11/18/25 – 11/22/25 Kincaid St., E. 14th and E. 15th Avenues, and Lots 16A-B Game Day Access Advisory
Posted on

UPDATE:

  • The north bound lane between E. 13th and E. 14th Avenues, starting today, will be closed through Saturday.
  • The maps have been revised below to reflect parking on each side of the street, and starting tomorrow, the 19th and running through Saturday, the 22nd, extending down to E. 15th Avenue.

 

Begin:  Tuesday, November 18, 2025

End:     Saturday, November 22, 2025

Building(s) or Area(s) Affected:  Kincaid Street, E. 14th and 15th Avenues, and Lots 16A-B

Scope:  Traffic and parking will be impacted in support of College Gameday.   (see maps and schedules below)

ContactTransportation Services, 541-346-5444

Kincaid St. Closure: Tuesday, November 18
All parking spaces on both sides of Kincaid St. from E. 13th to E. 14th Ave. reserved for delivery trucks and staging.

Map of Game Day Area Affected 11-18-25 - revised

Kincaid St. Closure: Tuesday, November 19 – Saturday, November 22
All parking spaces on both sides of Kincaid St. from E. 13th to E. 15th Ave. reserved for delivery trucks and staging.

Map of Game Day Area Affected 11-19-25 - Revised

Kincaid St., E. 14th and E. 15th Avenue Closure: Tuesday, November 20 – Saturday, November 22
All parking spaces on both sides of Kincaid St. from E. 13th to E. 15thAve., and all spaces on both sides of E. 14th and E. 15th Ave. between Kincaid and Alder Streets reserved for delivery trucks and staging.

Game Day Area Affected 11-20 thru 11-22, 2025 - Revised

Kincaid St., E. 14th and E. 15th Avenue, Lot 16A Closure:  Saturday, November 22
All parking spaces on both sides of Kincaid St. from E.  13th to E. 15thAve. and all spaces on both sides of E. 14th and E. 15th Ave. between Kincaid and Alder Streets reserved for delivery trucks and staging. Lot 16A will also be closed.

Map of Game Day Area Affected 11-22-25

Current construction and impacts information can be found on the UO Maps site.

11/13/25 Old Greenhouse Fence Realignment and Access Advisory
Posted on

Begin:  Thursday, November 13, 2025, at 9:00 am

End:      Thursday, November 13, 2025, at 5:00 pm

Building(s) or Area(s) Affected:  SW of the Old Greenhouse (By Gallery Way)

Scope:  The fence corner is being realigned at the SW corner of the Greenhouses on the gravel road.

Services Impacted:  Noise and access to greenhouses via the gravel road will be affected.

Work Performed By:  Island Fence

ContactJenna Shope, CPFM Owner’s Representative, 541-346-2281

Current construction and impacts information can be found on the UO Maps site.

Overhead aerial view of fence realignment SW of the Old Greenhouse 11/13/25

10/31/25 – 11/02/25 Riverfront Parkway Paving and Odor Advisory
Posted on

Begin:  Friday, October 31, 2025, at 6:00 am

End:      Sunday, November 2, 2025 – end of day

Building(s) or Area(s) Affected:  Riverfront Parkway

Scope:  Contractors will be installing asphalt paving in the areas shown on the map below on Friday, October 31st and Sunday, November 2nd.

Services Impacted:  Buildings adjacent to areas being paved may experience asphalt odor during the work. The road closure is already in effect per previous notice to campus.

Special Instructions:  Please use the detour routes already in place via Moss St., Villard St., or Walnut St.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Overhead map view for the Riverfront Parkway paving and odor advisory 10/31/25 - 11/02/25Overhead map view showing detour route for the Riverfront Parkway 10/27/25 - 11/07/25

10/27/25 – 11/04/25 Riverfront Parkway Road Work and Closure Advisory
Posted on

UPDATE:
Riverfront Parkway has been reopened to traffic.

 

Begin:  Monday, October 27, 2025, at 6:00 am

End:      November 7, 2025, at 5:00 pm     Tuesday, November 4, 2025 – effective immediately

Building(s) or Area(s) Affected:  Riverfront Parkway

Scope:  The contractor must remove significant roadway material in all lanes of Riverfront Parkway. They will then rebuild and repave the roadway to meet the City of Eugene’s requirements.

