3/05/24 Romania Warehouse Domestic Water Shutdown

Begin:  Tuesday, March 5, 2024, at 11:00 am

End:      Tuesday, March 5, 2024, at 1:00 pm

Building(s) or Area(s) Affected:  Romania Warehouse

Scope:  The domestic water will be shut down while a new water meter is installed.

Services Impacted:  Restrooms, sinks, and drinking fountains will be offline during this time.

Work Performed By:  EWEB

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Romania Warehouse

3/27/24 Hamilton Hall Steam Heat Shutdown

Begin:  Wednesday, March 27, 2024, at 10:00 am

End:      Wednesday, March 27, 2024, at 2:00 pm

Building(s) or Area(s) Affected:  Hamilton Hall

Scope:  Due to a leaking steam valve in the utility tunnel, building heat and hot water will be shut down to replace the valve.

Services Impacted:

  • Building heat and hot water will be offline during this time.
  • This work is scheduled during spring break to limit impact to building users.
  • Work will take place in the utility tunnel.

Work Performed By:  CPFM Utilities & Energy

ContactContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Hamilton Hall Complex

3/11/24 – 3/14/24 Oregon Hall Chilled Water Shutdown

Begin:  Monday, March 11, 2024, at 12:00 noon

End:      Thursday, March 14, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Oregon Hall

Scope:  Due to the installation of a new chilled water meter, the building air conditioning will be shut down.

Services Impacted:

  • This will affect the Oregon Hall Main Building Only.
  • This shutdown will NOT affect the Oregon Hall Data Center!
  • This work is planned during winter weather and will have little to no impact on building users.
  • Work will take place in the utility tunnel.

Work Performed By:  S2 Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Oregon Hall

2/29/24 Susan Campbell Hall Emergency Steam Shutdown

Begin:  Thursday, February 29, 2024 at 8:00 am

End:      Thursday, February 29, 2024 at 12:00 noon

Building(s) or Area(s) Affected:  Susan Campbell Hall

Scope:  Steam will be shutdown to repair and upgrade radiator control knobs in rooms 211 and 211B

Services Impacted:  Heat to the entire building will be down for the duration of the repair.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Susan Campbell Hall on map

2/26/24 – 4/04/24 Klamath Hall Rooftop Vacuum Pump Emergency Shutdown

UPDATE 4/01/24:
The contractor received the part today for the rooftop vacuum pump repair.
This work is scheduled for Thursday, April 4th, from 8:00 am – 4:00 pm.

 

UPDATE 2/29/24:
Due to a failed valve, the vacuum pump will be down longer than expected.  Because parts are no longer available for this system, a contractor is researching a solution.  An update will be sent at a later date.

 

Begin:  Monday, February 26, 2024 – effective immediately

End:      Unknown    Thursday, April 4, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  Klamath Hall

Scope:  The rooftop vacuum pump has been shut down for an emergency repair and is expected to be down for a couple of days.  An update will be sent when it has been restored to service.

Services Impacted:  The vacuum pumps on the 2nd floor will be affected, but it is unknown exactly which ones.

Work Performed By:  CPFM Facilities and a contractor

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

klamath hall on map

2/28/24 – 3/01/24 Klamath Hall and Zebrafish International Resource Center Clean Steam Shutdown

Begin:  Wednesday, February 28, 2024, at 8:00 am

End:      Friday, March 1, 2024, at 8:00 am

Building(s) or Area(s) Affected:  Klamath Hall and Zebrafish International Resource Center

Scope:  Due to a steam leak from the tunnel untreated “clean” steam pipeline, the pipeline will be shut down for emergency repairs.

Services Impacted:

  • This will affect the “clean” steam only.
  • This outage will not affect normal steam or building heating.
  • Work will take place in the utility tunnel.

