Huestis Hall Suite 34 Domestic Hot and Cold Water Shutdown 12/1/21

Begin:  Wednesday, December 1st, 2021

End:      Wednesday, December 1st, 2021

Building(s) or Area(s) Impacted:  Huestis Hall, Suite 34

Scope:  As part of the Huestis Renovation Project, the domestic hot and cold water will be shut down to Suite 34.

Services Impacted:  Water will be offline within this work area, which is currently vacated.

Work Performed By:  Mortenson Construction

Contact:  Martina Oxoby, CPFM Owner’s Representative, 541-346-5880

Gerlinger Annex Fire Alarm Testing 12/2/21

Begin:  Thursday, December 2nd, 2021 at 6:00 am

End:      Thursday, December 2nd, 2021 at 9:00 am

Building(s) or Area(s) Impacted:  Gerlinger Annex 64, 66, and 70

Scope:  Fire alarm testing will be conducted as the result of system updates and additions stemming from the remodel of GRX 64, 66 and 70.

Services Impacted:  This will affect the fire alarm system.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  I.E.S. and UO Fire Marshal

ContactDavid Mason, CPFM Owner’s Representative, 541-346-5679

Hendricks Hall Environmental Health Conditions and Protocol Advisory 11/24/21

Subject: Water intrusion related environmental health assessment and control protocols for Hendricks Hall room 107 and adjacencies.

CPFM discovered a small amount of mold growth in room 107 of Hendricks Hall the week of November 15th. This discovery was made during investigation of an exterior water leak. Approx. 3 ceiling tiles were removed that were impacted with mold growth, and additional mold growth was identified on the gypsum board substrate above the tiles. The total impact was 2-3 square feet in one room, with the ceiling tiles being removed intact. The cause of the leak was determined to be the building gutter system. Similar leaks have been assessed in this area in the past, but this is the first instance where mold growth has been identified. CPFM is working to minimize the likelihood of future water intrusions.

On November 22 the area was inspected by Environmental Health and Safety at the request of the occupant. EHS recommended that the removed ceiling tiles be disposed of, the hole in the ceiling be sealed, and out of an abundance of caution the office cleaned according to EPA recommended protocols. The recommendations were completed the week of this inspection by appropriately trained CPFM personnel. Due to the small area impacted and the manner in which work was conducted during the initial impact, contamination resulting from this incident in room 107 and adjacent building areas is estimated to be insignificant.

Moving forward, affected portions of the ceiling in room 107 will be demolished using EPA recommended mold abatement protocols. Mold contaminated materials will be demolished where possible and cleaned and disinfected where contaminated materials must remain. Abatement work will be conducted by trained CPFM personnel and managed by EHS. The ceiling will be patched following approval by EHS that contamination has been removed. Adjacent office areas will be evaluated and may receive similar treatment at a future date to be determined.

Thank you for your patience while we work through this issue.

Steven Stuckmeyer
Environmental Health and Safety Director
Radiation Safety Officer
stuckmyr@uoregon.edu
541-346-3197  |  fax 541-346-7008
541-285-7593 cell
University of Oregon
Safety and Risk Services  |  1260 University of Oregon
1715 Franklin Blvd. Suite 2A, Eugene OR 97403-1260
safety.uoregon.edu

1715 Franklin Natural Gas Shutdown 12/1/21

UPDATE:
The natural gas has been restored.

 

Begin:  Wednesday, December 1st, 2021 at 7:00 am

End:      Wednesday, December 1st, 2021 at 3:00 pm

Building(s) or Area(s) Impacted:  1715 Franklin

Scope:  The natural gas meter is being replaced.

Services Impacted:  The HVAC heating and hot water will be offline on the first and second floors in the north portion of the building.

Work Performed By:  Northwest Natural Gas in conjunction with CPFM

ContactRichard Vaughan, CPFM Facilities Services Lead Worker-Refrigeration Mechanic, 541-346-2319

1715 Franklin Room 211 Data Port Installation Advisory 12/06/21 – 12/10/21

Begin:  Monday, December 6th, 2021

End:      Friday, December 10th, 2021

Building(s) or Area(s) Impacted:  1715 Franklin, room 211

Scope:  New data ports will be installed in room 211.  (Additional finish updates performed by Facilities is also happening in this room, as it fits into their schedule)

Services Impacted:  Workers will be coming and going from this space.

