UPDATE #2 10/30/25:
Tomorrow, Friday, October 31st, Air Inc. will be balancing the HVAC system for both the 1st and 2nd floors. They will be in each room at least twice and potentially up to four times.
– Also, the completion date has been extended to Friday, November 21st.
UPDATE #1 10/30/25:
The contractor just informed us that he will be cutting some metal tabs in the wall upstairs. It is expected to be very loud. Depending on the type of metal they are made of will determine how long the noise will last, potentially up to 30 minutes.
UPDATE 10/24/25:
UO Network Services has installed one of the new wireless access points outside of room 104 but will get the remaining two in next week, between Monday, 10/27/25 and Thursday, 10/30/25.
UPDATE 10/20/25:
UO Network Services will be installing three (3) new wireless hubs on the first floor outside of rooms 104 and 120 as well as in the main lobby near the reception desk.
- Workers will not be in the area the entire duration.
- The dates and times given are a window when Network Services could be performing work.
- There may be some noise and passageways could be blocked.
UPDATE 10/14:
The contractor will begin cutting into the roof for the two new skylights. Loud noise can be expected for roughly an hour and half. They are planning to start by 10:30 am.
UPDATE 10/01:
Steam / chilled water lines will be replaced in rooms 210A, 210, and 212.
There should be no impact to the heating / cooling in the rest of the building.
There will be construction noise associated with the pipe replacement and increased foot traffic in the building.
Work will be done by Harvey & Price and Preferred Construction.
UPDATE 9/15:
The contractor just notified us that they will begin staging today near the south side of the building, by the picnic table. It is also expected that the construction noise levels will begin to elevate in the building, potentially this afternoon.
UPDATE 9/04:
Abatement work will begin on Tuesday, September 9th at 8:30 am and will end on Friday, September 12th at 3:30 pm.
Work will be performed by Asbestos Abatement Contracting, LLC.
UPDATE 8/29:
BELCO Electric will begin removing electrical and conduit this afternoon 8/29/25. The abatement work has been postponed and will now begin Monday, September 8, 2025 at 8:00 am.
UPDATE 8/26:
Campus Planning is relocating to Rainier during the renovation of their space on the 2nd floor of Building #136. Moving will occur Thursday, August 28th from 8:00 am to 12:00 noon. Please expect increased activity at both sets of stairs in the Quonset.
Begin: Tuesday, September 2, 2025, at 7:00 am
End: October 31 Friday, November 21, 2025, at 5:00 pm
Building(s) or Area(s) Affected: CPFM Administration Quonset
Scope: Campus Planning’s space on the 2nd floor of Building #136 is being remodeled. We are building two offices on the east side of room 212. Two new skylights will be installed in the new offices.
Services Impacted: Construction noise is to be anticipated throughout the building for the duration of the project.
Work Performed By: Preferred Construction
Contact: Renee Benoit, CPFM Owner’s Representative, 541-346-5080