LISB MRI Suites 174 and 186 Chilled Water Pump VFD Shutdown 9/9/20
Posted on

Begin:  Wednesday, September 9th, 2020 at 8:00 am

End:      Wednesday, September 9th, 2020 at 10:00 am

Building or Area Impacted:  Lewis Integrated Science Complex (LISB)

Scope:  Operation of the Chilled Water Pump VFD will be disabled locally to gather startup data.

Services Impacted:

  • Service interruption should not impact services outside of LISB MRI Suites 174 and 186.
  • LCNI staff will be onsite to monitor the MRIs.

Work Performed By:   Alliant and GBC

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Pacific Hall HVAC Shutdown 9/10/20
Posted on

Begin:  Thursday, September 10th, 2020 at 8:00 am

End:      Thursday, September 10th, 2020 at 12:00 noon

Building or Area Impacted:  Pacific Hall

Scope:  The BAS control panels will need to be re-booted to download and implement a new software update. This will create 2-3 intermittent HVAC interruptions, of approximately 1-hour each, between 8:00 am and 12:00 noon.

Services Impacted:  This will affect all building HVAC equipment including cooling, fume hoods, and exhaust.

Special Instructions:  Please close all fume hood sashes the evening before, on Wednesday, September 9th.

Work Performed By:   Siemens

ContactStacy Breaux, CPFM FS Electrical/Control System Tech, 541-521-5376