Services Impacted:

  • All lanes of Riverfront Parkway will be closed.  (See map for detour route)
  • The east sidewalk will remain open for pedestrian traffic.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Overhead map view showing detour route for the Riverfront Parkway 10/27/25 - 11/07/25

10/21/25 North Campus Fiber Optic Documentation Advisory
Posted on

Begin:  Tuesday, October 21, 2025, at 9:00 am

End:      Tuesday, October 21, 2025, at 5:00 pm

Building(s) or Area(s) Affected:  Two areas immediately north of the railroad tracks: north of Zebrafish and the Millrace Parking buildings.

Scope:  Lane Council of Governments will be working to do some fiber optic splice documentation in communications vaults next to the railroad tracks.

Services Impacted:  They will have a vehicle in the area and will be working at each site for an hour or two.

Work Performed By:  Lane Council of Governments

ContactEric Fullar, Tech Business Relationship Manager, Information Services, 541-346-1015

Current construction and impacts information can be found on the UO Maps site.

Overhead map locations for fiber optic work north of the railroad tracks 10/21/25

10/02/25 – 12/18/25 Campus Fall Street Sweeping Advisory
Posted on

Begin:  Thursday, October 2, 2025

End:      Thursday, December 18, 2025

Building(s) or Area(s) Affected:  Campus Wide

Scope:  Attached is a map of the areas that will have street sweeping done overnight Thursday night into Friday morning. This will happen each week of Fall until the bulk of the leaves have fallen.

Services Impacted:  A slow-moving street sweeper will be on the street during the designated time.

Work Performed By:  Emeral Valley Sweeping

ContactTim Winder, CPFM Landscape Maintenance Manager, 541-346-5771

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of the map for Fall 2025 leaf street sweeping routes

9/08/25 – 9/15/25 Riverfront Parkway Turn Lane Access and Detour Advisory
Posted on

UPDATE:
The end date has been extended to Monday, September 15th.  The barriers will be removed that day.

 

Begin:  Monday, September 8, 2025, at 7:00 am

End:    Monday, September 12  15, 2025

Building(s) or Area(s) Affected:  Riverfront Parkway and Millrace Drive

Scope:  Riverfront Parkway’s left turn lane for eastbound traffic onto Franklin Blvd. will be closed to allow contractors to remove a sign and plantings from the median of Riverfront Pkwy. Southbound and northbound lanes on Riverfront Pkwy will remain open to vehicle traffic. (See diagram below re location affected and detour route)

Services Impacted:

  • This will affect vehicle traffic turning from Millrace Drive to Riverfront Parkway to Franklin Blvd. eastbound.
  • Intermittent flagging may be required.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Diagram of the Millrace Drive turn lane closure and detour 9-8-25 thru 9-12-25

Riverfront Turn Lane Closure Sept 8 – 12_ 2025

 

9/08/25 – 9/09/25 Jordan Schnitzer Museum of Art North Courtyard Art Installation Advisory
Posted on

Begin:  Monday, September 8, 2025, at 7:00 am

End:      Tuesday, September 9, 2025, at 7:00 am

Building(s) or Area(s) Affected:  Jordan Schnitzer Museum of Art, Susan Campbell, and Tykeson Hall

Scope:  One large-scale sculpture will be installed in the JSMA’s North Courtyard.

Services Impacted:

  • Access to the JSMA’s parking lot (including one ADA parking spot), loading dock, security entrance, bike cage, trash collection, north courtyard, north sidewalk, and the west side of Susan Campbell Hall will be limited during crane work operations (7:00 am – 5:00 pm).
  • Crane staging and art crating will be located in the JSMA’s parking lot.
  • There will be limited access to the west end of Johnson Lane.

Work Performed By:  Artech, Ness Campbell, and JSMA staff

Contact:  Alexander Ellis, Jordan Schnitzer Museum of Art, 541-346-0876

Current construction and impacts information can be found on the UO Maps site.