Work Performed By:  Hydro-Temp Mechanical

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Klamath and ZIRC

3/04/24 – 3/07/24 Oregon Hall Data Center Chilled Water Shutdown

Begin:  Monday, March 4, 2024, at 12:00 noon

End:      Thursday, March 7, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Oregon Hall Data Center

Scope:  Due to the installation of a new chilled water flow meter, campus chilled water will be shut down to the Oregon Hall Data Center only.

Services Impacted:

  • The Data Center cooling will be provided by the backup roof top chiller.
  • Work will take place in the utility tunnel.

Work Performed By:  S2 Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Oregon Hall

2/22/24 – 2/26/24 Tykeson Hall Room 151 Glass Wall Offline

UPDATE:
The glass wall has been repaired and can be used again.  Please remember to contact Work Control Center two weeks in advance (or 72 hours at the very minimum) to schedule the opening and closing of this wall.

 

Begin:  Thursday, February 22, 2024 – effective immediately

End:      Unknown   Monday, February 26, 2024

Building(s) or Area(s) Affected:  Tykeson Hall Room 151 (James Common Room)

Scope:  The glass wall partition is currently inoperable and awaiting repairs.  An update will be sent when work is complete.

Services Impacted:  The glass wall will not be able to close off the room until it has been repaired.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Tykeson Hall's James Common Room 151

2/28/24 – 4/12/24 Thompson University Center Cellular Equipment Upgrade Advisory

Begin:  Wednesday, February 28, 2024, at 11:00 am

End:      Friday, April 12, 2024, at 5:00 pm

Building(s) or Area(s) Affected:  Thompson’s University Center

Scope:  A contractor will be upgrading equipment for Verizon, including all antennas on the roof and equipment in the attic.

Services Impacted:  Work will take place in Mechanical Room #309, in stairwell S301 access hatch, and on the roof.

Work Performed By:  North Ridge Wireless on behalf of Verizon

ContactMelinda Seeley, CPFM Campus Planning Real Estate Prop Specialist, 541-346-5550

Current construction and impacts information can be found on the UO Maps site.

Image of Thompson University Center

2/28/24 – 3/01/24 Onyx Bridge Rooms 361 and 362 Containment and Noise Advisory

Begin:  Wednesday, February 28, 2024, at 8:00 am

End:      Friday, March 1, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  Onyx Bridge Rooms 361 and 362

Scope:  Contractor will perform abatement services to remove Asbestos containing material from Onyx Bridge room 361 and 362.

Services Impacted:

  • Containment will be enclosed to those two rooms only, but containment access will take up to 4′ into the hall wall.
  • Passage is still provided.

Work Performed By:  Rose City Contracting

ContactWaymon Banks, CPFM Owner’s Representative, 541-346-0196

Current construction and impacts information can be found on the UO Maps site.

Image of Onyx Bridge 361 and 362

2/28/24 Baker Downtown Center Steam Shutdown

UPDATE:
Due to unforeseen circumstance, this work will continue through Thursday, February 29th.

 

Begin:  Wednesday, February 28, 2024, at 7:00 am

End:      February 28, Thursday, February 29, 2024, at 3:30 pm

Building(s) or Area(s) Affected:  Baker Downtown Center

Scope:  The steam will be shut down to replace the steam valves suppling the heat exchanger.

Services Impacted:  Heat will be offline during this time.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Baker Downtown Center

2/22/24 – 2/23/24 Miller Theatre West Exterior Stair Pressure Washing Advisory

Begin:  Thursday, February 22, 2024

End:      Friday, February 23, 2024

Building(s) or Area(s) Affected:  Miller Theatre

Scope:  The west exterior stairs will be pressure washed.

Services Impacted:  Noise can be expected and access will be limited during this time.

Special Instructions:  Please use an alternate entrance.

