9/19/22 Campus Air Quality
Posted on

Begin:  Monday, September 19th, 2022 – effective immediately

End:      unknown

Building(s) or Area(s) Affected:  Campus Buildings

Scope:  Most of the HVAC systems have switched into smoke mode due to the current air quality, however, due to a glitch in the system, not all made the adjustment.  Crews are working on it and expect the rest of the buildings to make the switch momentarily

Services Impacted:  Air quality

Work Performed By:  CPFM BAS and Siemens

ContactWork Control Center, Campus Planning and Facilities Management, 346-2319

To view current construction and impacts, visit UO Map.

9/19/22 – 9/23/22 Knight Library Door Work Access Advisory
Posted on

Begin:  Monday, September 19th, 2022

End:      Friday, September 23rd, 2022

Building(s) or Area(s) Affected:  Knight Library

Scope:  The historic door pulls on the main NE and NW entrance to Knight Library will be removed and replaced with modern door pulls as a temporary means.  The historic pulls are being sent to the door manufacturer who is building historic replicas.  These historic replicas will be installed later this year.

Services Impacted:  Workers will be in the area putting in the temporary replacements.

Work Performed By:  Preferred Construction and UO CPFM Facilities Lock, Door, and Access Shop

ContactBruce Budzik, CPFM Small Projects & Cap Imp Manager, 541-346-8834

To view current construction and impacts. visit UO Map.

9/17/22 – 9/18/22 Thompson’s University Center Window Washing Advisory
Posted on

Begin:  Saturday, September 17th, 2022

End:      Sunday, September 18th, 2022

Building(s) or Area(s) Affected:  Thompson’s University Center

Scope:  The exterior windows will be washed.

Services Impacted:  Expect temporary sidewalk access closures as they move around the exterior of the building.

Special Instructions:  Please close all exterior windows.

Work Performed By:  Custom Window Cleaning

ContactMelinda Seeley, CPFM Campus Planning, Real Estate Property Specialist, 541-346-5550

To view current construction and impacts, visit UO Map.

9/16/22 Huestis and Willamette Steam Shutdown
Posted on

Begin:  Friday, September 16th, 2022 at 7:30 am

End:     Friday, September 16th, 2022 at 10:30 am

Building(s) or Area(s) Impacted:  Huestis and Willamette

Scope:  As part of the Huestis Renovation project, the steam relief ventilation will be shut down in Willamette Hall in order to isolate Huestis steam from Willamette.  CPFM Utilities & Energy will conduct the shutdown to accommodate isolation work by JH Kelly.

Services Impacted:  This will turn off all building heat and hot water in Willamette for three (3) hours.

Work Performed By:  JH Kelly and CPFM Utilities & Energy

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts, visit UO Map

9/14/22 Campus Emergency Autoclave Steam Shutdown
Posted on

UPDATE:
S-2 has completed the repairs and the utility staff is slowly bringing steam up to pressure.
It is expected to be fully pressurized within the next 2 hours.

 

Begin:  Wednesday, September 14th, 2022 – effective immediately

End:      Unknown Wednesday, September 14th, 2022

Building(s) or Area(s) Affected:  Campus

Scope:  The Utilities and Energy is currently investigating a major steam leak found in the tunnel under Franklin Blvd.  We believe the leak is coming from the clean steam line (Autoclave) and have shut off the Autoclave so we can investigate.  Currently we do not have an estimate of time when steam will be restored.

Services Impacted:  Autoclave steam will be offline until the repair can be made.

Work Performed By:  S2 Industrial and CPFM Utilities & Energy

ContactPaul Langley, CPFM Interim Co-Dir Utilities & Energy, 541-346-5387

To view current construction and impacts, visit UO Map.

9/14/22 Planned Power Outage
Posted on

UPDATE:
Utilities & Energy has switched from island mode back to the normal power configuration as planned.
Please report any issues caused by the outage, including IT, to the CPFM Work Control Center at 541-346-2319,  workcontrolcenter@uoregon.edu, or by entering a service request on the UO call log https://cgis.uoregon.edu/Calllog.
Thank you.

 

 

We are writing to remind you of the upcoming annual planned power outage on Wednesday, September 14th, 2022.