Diagram of Jordan Schnitzer's Museum of Art security perimeter for an art installation on 9/08/25 - 9/09/25

8/13/25 – 8/19/25 Millrace Drive, Garden Avenue, and Villard Street Utility Work Advisory
Posted on

Begin: Wednesday, August 13, 2025 at 9:00 am

End:     Tuesday, August 19, 2025 at 4:00 pm

Building(s) or Area(s) Affected: Millrace Drive, Garden Avenue, and Villard Street

Scope: EWEB Water Engineering is working on the design for a transmission main on Millrace Drive, Garden Avenue, and Villard Street.  They will be working with a contractor to pothole crossing utilities for project design.  Work is expected to take 3-5 business days to complete.

Services Impacted: Access to UO buildings and parking areas along this route may be temporarily impacted but traffic interruptions should be minimal.

Work Performed By: EWEB and Professional Underground

Contact: Work Control Center, UO Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Millrace impacts outlined on the map

7/29/25 – 8/05/25 Agate Street (Between E. 15th and E. 18th) Closed for USATF Outdoor National Meet
Posted on

Begin:  Tuesday, July 29, 2025

End:      Tuesday, August 5, 2025

Building(s) or Area(s) Affected:  Agate Street between E. 15th Avenue and E. 18th Avenue

Scope:  A section of road on Agate Street, between 15th and 18th Ave., will be closed for the USATF Outdoor & Para National Championships at Hayward Field.

Services Impacted:  This section will be shut down.  Please use alternate routes.

ContactJames McGladrey, UO Transportation Services Assistant Director – Field Operations, 541-346-2676

Current construction and impacts information can be found on the UO Maps site.

Overhead map view showing Agate Street between E. 15th Avenue and E. 18th Avenue

7/22/25 Jordan Schnitzer Museum of Art North Courtyard Art Deinstallation Advisory
Posted on

Begin:  Tuesday, July 22, 2025, at 7:00 am

End:      Tuesday, July 22, 2025, at 5:00 pm

Building(s) or Area(s) Affected:  Jordan Schnitzer Museum of Art, Susan Campbell, and Tykeson Hall

Scope:  One large-scale sculpture will be deinstalled from the JSMA’s North Courtyard.

Services Impacted:

  • Access to the JSMA’s parking lot (including one ADA parking spot), loading dock, security entrance, bike cage, trash collection, north courtyard, north sidewalk, and the west side of Susan Campbell Hall will be limited during crane work operations (7:00 am – 5:00 pm).
  • Crane staging and art crating will be located in the JSMA’s parking lot.
  • There will be limited access to the west end of Johnson Lane.

Work Performed By:  Artech, Ness Campbell, and JSMA staff

Contact:  Alexander Ellis, Jordan Schnitzer Museum of Art, 541-346-0876

Current construction and impacts information can be found on the UO Maps site.

Overhead aerial view of Schnitzer Museum of Art

7/12/25-7/13/25 and 7/19/25-7/20/25 Campus Annual Summer Parking Lot Restriping Closure Advisory
Posted on

1st Weekend:  Saturday, July 12, 2025 and Sunday, July 13, 2025

2nd Weekend:  Saturday, July 19, 2025, and Sunday, July 20, 2025

Scope: Summer parking lot maintenance will be performed on the weekends for the locations listed below.

Services Impacted:  Lots will be closed the preceding Friday night for both Saturday and Sunday work.

Extra Notes: The lots will be re-opened as soon as the paint is dry.

Parking Lots Impacted Saturday, July 12, 2025:
1E – NW corner of Baker Downtown
2 – CPFM lot east of power plant and south of CPFM Warehouse
3A – Strip N of Wilkinson House and Millrace Studios and S of ZIRC
3B – Parking areas N of Lock Shop and buildings N of Zebrafish
10 – N side of Lawrence Hall
11 – NE side of Friendly Hall
12B – N of Streisinger, Klamath, and NE of Onyx Bridge
14 – NE corner by Oregon Hall
47 – W and S of Rainier
57 – N of 1600 Millrace and S of the Millrace Garage
58 – North and east of 1715 Franklin
60 – SE of 1900 Millrace
62 – Lot east of Millrace Garage
Millrace Riverfront

Parking Lots Impacted Sunday, July 13, 2025:
23 – E of Johnson Hall and W of Collier House
25 – E of JSMA and W of Susan Campbell
26 – S of Gerlinger Annex
27 – Horseshoe parking E of Hendricks
28 – Horseshoe parking E of Gerlinger Hall
29A – S of EMU
29D – Street parking W of Straub
30 – S and E of McArthur Court and W and N of Student Tennis
34E – Lot S of Global Scholars Hall and N of Kalapuya Ilihi
36A – E of Carson and W of University Health Services
36B – SW corner of University Health Services
13th Avenue Crosswalk
15th Avenue
Carson Loading Dock
Johnson Fire Lane
University Street

