UPDATE: 6/26/25 Agate Hall Rm 125 Noise And Access Advisory
Posted on

UPDATE: This work has been postponed until tomorrow Thursday, June 26, 2025, at 7:00 am

BeginWednesday, June 25, 2025, at 1:00 pm  Thursday, June 26, 2025, at 7:00 am

End:    Wednesday, June 25, 2025, at 4:00 pm  Thursday, June 26, 2025, at 10:00 am

Building(s) or Area(s) Affected:  Agate Hall – Room 125

Scope: Restroom will be closed and there will be some noise due to chipping tiles and core drilling through the men’s restroom wall to get water and a drain line connected to the new sinks

Services Impacted:  Men’s Restroom 125 will be closed while work is occurring.

Work Performed By:  Harvey & Price and Preferred Construction

ContactRenee Benoit, CPFM Owner’s Representative, 541-346-5080

3/26/25 Lillis Hall Middle Elevator #1 Emergency Shutdown
Posted on

UPDATE:
The middle elevator by the atrium has been restored to service.

 

Begin:  Wednesday, March 26, 2025 – effective immediately

End:      Unknown   Monday, April 7, 2025

Building(s) or Area(s) Affected:  Lillis Business Complex

Scope:  Middle elevator by atrium is down for emergency repairs and will need parts ordered for repair.  An update will be sent when it has been returned to service.

Services Impacted:  Middle elevator by atrium is offline.  Please use the other elevators or the stairs at this time.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis Elevator

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

UPDATE 3/21/25 – 1700 Millrace Emergency Elevator Shutdown
Posted on

 

UPDATE: 3/24/25

Both Elevators are back up and running

UPDATE:

Elevator 1 is back up and running and Elevator 2 remains down for repairs.

 

Begin:  Thursday, March 20, 2025 – effective immediately

End:      unknown

Building(s) or Area(s) Affected:  1700 Millrace

ScopeBoth elevators Elevator 2 down for repairs to the emergency phone line call button. An update will be sent when it has been returned to service.

Services ImpactedBoth elevators Elevator 2 is down, please use elevator 1

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Lumen

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

 

10/04/24 – 10/09/24 Prince Lucien Campbell (PLC) North Elevator Emergency Shutdown
Posted on

UPDATE:
The elevator has been restored to service.

 

Begin:  Friday, October 4, 2024 – effective immediately

End:      Unknown   Wednesday, October 9, 2024

Building(s) or Area(s) Affected:   Prince Lucien Campbell (PLC)

Scope:  The North elevator E177 is currently offline.  The Otis technician is working on it.  An update will be sent when it has been restored to service.

Services Impacted:  The North elevator is out of service however the South Elevator is still in service for an alternate route

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Prince Lucien Campbell

10/01/24 -10/02/2024 – Cascade Hall Elevator Emergency Shutdown
Posted on

UPDATE:

Elevator has been restored to service.

 

Begin:  Tuesday, October 1, 2024 – effective immediately

End:      Wednesday, October 2, 2024

Building(s) or Area(s) Affected:  Cascade Hall

Scope:  The elevator is currently offline.  The Otis technician is working on it.  An update will be sent when it has been restored to service.

Services Impacted:  The elevator is out of service.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map Image of Cascade Hall

9/17/24 Pacific Hall Fire System Testing Advisory
Posted on

Begin: Tuesday, September 17, 2024, at 6:00 am

End:     Tuesday, September 17, 2024, at 7:00 am

Building(s) or Area(s) Impacted:  Pacific Hall

Scope: Fire systems test will be performed next Tuesday

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  UO Safety & Risk Services

ContactZach Earl, UO Fire Protection Manager, 541-521-0351 or 541-346-9295

Overhead map view of Pacific Hall

6/28/24 Huestis Hall Room 104 Gas Supply Shutdown
Posted on

Begin:  Friday, June 28, 2024, at 7:00 am

End:     Friday, June 28, 2024, at 9:00 am

Building(s) or Area(s) Affected:  Huestis Hall Rm 104

Scope:  Gas service to room lab prep will be offline to replace the solenoid.

