2/27/23 Huestis Basement Fire Sprinkler Shutdown
Posted on

Begin:  Monday, February 27, 2023, at 7:00 am

End:      Monday, February 27, 2023, at 3:00 pm

Building(s) or Area(s) Affected:  Huestis basement

Scope:  As part of the Huestis Hall renovation project, the fire sprinklers will be shutoff Monday February 27 to accommodate ongoing seismic upgrades in the south stairwell.  Fire watch will be conducted by the contractor.

Services Impacted:  The fire alarm system will be offline.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Work Performed By:  Harvey & Price

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

2/27/23 Lawrence Hall NW Corner Noise Advisory
Posted on

Begin:  Monday, February 27, 2023, at 7:00 am

End:      Monday, February 27, 2023, at 11:00 am

Building(s) or Area(s) Affected:  Lawrence Hall

Scope:  Due to the installation of a condensate tank vent, there will be minor noise on the NW corner of the building.

Services Impacted:  Noise may be heard during this time.

Work Performed By:  Hydro-Temp Mechanical

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

2/27/23 – 2/28/23 Millrace Millpond Sediment Sampling Advisory
Posted on

Begin:   Monday, February 27, 2023, at 7:00 am

End:      Tuesday, February 28, 2023, at 5:00 pm

Building(s) or Area(s) Affected:  Millrace Millpond

Scope:  As part of the Millrace Enhancement Project, PBS Consultants will be deploying a 20′ raft into the Millpond in order to collect sediment samples.

Services Impacted: This will affect the Millpond of the Millrace between 959 Franklin Blvd. and Onyx St.

Work Performed By:  PBS

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

2/27/23 – 3/01/23 HEDCO Chilled Water Shutdown
Posted on

Begin:  Monday, February 27, 2023, at 7:30 am

End:      Wednesday, March 1, 2023, at 3:00 pm

Building(s) or Area(s) Affected:  HEDCO

Scope:  Due to the installation of a new Chilled Water meter, the building air conditioning system will be shutdown.

Services Impacted:  Because of winter weather, this outage should have little to no impact on building users.

Work Performed By:  S2 Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.