Parking Lots Impacted Saturday, July 19, 2025:
8 – SE of Matthew Knight Arena
15 – E of Jaqua Academic Center
34A – NE of Knight Law Center
34B – N of Viv Olum Child Center
34C – E of Many Nations Longhouse/Viv Olum/Oregon Law Clinic
37 – Long lot E of Hamilton and W of Ford Alumni Center
41 – NE parking by Outdoor Program Barn and SW of Jane Sanders Stadium
49 – South of Riley Hall
50 – Parking lot for Barnhart Residence Hall
59A – North end of Romania
59B – South and east sides of Romania
13th Avenue Garage
Baker Downtown Center Loading Dock
EC Cares 1500 W. 12th Ave.
Motor pool north site

Parking Lots Impacted Sunday, July 20, 2025:
6B – Half-moon N of Miller Theatre and McKenzie Hall, N side of East 11th Ave.
7B – NW corner of McKenzie Hall (ADA Ramp)
16A – NW of PLC and SW of Condon
16B – W of Condon
17 – West of HEDCO
18 – West of Clinical Services at corner of Alder St and E. 18th Ave.
19 – South of HEDCO and north of Clinical Services
20 – E of Education Annex and N of Music
21 – South of Clinical Services
22 – E of Berwick Hall
40 – Parking garage below HEDCO
42 – W of UO Annex
13th Ave – Permit required line
Bus Zone – East of Lot 18

Work Performed By: Transportation Services

Contact: James McGladrey, UO Transportation Services Assistant Director – Field Operations, 541-346-2676

Overhead map view of Campus parking lots 2025

7/15/25 – 7/31/25 Columbia St. and E. 17th Public Improvement Project and Traffic Advisory
Posted on

Begin:  Tuesday, July 15, 2025, at 7:00 am

End:      Thursday, July 31, 2025, at 5:00 pm

Building(s) or Area(s) Affected:  Central Kitchen, Traffic on E. 17th and Columbia St., Neighboring building traffic

Scope:  Public improvement project to install new manholes and extend public storm and sanitary lines to the Next Gen project site. Work will be completed in the south portion of the intersection of E. 17th and Columbia St., in Columbia St. between E. 17th and the north entrance of the Central Kitchen, and the north potion of the Central Kitchens parking/loading area.

Services Impacted:  Local traffic will be able to travel along E. 17th, but traffic will be limited and controlled while work in done in the intersection. During this period there will be a temporary closure to Columbia St. between E. 17th and the Central Kitchen.

Work Performed By:  Fortis Construction

ContactColin Brennan, CPFM Owner’s Representative, 541-346-8242 or 541-654-2972

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of location of Next Gen Project Site 7-15-25 thru 7-31-25

6/17/25 Riverfront Parkway Utility Work and Intermittent Slow Traffic Advisory
Posted on

Begin:  Tuesday, June 17, 2025, at 7:00 am

End:      Tuesday, June 17, 2025, at 2:00 pm

Building(s) or Area(s) Affected:  Riverfront Parkway, Knight Campus 1, Millrace Garage, and Millrace Drive

Scope:  Contractors will access existing manholes to test and inspect sewer connections. (see diagram below)

Services Impacted:  Intermittent slow traffic. Flaggers will be present.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Overhead map view showing utility access locations for sewer inspections on Riverfront Parkway 6/17/25

6/30/25 – 9/08/25 Parking Lot #12A (E. of Lawrence Hall) Excavation Work and Repaving Advisory
Posted on

UPDATE 7/29/25:
To accommodate an addition to the project’s excavation work, construction fencing will be adjusted on 8/4/25, as shown on the attached site layout, to create an alternative pedestrian route. This fencing configuration, and associated pathway, will remain in place until 8/15/25. The fencing will then return to its prior layout, on 8/16/25.