In the event our campus service from the local EWEB electrical grid is interrupted, the UO Utility and Energy plant is capable of providing the campus with electricity (called Island Mode). To best ensure this system operates as designed when needed, the Utility and Energy plant now exercises this system annually. This year’s Island Mode event will take place on Wednesday, September 14, 2022, at 7:35 am. 

At 7:35 am, the entire campus will shift from the primary EWEB power source to the backup generator system at the Central Power Station, also known as “Island Mode”.

While not anticipated, some buildings may briefly lose power when the switch occurs, if a portion of the system does not perform as expected.

At 7:45 am, Feeder 1 will be de-energized.  Affected buildings will experience a  power outage lasting approximately 1 hour.  During this time Utilities and Energy staff will be disconnecting power in a vault for a switch replacement project and exchanging the feeder breaker. Crews will then ensure systems are successfully coming back online.

At 9:00 am, Feeder 10 will be de-energized.  Affected buildings will experience a power outage lasting 15 minutes. During this time Utilities and Energy staff will be exchanging the feeder breaker.  Crews will then ensure systems are successfully coming back online.

At 10:00 am, Standby feeder 2 will be de-energized. This will have no affect to the campus buildings.

At 12:00 noon, Utilities and Energy will Initiate normal power configuration.

For a detailed schedule of feeders and maps of buildings affected, visit the 2022 Power Outage webpage. Updates about the project will be posted on that page and Around the O.

Individuals who wish to request planning assistance for the outages should contact Campus Planning and Facilities Management Work Control at workcontrolcenter@uoregon.edu or 541-346-2319.

Please remember to shut down all multi-function copier devices as well as any printers. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

To view current construction and impacts. visit UO Map.

9/14/22 Lokey Labs Electrical Shutdown
Posted on

Begin:  Wednesday, September 14th, 2022 at 6:00 am

End:      Wednesday, September 14th, 2022 at 7:00 am

Building and Area:  Lokey Labs

Scope: As part of the Huestis Renovation Project, there will be a brief shutdown of electrical panel 2N2 and 2N2A

Services Impacted:  This electrical outage will affect the chilled water, compressed air, power, exhaust, fume hoods, and HVAC air supply.

Special Instructions:  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Additional Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  Lease Crutcher Lewis and EC

Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

9/13/22 Willamette Hall and Huestis Steam/Condensate plus Supply/Exhaust Air Shutdown
Posted on

Begin:  Tuesday, September 13th, 2022 at 7:30 am

End:      Tuesday, September 13th, 2022 at 11:30 am

Building(s) or Area(s) Affected:  Willamette Mechanical Room 50 and Huestis Basement

Scope:  As part of the Huestis Renovation project, steam and condensate plus supply and exhaust air will be shut down.

Services Impacted:  The following equipment will be affected and unavailable during this time: Willamette Hall AHU-2, Huestis Hall AHU-1&2, HX-1 and steam sterilizers.

Work Performed By:  Lease Crutcher Lewis and JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

9/12/22 – 9/14/22 Streisinger Hall Conduit Installation Advisory
Posted on

Begin:  Monday, September 12th, 2022 at 7:30 am

End:      Wednesday, September 14th, 2022 at 5:00 pm

Building(s) or Area(s) Affected:  Streisinger Hall

Scope:  An electrical contractor will begin installing new fire alarm conduits within the Streisinger electrical rooms.

Services Impacted:

  • Be advised some minimal roto hammering noise will be generated at the beginning of the work, anticipated to last 30 minutes.
  • Besides contractors being in the area, no other effects are anticipated.

Special Instructions:

Work Performed By:  EC Electric

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.

9/06/22 Science Buildings Emergency RO/DI Water Shutdown
Posted on

UPDATE:
The RO/DI water has been restored to all the buildings except Pacific and Onyx Bridge.  They are expected to be back online around the prior planned shutdown time of 2:00 pm.

 

Begin:  Tuesday, September 6th, 2022 – effective immediately

End:      Unknown

Building(s) or Area(s) Affected:  Klamath, Willamette, Streisinger, LISB, Onyx Bridge, Pacific, Lokey Labs

Scope:  We are currently experiencing issues with the RO/DI water pumps.  Crews are working on them and hope to have them back up as soon as possible.  We will send out an update when they have been repaired.