Work Performed By:  NTS

ContactBrianna Liberty, CPFM D&C Design Associate, 541-346-7612

Volcanology Steam Heat Shutdown 12/14/21

BeginTuesday, December 14th, 2021 at 7:00 am

End:      Tuesday, December 14th, 2021 at 4:00 pm

Building(s) or Area(s) Impacted:  Volcanology

Scope:  Due to a leaking steam pipe in the utility tunnel, the steam heat will be shut down in order to make repairs.

Services Impacted:

  • This will affect the building’s heating system.
  • Utilities & Energy staff will be accessing the basement utility closet (011A) to shut down and start-up steam equipment in the tunnel.

Work Performed By:  CPFM Utilities & Energy and a contractor

ContactKyle Wilson, CPFM Utilities Maintenance Manager, 541-346-2246

Fine Arts Sculpture Bark Delivery and Noise Advisory 12/06/21

REVISED DATE:
The bark will be placed the following week, on Monday, December 6th, 2021 at the same time.

 

Begin:  Monday, November 29th, December 6th, 2021 at 8:00 am

End:      Monday, November 29th, December 6th, 2021 at 12:00 noon

Building(s) or Area(s) Impacted:  Area by Fine Arts Sculpture

Scope:  Lane Forest Products will be blowing bark around the Fine Arts Sculpture Studio.  The blue area on the diagram below shows where the truck will be stationed and the red shows the location where the bark will be blown next to the building.

Services Impacted:  Loud noise is to be expected from the truck blower.

Work Performed By:  Lane Forest Products

ContactRod Madison, CPFM Landscape Coordinator, 541-346-8626

Campus Street Sweeping Advisory 11/19/21 – 11/20/21

Begin:  Friday, November 19th, 2021 at 11:45 pm

End:      Saturday, November 20th, 2021 at 5:00 am

Building(s) or Area(s) Impacted:  University St. from 18th to 13th; 13th from Kincaid to Agate

Scope:  Campus Streets will be swept sometime between 11:45 PM on 11/19 and 5:00 AM on 11/20

Services Impacted:  Slow moving street sweeper on roadway.

Work Performed By:  Emerald Valley Sweeping

ContactKevin Farthing, CPFM Assoc. Dir Facilities Services Env., 541-346-2857

Campus Wide Streets and Sidewalks Delivery Service Mapping Advisory 11/19/21 – 12/3/21

Begin:  Friday, November 19th, 2021

End:      Friday, December 3rd, 2021

Building(s) or Area(s) Impacted:  Campus Wide Streets and Sidewalks

Scope:  The University of Oregon is exploring a robot food delivery service. A preliminary phase includes a mapping process involving a robot and operator going throughout campus streets and sidewalks to gather the necessary field digital mapping data. This mapping process will be taking place on campus between November 19 – December 3.

Work Performed By:  Contracted Food Delivery Vendor

Contact:  Tom Driscoll, Associate Director University Housing and Director of University Dining, 541-346-2666, driscoll@uoregon.edu

Prince Lucien Campbell Safety Rail Installation Advisory 11/22/21 – 11/23/21

Begin:  Monday, November 22nd, 2021 at 7:00 am

End:      Tuesday, November 23rd, 2021 at 5:00 pm

Building(s) or Area(s) Impacted:  Prince Lucien Campbell

Scope:  An additional safety rail will be installed on the 9th floor roof of the PLC Building.

Services Impacted:  Crews will be using the south stair tower to bring the long sections of rail to the roof and there may be associated noise from drilling and other construction activities.

Work Performed By:  McKenzie Commercial

ContactLuke Helm, CPFM Owner’s Representative, 541-346-8216

CPFM Compound Crane Activity Advisory 12/06/21

UPDATE:
Due to the parts being delayed, the crane activity has been rescheduled for Monday December 6th at 9:00 am.

 

BeginFriday, December 2nd, 2021  Monday, December 6th, 2021 at 9:00 am

End:      Friday, December 2nd, 2021  Monday, December 6th, 2021

Building(s) or Area(s) Impacted:  CPFM Compound

Scope:  Due to cooling tower fill media replacement, a crane will be accessing the CPFM – Utilities & Energy compound 1-2 hours to lift material to the Chilled Water Plant roof.