Diagram of the altered fencing configuration (from 8/4/25 thru 8/15/25) for the Lot 12A excavation work and repaving project by Lawrence Hall

2nd UPDATE 7/18/25:
The concrete delivery mentioned below has been delayed, due to subcontractor schedule changes, and will now be taking place between 8:00 am and 10:00 am instead of 5:00 am to 7:00 am.

 

UPDATE 7/18/25:
The blue bins for paper, block Styrofoam, and food scraps are located behind Pacific Hall near the end of the fire lane.  The dumpsters for garbage and cardboard recycling are still situated by the front of Columbia Hall as mentioned previously.

Picture of relocated bins during Lot 12A Project 6/30/25 thru 9/08/25

 

UPDATE 7/17/25:

On Monday, July 21st, from 5:00 am to 7:00 am, the contractor will be performing concrete pours, and as part of that, expect several concrete trucks and additional equipment moving around and through the worksite and adjacent portions of the lot.

Due to the early timing, this is not expected to provide much, if any, disturbance. Only anticipated difficulty could be limited vehicular movement withing the parking lot itself, during the work, possibly causing minor delays.

Overhead map view of the truck route and area of work for Lot 12A on 7/21/25

 

UPDATE:
The dumpsters for garbage and recycling have been moved from east side of Pacific Hall to the west side of Columbia Hall for the duration of this project.

overhead aerial view of dumpster location west of Columbia Hall

 

Begin:  Monday, June 30, 2025, at 7:00 am

End:      Monday, September 8, 2025, at 5:00 pm

Building(s) or Area(s) Affected:  Entirety of parking lot 12A’s west side spaces and associated ADA spaces, Lawrence Hall west entry, and adjacent east side walking path (as shown in site logistics plan)

Scope:  Beginning 6/30/25, in order to install an electrical vault towards bettering Campus electrical service and safety, Andersen Construction and Pacific Excavation will be performing excavation work, and repaving, within the west side of parking lot 12A, adjacent to Lawrence Hall’s east side entry.  Please see attached logistics plan for a more detailed perspective.  Thank you for your understanding as we carry out this work.

Services Impacted:

  • During this work there will be times of consistent, as well as intermittent, construction noise, particularly during the excavation phase of the project.  There will be some vibration during the associated earthwork compaction.
  • Some odor will also be present during the paving portion, and it will be mitigated as much as possible.
  • There will also be a short-term electrical shutdown, to be schedule at a time that will produce as much limited interruption and inconvenience as possible. Once the timing of that task is defined, this notice will be updated for your awareness.

Work Performed By:  Pacific Excavation & Andersen Construction

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

Current construction and impacts information can be found on the UO Maps site.

Logistics plan for Parking Lot #12A (E. of Lawrence Hall) Excavation Work and Repaving Advisory 6/30/25 - 9/08/25

6/30/25 – 12/31/27 Friendly Hall Renovation Project and Access Advisory
Posted on

UPDATE 10/08/25:
As part of the seismic work at Friendly Hall, a drill rig will be utilized in the parking lot.  Expect noise from the diesel rig during work hours of 6:00 am – 3:00 pm starting Friday, October 10th and continuing through next week to Friday, October 17th.  There will also be a concrete pumping truck on site next week.

 

UPDATE 8/15/25:
We are not able to provide campus power to the construction trailers at the Collier Lawn as previously shown. Therefore, the trailers will be located at the north side of E. 13th Ave. on the SW corner of Friendly Hall on the sidewalk and into the street on E. 13th Ave.  The revised fencing is shown in orange.  The Collier Lawn site will continue to be fenced but reduced and used for material storage and laydown purposes.

Fire access is still available on E. 13th Ave as is regular delivery vehicles, bikes, and pedestrians.  ADA crossing will be on the west side of Johnson Hall across E. 13th Ave. and signage will be updated to reflect that movement.

Updated route for Friendly Hall Renovation Project 8/15/25

UPDATE 8/08/25:
The second phase of site logistics and fencing will begin on August 11th. Site work will include tree removal, and the fencing will be revised to match the attached map.

Collier Lawn will be unavailable until December 2027. Contractor trailers will move onto the site August 25th.

