12/02/25 – 01/02/26 Streisinger Hall Room 276 Construction Work Advisory
Posted on

UPDATE 12/05/25:

  • Wednesday, December 10, 2025 – Saw cutting of epoxy top, noise can be expected starting at 8:00 am and ending no later than 1:00 pm
  • Thursday, December 11, 2025 – Core drilling of concrete, starting at 6:00 am and ending no later than 1:00 pm

Begin:  Tuesday, December 2, 2025, at 7:00 am

End:      Friday, January 2, 2026, at 4:00 pm

Building(s) or Area(s) Affected:  Streisinger Hall room 276

Scope:  The lab’s casework will be reconfigured in room 276.  This includes moving a sink and modifying existing casework. Demo, new finishes, plumbing and electrical will also be involved. The plumbing scope will require core drilling and a one-day plumbing shutdown that effects Streisinger Hall rooms 276, 275, 255, and 265. A separate notification will go out for the core drilling and plumbing shutdown once those are scheduled.

Services Impacted:

  • Users can expect to see contractors working in room 276 and mechanical room 190.
  • There will be periodic noise and vibrations as work continues.
  • The core drilling and plumbing shutdown will be scheduled and a separate shutdown update will be sent out for this work.

Work Performed By:  Store & Stock LLC and Brothers Plumbing

ContactGlen Macdonald, CPFM Owner’s Representative, 541-346-8201

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Streisinger Hall room 276

7/23/24 Streisinger Hall Domestic and Industrial Water Shutdown
Posted on

UPDATE:
Domestic and industrial water have been restored to the building.

 

Begin:  Tuesday, July 23, 2024, at 7:00 am

End:      Tuesday, July 23, 2024, at 3:00 pm

Building(s) or Area(s) Affected:  Streisinger Hall

Scope:  Due to a leak on the 1st floor 3″ domestic water line, the entire building will need to be shut down to fix this leak.

Services Impacted:  All water in the building will be offline:  domestic hot and cold water, industrial hot and cold water, auto claves, cage washers, restrooms, drinking fountains, and anything else that is connected to the domestic cold and hot water lines.

Special Instructions:  Please use the facilities in nearby buildings.

Work Performed By:  CPFM Facilities Plumbing Shop, BAS Shop, and Mechanical Shop

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Streisinger Hall

Columbia Hall Domestic Cold and Hot Water Shutdown POSTPONED
Posted on

UPDATE 2/3/22: Due to a staff  shortage this shutdown has been delayed. An update will be sent out when it has been rescheduled.

BeginThursday, February 3rd, 2022 at 8:30 am Unknown

End:      Thursday, February 3rd, 2022 at 12:00 noon Unknown

Building(s) or Area(s) Impacted:  Columbia Hall

Scope:  In order to make a valve repair on the domestic cold water system, the domestic cold and hot water will be shut down.

Services Impacted:  All restroom sinks, toilets, urinals will be affected. This includes all the cold water and hot water to lab faucets, drinking fountains, fume hoods, and the safety eyewashes/showers.

Work Performed By:  CPFM FS Plumbing Shop

ContactOlin Vermillion, CPFM Facilities Plumbing, 541-346-2319

Pacific Hall Emergency Water Shutdown 1/6/21
Posted on

UPDATE:

The broken water line has been repaired and the water has been restored.

 

Begin:  Wednesday, January 6th, 2021 effective at 10:00 am

End:      Wednesday, January 6th, 2021 till approximately 12:00 noon

Building(s) or Area(s) Impacted:  Pacific Hall

Scope:  EMERGENCY water shutdown due to a broken water line.  Expected to take approximately 2 hours to repair.

Services Impacted:  All water will be shut down in the building, including restrooms, sinks, and drinking fountains.

Work Performed By:  CPFM Facilities

ContactKen Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

 

Huestis Hall Lab Cold Water Shutdown 12/10/20
Posted on

Begin:  Thursday, December 10th, 2020 at 8:00 am

End:      Thursday, December 10th, 2020 at 12:00 noon

Building(s) or Area(s) Impacted:  Huestis Hall

Scope:  Installation of a new valve for the lab cold water.

Services Impacted:  This shutdown will affect all lab sink faucets, ice makers, and the cold water for fume hoods.

Work Performed By:  CPFM Facilities Plumbing Shop

ContactOlin Vermillion, CPFM Facilities Plumbing, 541-346-2319