Services Impacted:  There will be little to no impact to CPFM or Back 40 compound access.

Extra Notes:  The crane will be parked inside the Utilities & Energy fence.

Work Performed By:  Contractor

Contact:  Kyle Wilson, CPFM Utilities Maintenance Manager, 541-346-2246

Knight Law Fire System Testing 11/19/21

Begin:  Friday, November 19th, 2021 at 6:00 am

End:      Friday, November 19th, 2021 at 7:00 am

Building(s) or Area(s) Impacted:  Knight Law

Scope:  A fire systems test/maintenance will be performed.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  UO Safety & Risk Services

ContactZach Earl, UO Fire Systems Program Manager, 541-521-0351 or 541-346-9295.

Willamette Hall Fire System Testing 11/18/21

Begin:  Thursday, November 18th, 2021 at 6:00 am

End:      Thursday, November 18th, 2021 at 7:00 am

Building(s) or Area(s) Impacted:  Willamette Hall

Scope:  A fire systems test/maintenance will be performed.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  UO Safety & Risk Services

ContactZach Earl, UO Fire Systems Program Manager, 541-521-0351 or 541-346-9295.

Willamette Hall Power Outage Advisory 11/17/2021

Begin:  Wednesday, November 17th, 2021 at 10:27 AM

End:    Wednesday, November 17th, 2021

Building(s) or Area(s) Impacted:  Willamette Hall

Scope:  We were just advised that there was a short power outage in the building.

Services Impacted:  Electricity potentially building-wide.

Extra Notes: Please check equipment in your spaces to see if it is operational.

Work Performed By:   CPFM Facilities Services Electrical

Contact:  Work Control Center, Campus Planning and Facilities Management, 346-2319

McArthur Court Fire Sprinkler Work Advisory 11/17/21

Begin:  Wednesday, November 16th, 2021 at 7:00 am

End:      Wednesday, November 16th, 2021 at 4:00 pm

Building(s) or Area(s) Impacted:  McArthur Court

Scope:  Work will be done on the pipes for the fire sprinkler system.  Other work may involve the hoses attached to the fire department’s connections on the exterior of the building.

Services Impacted:  No alarms will be heard during this time.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  UO Safety & Risk Services

ContactSimon Ditton, UO SRS Fire Protection Manager, 541-346-2958

Thompson University Center Elevator Shutdown 11/16/21 – 3/23/22

UPDATE 3/23/22:
The elevator has been repaired and is back online.

 

UPDATE:
Otis will be onsite to make repairs from 7:00 am to 6:00 pm on the following dates:

  • Monday, March 14 – Thursday, March 17
  • Monday, March 21 – Friday, March 25

They will be accessing the parking garage, stairwells, and elevator.

 

 

Begin: Effective Immediately – Tuesday, November 16th, 2021

End:    Unknown

Building Impacted:  Thompson University Center

Scope:  The elevator is currently shut down and awaiting parts.  An update will be sent when services have been restored.

Services Impacted: The elevator is currently offline.

Work Performed By: Otis

Contact: Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Lokey Education Building C Contractor Walk-through Advisory 11/16/21

Begin:  November 16, 2021 at 10:30 AM

End:      November 16, 2021 at 11:30 AM

Building(s) or Area(s) Impacted:  Lokey Education C (building 41)

Scope:  Design & Construction will be walking through the building with contractors in advance of an elevator modernization project.

Services Impacted:  No services will be impacted. Contractors can be observed walking through the building.

Work Performed By:  CPFM Design & Construction and Contractors

ContactDamon Rutherford, Owner’s Representative, 541-346-8285

Friendly Hall Elevator Lobby Lighting Work Advisory 11/16/21

Begin:  Tuesday, November 16th, 2021 at 7:30 am

End:      Tuesday, November 16th, 2021 at 9:30 am

Building(s) or Area(s) Impacted:  Friendly Hall

Scope:  Sunset Electric will install new lighting in front of the elevator on the 1st floor.

Services Impacted:  Construction works will be working in the first floor elevator lobby area.

Work Performed By:  Sunset Electric

ContactGene Mowery, CPFM Owner’s Representative, 541-346-5593

Onyx Bridge Fume Hood and Exhaust Fan Shutdown 11/17/21 – 11/18/21

Begin:  Wednesday, November 17th, 2021 at 7:00 am

End:      Thursday, November 18th, 2021 at 3:30 pm

Building(s) or Area(s) Impacted:  Onyx Bridge

Scope:  Due to preventative maintenance tasks, there will be rolling shutdowns of fume hoods throughout the building.