Services Impacted:  RO/DI water will be offline during this time.

Work Performed By:  CPFM FS Plumbing Dept.

ContactOlin Vermillion, CPFM Facilities Services Plumbing, 458-221-2910.

To view current construction and impacts, visit UO Map.

9/06/22 – 12/9/22 Knight Library Roofing Project Advisory
Posted on

UPDATE 12/2/22:

This work is not yet complete, work will continue through next week with a projected completion date of 12/9/22

UPDATE 11/14/22:
Roofing on Knight Library should be complete by week of 11/28 based on favorable weather projections.  Construction fencing will be removed once roofing is complete and bike/pedestrian access will be restored at that time.

Thank you for your patience during this challenging project.

UPDATE 10/26/22:
Due to weather delays and unforeseen conditions, the completion date has been extended until November 30th.

 

Begin:  Tuesday, September 6th, 2022 at 6:30 am

End:      Friday, October 28th, 2022 Wednesday, November 30th Monday, November 28th, 2022 at 5:00 pm Friday, December 9th, 2022

Building(s) or Area(s) Affected:  Knight Library plus west side of Gerlinger Annex alley way between Knight Library and Cemetery.

Scope:  Roofing replacement work has begun on the middle and south sections of the building.

Services Impacted:

  • There may be some dust and odors from this work outside the building.
  • The East side of the building is closed to bikes and pedestrians.  Signs are posted to direct pedestrian and bike traffic around the North and West sides of the building.
  • Building occupants can expect to hear construction noises associated with this work which are: crane engine, banging and bumps on the 4th floor.

Work Performed By:  Preferred Construction and Umpqua Roofing

ContactBruce Budzik, CPFM Small Projects & Cap Imp Manager, 541-346-8834

To view current construction and impacts. visit UO Map.

9/06/22 – 9/08/22 McKenzie Hall Rooms 125, 129, and 229 HVAC Shutdown
Posted on

Begin:  Tuesday, September 6th, 2022 at 7:00 am

End:      Thursday, September 8th, 2022 at 5:00 pm

Building(s) or Area(s) Affected:  McKenzie Hall

Scope:  Heating water and chilled piping to MZ-2 will be cut and rerouted to provide pathway for new ductwork routing as part of the ductwork repair project.

Services Impacted:  The air handling unit will continue to operate to provide ventilation but will not have heating or cooling in classrooms 125, 129, and 229.  This will not affect the rest of the building.

Work Performed By:  Harvey and Price

ContactKevin Waldrop, CPFM Facilities Engineer, 541-346-2315

To view current construction and impacts. visit UO Map.

 

9/06/22 – 9/07/22 Student Rec Center SE Patio Construction and Noise Advisory
Posted on

Begin:  Tuesday, September 6th, 2022

End:      Wednesday, September 7th, 2022

Building(s) or Area(s) Affected:  Student Rec Center

Scope: Exterior repairs take place on the southeast corner of the covered patio area, on the east side of the building.

Services Impacted:

  • Advisory only – no impacts to the use of the building or fields is expected.
  • Some intermittent noise from light construction activities will be heard (hammering, drilling, cutting).

Work Performed By:  Contractor

ContactJustin Grishkin, CPFM Construction Services Manager, 541-346-5242

To view current construction and impacts, visit UO Map.

9/06/22 LISB, Klamath, Lokey Labs, and Huestis Hall Yearly Vacuum Pump Preventative Maintenance
Posted on

Begin:  Tuesday, September 6th, 2022 at 7:00 am

End:      Tuesday, September 6th, 2022 at 4:00 pm

Buildings Affected:    LISB, Klamath, Lokey Labs, and Huestis Hall

Scope:   The lab vacuums will be shut down to allow a contractor to perform the yearly preventive maintenance on the vacuum pumps. It is necessary to take the vacuum systems offline while the contractor is servicing the pumps.

Services Impacted:  This will affect all rooms and equipment connected to the building vacuum systems in LISB, Klamath, Lokey Labs, and Huestis.

Work Performed By:  Roger’s Machinery

ContactKyle Harshbarger, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

To view current construction and impacts. visit UO Map.

