in front of the east entrance.

Image of parking lot at 1715 Franklin

 

Begin:  Wednesday, June 14, 2023, at 7:00 am

End:      Thursday, June 15, 2023, at 5:00 pm

Building(s) or Area(s) Affected:  1715 Franklin Blvd – North Wing

Scope:  Due to sewage lift station repair/upgrade, all drain piping will be out of service on the first and second floor of the north wing until repairs are complete.

Services Impacted:  This will impact usage of domestic hot and cold water in all sinks, toilets, urinals, and drinking fountains.

Special InstructionsPlease use restrooms and sinks in the south wing.

Work Performed By:  CPFM Facilities and Roto Rooter

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of 1715 Franklin 1st floor north wing

5/26/23 – 6/01/23 – Collier House Sewer Line Emergency Shutdown
Posted on

UPDATE 6/01/23:
All sinks and restrooms are now operational and can be used.

 

UPDATE 5/26/23:
The second floor kitchen and bathroom will remain out of order until further notice due to issues encountered with the sewer line.  Only the first floor restroom, which is on a separate sewer line, is still operational.  An update will be sent when repairs have been completed.

 

Begin:  Friday, May 26, 2023 – effective immediately

EndUnknown Thursday, June 1, 2023

Building(s) or Area(s) Affected:  Collier House

Scope:  The sewer line has been shut down to remove a clog in the system.  An update will be sent when the drain is back online.

Services Impacted:

  • All drain lines in the building for the sinks and restrooms will be offline.
  • Noise and odor can be expected outside of the building as the contractor jets the system.

Work Performed By:  Roto Rooter

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Collier House