Work Performed By:  CPFM Facilities Crew

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Miller Theatre west exterior stairs

3/04/24 University Health Services Fire Alarm System Testing Advisory

Begin:  Monday, March 4, 2024, at 6:00 am

End:      Monday, March 4, 2024, at 9:00 am

Building(s) or Area(s) Affected:  University Health Services

Scope:  Due to a recent remodel in the University Health Center’s Training Center, the fire alarm system will be tested.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  IES

ContactDavid Mason, CPFM Owner’s Representative, 541-346-5679

Current construction and impacts information can be found on the UO Maps site.

Image of University Health Services

2/16/24 – Unknown – Klamath Hall Men’s Restroom V280 Heating Shutdown

Begin:  Friday, February 16, 2024 – effective immediately

End:      Unknown

Building(s) or Area(s) Affected:  Klamath Hall Men’s Restroom V280

Scope:  The heating system for the men’s restroom will be offline for approximately 3 weeks to make emergency repairs.   A notice will be sent when the heat has been restored.

Services Impacted:  Heat will be offline, in the restroom, during this time.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of the location of Klamath Hall Men's Restroom V280

2/23/24 Huestis Hall Sealant Application, Odor Advisory, and Exhaust Fan Shutdown

UPDATE:
The time has been extended an additional two hours, from 6:00 am to 11:00 am.

 

Begin:  Friday, February 23, 2024, at 6:00 am

End:      Friday, February 23, 2024, at 9:00 11:00 am

Building(s) or Area(s) Affected:  Huestis Hall, Willamette Hall, Lokey Labs

Scope:  Graffiti proof sealant will be applied to the exterior brick on Level 1/ground floor of Huestis Hall. The early morning hours were selected to decrease the amount of disruption to occupants during a typical work day. This notice is subject to rescheduling if weather conditions are unfavorable for installation.

Outage affecting Huestis basement: AHU 1 and 2 and lab exhaust fans will be offline during this work activity.

Advisory to Lokey Labs and Willamette Hall: Neighbors of Huestis Hall may experience odors due the sealant material.

Work Performed By:  Milne, Lease Crutcher Lewis

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Map showing Huestis Hall

2/15/24 – 2/26/24 Gerlinger Annex Emergency AHU-3 Shutdown

UPDATE:
AHU-3 has been repaired and is back in service.

 

Begin:  Thursday, February 15, 2024 – effective immediately

End:      Unknown   Monday, February 26, 2024

Building(s) or Area(s) Affected:  Gerlinger Annex

Scope:  The AHU-3 unit has been shut down for emergency repairs and is expected to be offline for approximately one week.

Services Impacted:  Building heat will be minimally affected during this time as the other AHU units are operational.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Gerlinger Annex

2/22/24 – 2/23/24 Huestis Hall Basement Sanitary Discharge Shutdown

Begin:  Thursday, February 22, 2024, at 6:00 pm

End:      Friday, February 23, 2024, at 3:00 pm

Building(s) or Area(s) Affected:  Huestis Hall basement

Scope:  Sanitary discharge in the Huestis Hall basement will be limited to allow work to be completed in the sanitary pit.

Services Impacted:

  • Restrooms and handwashing sinks in labs and the break room will not be available during this shutdown.
  • Contractor will provide overflow waste bins for lab water discharge at floor sinks and floor drains.

Special Instructions:  Please use restrooms in adjacent buildings.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

map of Huestis Hall

2/26/24 – 2/29/24 Anstett Hall, Chiles Hall, and Peterson Hall Chilled Water Shutdown

Begin:  Monday, February 26, 2024, at 12:00 noon

End:      Thursday, February 29, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Anstett Hall, Chiles Hall, Peterson Hall

Scope:  Due to the installation of a new chilled water flow meter, building cooling will be shut down.

Services Impacted:

  • This work is scheduled during winter weather conditions to have minimal impact to building users.
  • Work will take place in the utility tunnel.

Work Performed By:  S2 Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Chiles, Peterson, and Anstett

 

Gerlinger Annex Emergency AHU-1 Shutdown 2/13/24 – 2/14/24

Begin:  Tuesday, February 13, 2024 – effective immediately

End:      Wednesday, February 14, 2024 – approximately 1:00 pm

Building(s) or Area(s) Affected:  Gerlinger Annex

Scope:  Due to a leak from the AHU-1, the unit has been shut down to make emergency repairs.