Overhead map view of the Friendly Hall Site Logistics for Late August 2025

Begin:  Monday, June 30, 2025

End:      Friday, December 31, 2027

Building(s) or Area(s) Affected:  Friendly Hall

Scope:  Friendly Hall will undergo a full deferred maintenance renovation project starting this summer, June 30, 2025, through December 2027. Occupants will be moved out to allow for full abatement and construction activities. Bremik Construction is our contractor partner for this work. They have put together a site logistics maps detailing the construction fence line and impacts to pedestrian/bike/vehicle traffic and parking.

Services Impacted:

  • The area directly around Friendly Hall will be fenced off, closing Lot 11 during the timeline above.
  • Construction fencing and trailers will be placed in the Collier Hall lawn across E. 13th Ave. starting in mid-August through December 2027. Please see attached maps.
  • Pedestrian/bike/vehicle traffic and parking will be impacted.
  • E. 13th Ave. will remain open with pedestrian travel along the south sidewalk.
  • The surrounding areas/events that will be affected are Allen Hall, Collier House, Johnson Hall, Lot 11, ASUO Street Faire, EMU Scheduling and Events.

Work Performed By:  Bremik Construction

ContactMartina Oxoby, CPFM Senior Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of area affected by the Friendly Hall Renovation 6/30/25 - 12/31/27

Friendly Hall Site Logistics Maps Notification

5/20/25 – 5/23/25 CPFM Warehouse Fleet Services Lift Installation and Noise Advisory
Posted on

Begin:  Tuesday, May 20, 2025, at 8:00 am

End:      Friday, May 23, 2025, at 3:30 pm

Building(s) or Area(s) Affected:  CPFM Warehouse Building #130

Scope:  A second lift is being installed in the Fleet Services location which will involve the cutting and chipping of concrete.

Services Impacted:  Very loud noise is to be expected during the concrete work.

Special Instructions:  The lane between the Utilities & Energy building and the CPFM Warehouse may be affected at times related to the staging of the construction vehicles.  During that time, please reroute around the power plant.

Work Performed By:  Contractor

ContactShaun Frasier, CPFM Plumbing and Mechanical Shop Manager, 541-346-0275

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead aerial view of Bldg. 130 and the surrounding area

Cancelled – Spring Street Faire East 13th Avenue Vehicle Access and Closure Schedule
Posted on

UPDATE:
The Spring Street Faire has been cancelled.
Thank you for your partnership and please accept our apologies for the inconvenience of this last-minute decision.

 

Begin:  Monday, May 5, 2025

End:      Monday, May 12, 2025

Building(s) or Area(s) Affected:  East 13th Avenue between University Street and Kincaid Street

Scope:  The 2025 Spring ASUO Street Faire runs from Wednesday, May 7th to Friday, May 9th.

Services Impacted:  East 13th Avenue from University Street to Kincaid Street will be blocked for any normal traffic before and during the 2025 faire.  (see schedule below)