9/06/22 Zebrafish International Resource Center Heating Water Shutdown
Posted on

Begin:  Tuesday, September 6th, 2022 at 7:00 am

End:      Tuesday, September 6th, 2022 at 11:00 am

Building(s) or Area(s) Affected:  Zebrafish International Resource Center

Scope:  The heating water will be shut down to change out a gasket on the heating water system.

Services Impacted:  Heating water will be offline for 4 hours.

Work Performed By:  CPFM FS Mechanical Dept.

ContactSean Woods, CPFM Facilities Mechanical, 541-206-9845

To view current construction and impacts, visit UO Map.

9/06/22 Pacific Hall and Onyx Bridge RO Water Shutdown
Posted on

Begin:  Tuesday, September 6th, 2022 at 8:00 am

End:      Tuesday, September 6th, 2022 at 2:00 pm

Building(s) or Area(s) Affected:  Pacific and Onyx Bridge

Scope:  The RO water will be shut down to install new check valves.

Services Impacted:  RO water will be offline during this time.

Work Performed By:  CPFM FS Plumbing Dept.

ContactOlin Vermillion, CPFM Facilities Services Plumbing, 458-221-2910.

9/01/22 – 9/08/22 510 Oak HVAC Work Advisory
Posted on

Begin:  Thursday, September 1st, 2022

End:      Thursday, September 8th, 2022

Building(s) or Area(s) Affected:  510 Oak

Scope:  Technicians will be servicing the AC units in this building.

Services Impacted:

  • Systems will be up and running, except for short, individual shut downs (usually under 20 min a room/system.)  Not all rooms may be impacted.
  • Technicians will be in and out of office, storage and common spaces intermittently throughout the week.

Work Performed By:  CPFM Facilities Mechanical Crew

ContactPiper Fahrney, CPFM FS Mechanical Shop, 541-346-2319

To view current construction and impacts, visit UO Map.

9/01/22 – 9/02/22 Allen Hall Elevator Shutdown
Posted on

Begin:  Thursday, September 1st, 2022

End:      Friday, September 2nd, 2022

Building(s) or Area(s) Affected:  Allen Hall

Scope:  The elevator will be shut down for the State required 5-year full load test.  A notice will be sent when the elevator is back online.

Services Impacted:  The elevator will be offline during this time.

Work Performed By:  Otis Elevator

ContactRob Berg, CPFM Facilities Electrical Supervisor, 541-346-2313

To view current construction and impacts, visit UO Map.

8/31/22 McKenzie Hall Suite 275 Entrance Access Advisory
Posted on

Begin:  Wednesday, August 31st, 2022 at 8:00 am

End:      Wednesday, August 31st, 2022 at 3:00 pm

Building(s) or Area(s) Affected:  McKenzie Hall, Suite 275

Scope:  A subcontractor for Facilities Services will be replacing interior glass panels at the entrance to suite 275.  Access into the suite through the main entrance may be limited at the time of glass replacement.

Services Impacted:  Little to no other impacts to building users are expected.

Work Performed By:  Culver Glass

ContactJustin Grishkin, CPFM Construction Services Manager, 541-346-5242

To view current construction and impacts, visit UO Map.

8/29/22 – 8/30/22 – Baker Downtown Center Passenger Elevator Offline
Posted on

UPDATE:
The elevator has been repaired and is operational

 

Begin:  Monday, August 29th, 2022

End:       Tuesday, August 30th, 2022

Building(s) or Area(s) Affected:  Baker Passenger Elevator

Scope:  The passenger elevator has been shut down for repairs.  Hoping to have the parts available tomorrow.

Services Impacted:  The elevator will be offline during this time.

Work Performed By:  Otis Elevator

ContactRob Berg, CPFM Facilities Electrical Supervisor, 541-346-2313

To view current construction and impacts, visit UO Map.

8/29/22 – 8/30/22 Lillis East Elevator Offline
Posted on

UPDATE:
The elevator has been repaired and is operational

 

Begin:  Monday, August 29th, 2022

End:      Tuesday, August 30th, 2022

Building(s) or Area(s) Affected:  Lillis East Elevator

Scope:  The east elevator will be down for the evening.  Repairs will be made in the morning.