Services Impacted:  Building heat will be offline during this time.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Gerlinger Annex

2/13/24 Onyx Bridge Rooms 361 and 362 Electrical and Plumbing Work Advisory

Begin:  Tuesday, February 13, 2024

End:      Tuesday, February 13, 2024

Building(s) or Area(s) Affected:  Onyx Bridge

Scope:  Facility Services will be performing electrical and plumbing work in Onyx Bridge 361 and 362.

Services Impacted:  Electrical and plumbing services will be affected in rooms 361 and 362. Expect noise in surrounding areas.

Work Performed By:  Facility Services

ContactWaymon Banks, CPFM Owner’s Representative, 541-346-0196

Current construction and impacts information can be found on the UO Maps site.

Overhead view of Onyx Bridge

2/08/24 – 3/06/24 CPFM Compound Increased Construction Traffic Advisory

UPDATE:
Due to delays in compacting and Geotech inspections, the end date has been moved to March 6th.

 

Begin:  Thursday, February 8, 2024

End:      February 16,  Wednesday, March 6, 2024

Building(s) or Area(s) Affected:  CPFM Compound

Scope:  Hoffman Construction will be staging backfill rock material west of CPS & the tank. See attached map.

Services Impacted:  There will be Hoffman truck traffic to and from the staging area during daytime and evening hours, for the duration.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Overhead map of CPFM

2/26/24 Willamette Hall First Floor Fire Alarm and Suppression System Shutdown

Begin:  Monday, February 26, 2024, at 7:00 am

End:      Monday, February 26, 2024, at 11:00 am

Building(s) or Area(s) Affected:  Willamette Hall First Floor

Scope:  Fire alarm and suppression system will be down for the first floor of Willamette Hall, to complete sprinkler head installation in the room 154. Contractor will provide fire watch.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Harvey & Price

ContactWaymon Banks, CPFM Owner’s Representative, 541-346-0196

Current construction and impacts information can be found on the UO Maps site.

Image of Willamette Hall

2/15/24 CPFM Warehouse and Shops Building #130 Seismic Upgrade Investigation

Begin:  Thursday, February 15, 2024, at 1:00 pm

End:      Thursday, February 15, 2024, at 2:30 pm

Building(s) or Area(s) Affected:  CPFM Warehouse and Shops Building #130

Scope:  Seismic upgrade project is in the schematic design phase and the design team will be doing some investigation on the building.

Services Impacted:  No services impacted. There might be some need to access occupied spaces.

Work Performed By:  Woofter and Bolch Architects

ContactRenee Benoit, CPFM Owner’s Representative, 541-346-5080

Current construction and impacts information can be found on the UO Maps site.

CPFM Warehouse on map

2/12/24 Huestis Hall and Lokey Labs Scaffolding Removal Advisory

Begin:  Monday, February 12, 2024, at 8:00 am

End:      Monday, February 12, 2024, at 10:00 am

Building(s) or Area(s) Affected:  Huestis Hall and Lokey Labs

Scope:  Scaffolding will be removed from the NE entry to Huestis Hall and Lokey Labs.

Services Impacted:  Contractor will be monitoring traffic and allow pedestrians to enter and exit. Pedestrian should be aware of potential delays.

Work Performed By:  Lease Crutcher Lewis

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall and Lokey Labs

2/5/24 – unknown LISB Room 134A Emergency Shower Shutdown

Begin:  Monday, February 5, 2024 effective immediately

End:      unknown

Building(s) or Area(s) Affected:  Lewis Integrated Science Building room 134A

Scope:  The shower in restroom 134A has been shutdown due to a leak affecting the lab space on the floor below.

Services Impacted:  The shower will be closed and unavailable until repairs can be made.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.