Services Impacted:  The gas supply will be shut down in room 104 during this time.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Posted in Gas
6/17/24 Lawrence Hall Room 188 Fire Suppression System Shutdown
Posted on

Begin:   June 17, 2024, at 7:00 am

End:      June 17, 2024, at 12:00 Noon

Building(s) or Area(s) Affected:  Lawrence Hall Rm 188 and Surrounding Areas

Scope:  Due to the remodel of Lawrence 188 the fire suppression system will be briefly shut down.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Harvey and Price and IES

Contact:  David Mason, CPFM Owner’s Representative, 541-346-5679

Current construction and impact information can be found on the UO Maps site.

5/30/24 – Unknown – Pacific Hall Subbasement Standing Water Advisory
Posted on

 

There is currently standing green water in the subbasement of Pacific Hall. They are working on getting the water pumped out and they hope it will be accessible by tomorrow. It is a possible that work might continue a few weeks after until issue is completely alleviated. Impact is not known at this time. Please contact Adam Jones if you have any further questions.

Adam S. Jones, CIEC | Environmental Services Manager
Safety and Risk Services
Environmental Health & Safety
1260 University of Oregon | Eugene, OR 97403-1260
(541) 346-8397 | asjones@uoregon.edu
(541) 852-5685

Overhead map Image of Pacific Hall

5/23/24 – 5/24/24 Gerlinger Annex Emergency AHU-5 Shutdown
Posted on

Begin:  Thursday, May 23, 2024 – Effective Immediately

End:      Friday, May 24, 2024 – In the Morning

Building(s) or Area(s) Affected:  Gerlinger Annex

Scope:  Shutting down air handling unit, AHU-5, overnight for maintenance/diagnostics and will be turning back on tomorrow morning.

Services Impacted: Air flow and temperatures will be reduced on the lower west side of the building.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Over head map image of the lower west side of Gerlinger annex

5/13/24 Willamette Hall Rooms 139-175 Natural Gas Temporarily Shut Off
Posted on

Begin:  Monday, May 13, 2024, at 7:00 am

End:      Monday, May 13. 2024, at 12:00 Noon

Building(s) or Area(s) Affected:  Willamette Hall Rooms 139-175

Scope:  A contractor will be installing an emergency gas shutoff valve and the natural gas for the 1st floor east wing will be temporarily shut down.

Services Impacted:  Natural gas will be offline during this time for the rooms listed above.

Work Performed By:  Harvey & Price

Contact:  Waymon Banks, CPFM Owner’s Representative, 541-346-0196

Current construction and impacts information can be found on the UO Maps site.

5/2/24 CPFM Administration Building (#136) and Facilities Services Miscellaneous Quonset Building #(131) Walk Through
Posted on

Begin:  Thursday, May 2, 2024, at 2:00 pm

End:      Thursday, May 2, 2024, at 5:00 pm

Building(s) or Area(s) Affected:  Facilities Services Miscellaneous Quonset (#131) and CPFM Administration Quonset (#136)

Scope: The architecture firm will be walking through the buildings for programming and schematic design for the seismic upgrade.

Services Impacted:  No impact is expected.

Work Performed By:  Woofter and Bolch Architects

ContactRenee Benoit, CPFM Owner’s Representative, 541-346-5080

Current construction and impacts information can be found on the UO Maps site.

5/03/24 Huestis Hall Reclaimed Water Supply Shutdown
Posted on

Begin:  Friday, May 3, 2024, at 7:00 am

End:   Friday, May 3, 2024, at 9:00 am

Building(s) or Area(s) Affected:  Huestis Hall

Scope:  Reclaimed water supply to toilets will be offline to allow for the replacement of a relief valve assembly.

Services Impacted:  Restrooms will be shut down on all floors.

Special Instructions:  Occupants are encouraged to use facilities in neighboring buildings.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall

4/26/24 – 4/29/24 Onyx Bridge Rm 367 Construction and Noise Advisory
Posted on

Begin:  Friday, April 26, 2024, at 7:oo am

End:      Monday, April 29, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  Onyx Bridge

Scope:  A new heat exhaust hood is being installed in lab 367. There will be anchors fired into the ceiling to suspend new ductwork. This is a brief percussive noise that sounds like a shot. Other sounds are standard construction noise. This work possibly will extend until Monday.

Services Impacted:  Noise is to be expected on the 3rd and 4th floors. This will especially affect the adjacent labs and labs directly upstairs.

Work Performed By:  Phoenix Mechanical

ContactJanell Cottam, CPFM Owner’s Representative, 541-346-7536

Current construction and impacts information can be found on the UO Maps site.

Image of Onyx Bridge Rm 367