    • Beginning the morning of Monday, May 5, 2025, CPFM staff will start removing all bicycle racks, scooter racks and bollards from the street and sidewalks. Normal traffic open but extra caution should be taken while moving through the street.
    • The afternoon on Monday, May 5, 2025, ASUO Executive Street Faire Committee Members will begin chalking the sidewalks for booth space layouts. Normal traffic open but extra caution should be taken while moving through the street.
    • Between 7:00 am and 12:00 noon Tuesday, May 6, 2025, event supply deliveries of lighting, handwashing stations, wastewater receptacles, and portable restrooms will begin to be delivered and set in place. Normal traffic open but extra caution should be taken while moving through the street.
    • At 12:00 noon Tuesday, May 6, 2025, E. 13th Avenue from University Street to Kincaid Street will be blocked for any flow through traffic. Traffic will be limited to approved vendors to set up at designated times in assigned spaces. The only other automobile traffic allowed will be slow moving Accessibility Shuttle, and Emergency Vehicles.
    • Departmental Delivery and Service Vehicles (including mini vehicles and golf carts such as Mailing Services, CPFM maintenance, Catering Services will not be allowed through the street between 12:00 noon and 9:00 pm.
    • Outside Delivery and Service Vehicles will not be allowed through the street between 12:00 noon and 9:00 pm.
    • Wednesday, May 7, 2025, from 7:00 am to 7:00 pm E. 13th Avenue from University Street to Kincaid Street will be blocked for any flow through traffic. Traffic will be limited to approved vendors to set up at designated times in assigned spaces. The only other automobile traffic allowed will be slow moving Accessibility Shuttle, and Emergency Vehicles.
    • Departmental Delivery and Service Vehicles (including mini vehicles and golf carts such as Mailing Services, CPFM maintenance, Catering Services will not be allowed through the street between 7:00 am and 7:00 pm.
    • Outside Delivery and Service Vehicles will not be allowed through the street between 7:00 am and 7:00 pm.
    • Thursday, May 8, 2025, from 7:00 am to 7:00 pm E. 13th Avenue from University Street to Kincaid Street will be blocked for any flow through traffic. Traffic will be limited to approved vendors to refresh supplies at designated times in assigned spaces. The only other automobile traffic allowed will be slow moving Accessibility Shuttle, and Emergency Vehicles.
    • Departmental Delivery and Service Vehicles (including mini vehicles and golf carts such as Mailing Services, CPFM maintenance, Catering Services will not be allowed through the street between 7:00 am and 7:00 pm.
    • Outside Delivery and Service Vehicles will not be allowed through the street between 7:00 am and 7:00 pm.
    • Friday, May 9, 2025, from 7:00 am to 7:00 pm E. 13th Avenue from University Street to Kincaid Street will be blocked for any flow through traffic. Traffic will be limited to approved vendors to refresh supplies and pack up/move out at designated times in assigned spaces. The only other automobile traffic allowed will be slow moving Accessibility Shuttle, and Emergency Vehicles.
    • Departmental Delivery and Service Vehicles (including mini vehicles and golf carts such as Mailing Services, CPFM maintenance, Catering Services will not be allowed through the street between 7:00 am and 9:00 pm.
    • Outside Delivery and Service Vehicles will not be allowed through the street between 7:00 am and 9:00 pm.
    • From Noon on Tuesday, May 6, 2025, through 9:00 pm on Friday, May 9, 2025, vendors will be on the sidewalks of E. 13th Avenue between University Street and Kincaid Street. Flow through automobile traffic will be restricted. Pedestrian traffic (foot, scooter, skates & bicycles) will be allowed at “slow roll” (no more than 5 mph) with caution and redirected to the street itself. In most cases the majority of the sidewalk will be blocked.
    • Beginning Monday, May 12, 2025, CPFM staff will reinstall all bicycle racks, scooter racks and bollards back to the street and sidewalks. Normal traffic open but extra caution should be taken while moving through the street.

Contact:  Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Aerial view of the ASUO Street Faire location on East 13th Avenue

5/10/25 – 5/11/25 Riverfront Parkway Crane Activity and Road Closure
Posted on

Begin:  Saturday, May 10, 2025

End:      Sunday, May 11, 2025  (Sunday closure will be as needed until work is complete.)

Building(s) or Area(s) Affected:  Knight Campus 1, Millrace Garage, and 1600 Millrace. (Riverfront Parkway between Millrace Drive and Franklin Boulevard)

Scope:  All lanes of Riverfront Parkway will be closed to remove a tower crane.

Services Impacted:  Both lanes will be closed, but the east sidewalk will remain open for pedestrian traffic. See the image below for detour routes.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of work area and detour for the Riverfront Parkway Closure 5/10/25 and 5/11/25

5/12/25 – 5/23/25 Knight Law Center and Bean Hall Sidewalks Repair Work Advisory
Posted on

Begin:  Monday, May 12, 2025, at 7:00 am

End:      Friday, May 23, 2025, at 5:00 pm

Building(s) or Area(s) Affected:  Exterior Sidewalks by Knight Law Center and Bean Hall

Scope:  Two sections of sidewalk are going to be repaired by Delta Sand & Gravel Co. on the north side of E. 15th Avenue on the SW corner of Bean Hall and on the south side of E. 15th Avenue on the north side of Knight Law.

Services Impacted:  Only one location will be completed at a time to keep egress to campus open on the alternate side. (See pics below)

Work Performed By:  Delta Sand & Gravel Co.

ContactGabe Hein, CPFM Maintenance Support Supervisor, 541-346-7563 or 541-914-8862

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of sidewalk section that will be worked on north of the Knight Law Center 5/12/25 - 5/23/25Overhead aerial view of the section of sidewalk that will be repaired south of Bean Hall 5/12/25 - 5/23/25