Johnson Hall Restroom #006 Shutdown 12/16/19 – 12/23/19
Posted on

Update 12/19/19: This project has been extended and will be complete on Monday 12/23/19.

 

On Monday, December 16th, at 6:00 am until Friday, December 20th 23rd, at 5:00 pm, women’s restroom #006 will be shut down. During this time, the in-floor drain line, for the sink, will be replaced.

Loud noise will be heard throughout the building, Monday, October 16th, as workers cut into the floor to access the pipe.

Please use the all-gender restroom next door, in #006A, or the restrooms on the 2nd floor.

Work will be performed by CPFM Facilities Services.

For questions or concerns, please contact Ken Straw at 346-5406 or kstraw@uoregon.edu.

Klamath Hall 2nd Floor Renovation Area Heating Shutdown 12/4/19
Posted on

On Wednesday morning, December 4th, from 5:00 am to 9:00 am, the second floor heating water will be shut off, likely causing a temporary reduction of temperatures.  This needs to be done to allow contractors to isolate the heating water from the 2nd floor renovation area.

Warm rooms on the floor will receive temporary electric heaters for the duration.

Work will be performed by Lease Crutcher Lewis.

For questions or concerns, please contact Denise Stewart at 541-335-1258 or dstewart@uoregon.edu.

 

Humpy Lumpy Tunnel Lighting and Sump Pump Shutdown 12/5/19
Posted on

On Thursday, December 5th, from 8:00 am to 10:00 am, the breaker in Panel BN5-2 will be turned off in the tunnel west of Bean, under Humpy Lumpy. This is to allow the demo of site lighting in Humpy Lumpy. While the breaker is off, the lighting and sump pump in this section of the tunnel will not be operational.

Work will be performed by contractor OEG.

For questions or concerns, please contact George Bleekman at 541-346-2625 or bleekman@uoregon.edu.