8/29/22 – 8/30/22 – Baker Downtown Center Passenger Elevator Offline
Posted on

UPDATE:
The elevator has been repaired and is operational

 

Begin:  Monday, August 29th, 2022

End:       Tuesday, August 30th, 2022

Building(s) or Area(s) Affected:  Baker Passenger Elevator

Scope:  The passenger elevator has been shut down for repairs.  Hoping to have the parts available tomorrow.

Services Impacted:  The elevator will be offline during this time.

Work Performed By:  Otis Elevator

ContactRob Berg, CPFM Facilities Electrical Supervisor, 541-346-2313

To view current construction and impacts, visit UO Map.

8/29/22 – 8/30/22 Lillis East Elevator Offline
Posted on

UPDATE:
The elevator has been repaired and is operational

 

Begin:  Monday, August 29th, 2022

End:      Tuesday, August 30th, 2022

Building(s) or Area(s) Affected:  Lillis East Elevator

Scope:  The east elevator will be down for the evening.  Repairs will be made in the morning.

Services Impacted:  The east elevator will be unavailable.

Special Instructions:  Please use the other elevators located in the atrium or next to Peterson.

Work Performed By:  Otis Elevator

ContactRob Berg, CPFM Facilities Electrical Supervisor, 541-346-2313

To view current construction and impacts, visit UO Map.

8/29/22 CPFM Warehouse Design & Construction Door Repair Advisory
Posted on

Begin:  Monday, August 29th, 2022

End:      Monday, August 29th, 2022

Building(s) or Area(s) Affected:  CPFM Warehouse/Shops

Scope:  Facilities will be repairing the south entry double doors to the CPFM D&C Offices stairway, shown by the red X, which will render them inoperable throughout the day.  Alternate entry points are shown in green (see pic below).

Services Impacted:

  • The south stairway entrance to D&C will be closed but the SW stairway entrance will be open.
  • There will be some general construction noise (grinding, mainly) along with some sealant work to follow, so some unfamiliar odors may be present as well.

Special Instructions:  For those who bike in, or require use of the elevator, the southwest entry will be your closest entry point to the interior racks/elevator.

Work Performed By:  CPFM Facilities Crews

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.