Services Impacted:  The east elevator will be unavailable.

Special Instructions:  Please use the other elevators located in the atrium or next to Peterson.

Work Performed By:  Otis Elevator

ContactRob Berg, CPFM Facilities Electrical Supervisor, 541-346-2313

To view current construction and impacts, visit UO Map.

8/29/22 CPFM Warehouse Design & Construction Door Repair Advisory
Posted on

Begin:  Monday, August 29th, 2022

End:      Monday, August 29th, 2022

Building(s) or Area(s) Affected:  CPFM Warehouse/Shops

Scope:  Facilities will be repairing the south entry double doors to the CPFM D&C Offices stairway, shown by the red X, which will render them inoperable throughout the day.  Alternate entry points are shown in green (see pic below).

Services Impacted:

  • The south stairway entrance to D&C will be closed but the SW stairway entrance will be open.
  • There will be some general construction noise (grinding, mainly) along with some sealant work to follow, so some unfamiliar odors may be present as well.

Special Instructions:  For those who bike in, or require use of the elevator, the southwest entry will be your closest entry point to the interior racks/elevator.

Work Performed By:  CPFM Facilities Crews

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.

8/26/22 – 8/28/22 Parking Lot Summer Painting Closure Advisory
Posted on

Date:  Friday evening, August 26th, 2022 through Sunday, August 28th, 2022

Scope:  Summer parking lot maintenance will be performed on the weekend.

Services Impacted:

  • The lots will be closed the preceding Friday night for both Saturday and Sunday work.
  • The lots will be re-opened as soon as the paint is dry.

Parking Lot Schedule:

Saturday, August 27th, 2022

  • #33 (East of Bean)
  • #34B (N of Viv Olum Child Center)
  • #34C (E of Many Nations Longhouse/Viv Olum/Oregon Law Clinic)
  • #37 (W of Ford Alumni Center)
  • #39 (South of Agate Hall and Agate House)
  • #43 (South of Knight Law Center)
  • #44 (East Campus Graduate Village)
  • #51 (Moss Street Alley between 15th and 17th)
  • #55 (Moss Street between 15th and 17th)
  • 13th Ave Garage
  • Central Kitchen

Sunday, August 28th, 2022

  • #16A (NW of PLC)
  • #16B (West of Condon)
  • #17 (West of HEDCO)
  • #18 (West of Clinical Services)
  • #20 (NE of Beall Hall)
  • #42 (West of Computing Center)
  • #58 (Next to 1715 Franklin)
  • #59 (Romania Parking Lot)
  • Motor Pool (Franklin Blvd.)
  • 510 Oak Street
  • EC Cares (1500 W. 12th Ave.)
  • Unthank Alley

Work Performed By:  Transportation Services

ContactJames McGladrey, UO Transportation Services Field Operations Manager, 541-346-2676

https://map.uoregon.edu/transportation-uo

https://transportation.uoregon.edu/

8/25/22 Huestis Hall Fire Sprinkler System Shutdown
Posted on

Begin:  Thursday, August 25th, 2022 at 7:00 am

End:      Thursday, August 25th, 2022 at 2:00 pm

Building(s) or Area(s) Affected:  Huestis Hall Basement

Scope:  As part of the Huestis Renovation project, the fire sprinkler system will be shut down in the Huestis Basement for demo and rerouting of fire sprinkler lines. Active fire watch will be conducted by Lewis.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Lewis and Harvey and Price

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

8/24/22 – 8/25/22 Streisinger Hall and Lokey Labs Steam/Heating Water Shutdown
Posted on

Begin:  Wednesday, August 24th, 2022 at 2:00 pm

End:      Thursday, August 25th, 2022 at 4:00 pm

Building(s) or Area(s) Affected:  Streisinger Hall, Lokey Labs

Scope:  Due to failed and leaking condensate return pumps, the building steam will be shutdown.

Services Impacted:  This will affect the steam and heating water in Streisinger plus the heating water to Lokey Labs fed through the Streisinger mechanical room.

Work Performed By:  CPFM Utilities & Energy

ContactKyle Wilson, CPFM Utilities Maintenance Manager, 541-346-2246

To view current construction and impacts, visit UO Map.