3/07/24 – 4/08/24 Klamath Hall Women’s Restroom #012B Shutdown

UPDATE:
Harvey and Price will be here Monday, April 8th, for the full day, to address the broken 3” vent in the ceiling.  Noise is to be expected during the drilling and fastening of anchor points for the vent as it is properly supported to the wall.  This will then allow for the broken section to be removed and put back together.

 

Begin:  Thursday, March 7, 2024 – effective immediately

End:      Unknown    Monday, April 8, 2024

Building(s) or Area(s) Affected:  Klamath Hall Women’s Restroom #012

Scope:  Women’s restroom #012B will be shut down due to a cracked sewer vent pipe.  An update will be sent when the restroom has been restored to service.

Services Impacted:  This restroom will be offline during this time.

Special Instructions:  Please use other restrooms in the building.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Klamath Hall Women's Restroom 012B

7/06/23 PeaceHealth North Domestic Water Shutdown

Begin:  Thursday, July 6, 2023, at 5:00 am

End:      Thursday, July 6, 2023, at 7:30 am

Building(s) or Area(s) Affected:  PeaceHealth North

Scope:  The main water line that supplies 677 E. 12th is in need of repair.  Work will be performed early in the morning.

Services Impacted:  There will not be any water during this time for drinking fountains, sinks, or toilets until the repair is completed.

Work Performed By:  Rexius and PeaceHealth North

ContactMelinda Seeley, CPFM Campus Planning, Real Estate Property Specialist, 541-346-5550

Current construction and impacts information can be found on the UO Maps site.

Image of PeaceHealth North

6/19/23 – 7/06/23 East 13th Ave., Kincaid St., Duck Store Area Construction Work Advisory

Begin:  Monday, June 19, 2023

End:      Thursday, July 6, 2023

Building(s) or Area(s) Affected:  West and north sides of the UO Duck Store, E. 13th Ave., and Kincaid Street

Scope:  A privately engineered public improvement (PEPI) project is planned for construction within the right-of-way that is adjacent to the UO Duck Store. The project is privately designed, privately funded, and privately constructed.  The construction will occur at 871 E 13th Avenue in Eugene, Oregon 97401.  Please see the attached map for the project location.

Construction within E. 13th Avenue will begin in late June, approximately June 26th. Construction within Kincaid Street will begin roughly a week later.  During construction, the sidewalk on the north side of E. 13th Avenue and on the west side of Kincaid Street will be closed. Work on Kincaid Street will be done at night.  This project includes utility Improvements. The improvements include:

  • Sanitary sewer line extension
  • New sanitary manhole
  • Storm line extension
  • New storm manhole
  • Minor paving 12th Alley, E 13th Avenue and Kincaid Street

Work Performed By:  John Hyland Construction

Contact:  If you have questions or concerns regarding design Issues, please contact:

Donna Stark
City of Eugene Public Works Engineering
OR 99E Broadway, Ste 400
Eugene, OR 97401
541.729.4638
dstark@eugene-or.gov

Aaron Williams
John Hyland Construction
1941Laura Street
Springfield, OR 97477
541.501.8623
awi1liams@jhconst.com

Current construction and impacts information can be found on the UO Maps site.

Map of area by the Duck Store 6-14-23

Construction Work by UO Duck Store

6/14/23 – 6/15/23 – 1715 Franklin North Wing Drainage System Shutdown

UPDATE:
While repairs are made to the sewage lift station, seven parking spaces (#8 – #14) will be blocked off for the contractor’s pump truck.  These spots are located directly in front of the east entrance.

Image of parking lot at 1715 Franklin

 

Begin:  Wednesday, June 14, 2023, at 7:00 am

End:      Thursday, June 15, 2023, at 5:00 pm

Building(s) or Area(s) Affected:  1715 Franklin Blvd – North Wing

Scope:  Due to sewage lift station repair/upgrade, all drain piping will be out of service on the first and second floor of the north wing until repairs are complete.

Services Impacted:  This will impact usage of domestic hot and cold water in all sinks, toilets, urinals, and drinking fountains.

Special InstructionsPlease use restrooms and sinks in the south wing.

Work Performed By:  CPFM Facilities and Roto Rooter

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of 1715 Franklin 1st floor north wing

5/26/23 – 6/01/23 – Collier House Sewer Line Emergency Shutdown

UPDATE 6/01/23:
All sinks and restrooms are now operational and can be used.

 

UPDATE 5/26/23:
The second floor kitchen and bathroom will remain out of order until further notice due to issues encountered with the sewer line.  Only the first floor restroom, which is on a separate sewer line, is still operational.  An update will be sent when repairs have been completed.

 

Begin:  Friday, May 26, 2023 – effective immediately

EndUnknown Thursday, June 1, 2023

Building(s) or Area(s) Affected:  Collier House

Scope:  The sewer line has been shut down to remove a clog in the system.  An update will be sent when the drain is back online.

Services Impacted:

  • All drain lines in the building for the sinks and restrooms will be offline.
  • Noise and odor can be expected outside of the building as the contractor jets the system.

Work Performed By:  Roto Rooter

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Collier House