8/26/24 HEDCO Parking Garage Vac Truck Advisory
Posted on

Begin:  Monday, August 26, 2024, at 6:00 am

End:      Monday, August 26, 2024, at approximately 8:30 am

Building(s) or Area(s) Affected:  HEDCO Parking Garage

Scope:  We have a Vac truck coming on the morning of August 26th to clean out an oil water separator tank so we can access and do maintenance on some pumps.

Services Impacted:

  • Parking stalls 1-13 will be coned off and caution tape installed Friday evening (see highlighted area in the diagram below).
  • Monday at 6:00 am the truck will roll out hose and clean out the tank.
  • The stalls will be available to use by 8:30 am after the truck leaves.

Work Performed By: Mid-State Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of HEDCO parking garage work diagram for 8/26/24

9/04/24 Friendly Hall Onsite Assessment Advisory
Posted on

Begin:  Wednesday, September 4, 2024, at 10:00 am

End:      Wednesday, September 4, 2024, at 5:00 pm

Building(s) or Area(s) Affected:  Friendly Hall

Scope:  TVA Architects and design sub-consultants will be conducting an onsite assessment of the existing conditions of Friendly Hall.

Services Impacted:

  • This involves physical measurements of spaces, documenting materials, and visual inspections of the interior and exterior conditions.
  • Expect about 20 individuals onsite during this time.

Work Performed By:  TVA Architects

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.