Huestis Basement Electrical Shutdown 2/22/22
Posted on

Begin:  Tuesday, February 22nd, 2022 at 7:00 am

End:      Tuesday, February 22nd, 2022 at 11:00 am

Building(s) or Area(s) Impacted:  Huestis Hall Basement

Scope:  Electrical Panel 2S3 will be shut down in the Huestis Basement.

Services Impacted:  This could affect telecom and outlets within the basement.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  Mortenson Construction / EC Electric

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Willamette Hall and Huestis Hall Lawn Access and Scanning Advisory 2/21/22 – 2/23/22
Posted on

Begin:  Monday, February 21st, 2022

End:      Wednesday, February 23rd, 2022

Building(s) or Area(s) Impacted:  Lawn between Huestis Hall and Willamette Hall

Scope:  Mortenson Construction will be scanning the exterior structure of Huestis Hall.  They will conduct this work from a lift placed in the landscape between Willamette Hall and Huestis Hall.

Services Impacted:

  • The lift motor will be shut down during scans to avoid exhaust into air intakes.
  • The scanning device has no known safety issues to workers on the lift, people in the area or behind glass, or equipment within the building.

Work Performed By:  Mortenson Construction

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880