Services Impacted:  This will affect every fume hood and related exhaust fan.

Special Instructions:  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Work Performed By:  CPFM Mechanical Shop

ContactRichard Vaughan, CPFM Facilities Services Lead Worker-Refrigeration Mechanic, 541-346-2319

 

University Health Services Elevator Shutdown 11/15/2021 – 11/17/21

UPDATE 11/17:
The elevator has been repaired and is operational.

 

UPDATE 11/15:
Parts are being ordered, and an update will be provided once they have been installed.

 

Begin: Effective Immediately – Monday, November 15, 2021

End:    Unknown Wednesday, November 17, 2021

Building Impacted:  University Health Services

Scope:  The service elevator is non-responsive, and the Otis elevator technician has been dispatched.  An update will be sent when services have been restored.

Services Impacted: The service elevator is currently out-of-order.

Work Performed By: Otis

Contact: Work Control Center, Campus Planning and Facilities Management, 541-346-2319

McKenzie Hall Water Intrusion impacting rooms on the 1st and 2nd floors 11/14

Update 11/17/21:

Upon further detailed investigation, classrooms 221 & 214 were found to be unaffected by the mechanical failure.  Because these classrooms continue to be appropriately served by building HVAC systems as before, the recently installed portable filtration units will be relocated to areas where they provide needed benefits.

We appreciate your understanding. If you have any questions, please contact the Work Control Center at 541-346-2319 or email workcontrolcenter@uoregon.edu.

 

Update 11/15/21:

McKenzie Hall faculty and staff,

In response to the water intrusion in room 127, facilities deployed portable air filtration units over the weekend so classes could be scheduled today.  Some of the units are operating at higher noise levels and will be replaced with quieter units today.  Facilities is investigating why the sump pump failure alarms did not function and have installed temporary water detection alarms in addition to supporting ongoing mitigation efforts.

Due to flooding with greywater, the following mitigation actions are underway, including engagement of restoration contractors:

  • Remove loose items from the space.
  • Catalog damaged items of value as a loss.
  • Clean and disinfect the mechanical room.
  • Clean and disinfect HVAC unit, remove and replace all damaged insulation.
  • Clean and disinfect return-air ductwork and duct insulation that was below the waterline.

The affected HVAC system is expected to remain offline for at least 2-3 weeks and until HVAC cleaning and restoration activities are complete.  Portable HEPA units will remain in place until the successful cleaning and testing of the HVAC system is complete.

The restoration contractors are working under the scope provided by Environmental Health and Safety professionals.

We appreciate your understanding. If you have any questions, please contact the Work Control Center at 541-346-2319 or email workcontrolcenter@uoregon.edu

 

 

Original Notice:

Over the weekend, McKenzie Hall mechanical room 127 was flooded with multiple feet of water. The water containment and clean up are complete. However, the HVAC system has been impacted and will remain offline for specific classrooms (listed below) until the system can be repaired or replaced. HEPA units have been set up in the affected classrooms to ensure proper air circulation and filtration. These are the same type of HEPA units that are currently used in older buildings across campus that do not have existing HVAC systems.

The affected areas in McKenzie may see some comfort impacts until the HVAC system is back online. Some of the HEPA units currently in place are the louder industrial style. These will be exchanged for the quieter commercial styles as those become available.

More information will be communicated this week as the repair needs and timelines are identified.

IMPACTED CLASSROOMS:

121

122

123

125

129

214

221

229

We appreciate your understanding. If you have any questions, please contact the Work Control Center at 541-346-2319 or email workcontrolcenter@uoregon.edu

Lillis Atrium Elevator Out of Order 11/12/21

UPDATE:
The Atrium elevator has been has been repaired and is operational.

 

Begin: Effective Immediately – Friday, November 12, 2021

End:    Unknown

Building Impacted:  Lillis Hall

Scope:  The Atrium elevator is non-responsive and the Otis elevator technician has been dispatched.  An update will be sent when services have been restored.

Services Impacted: The elevator is currently out-of-order.

Work Performed By: Otis

Contact: Work Control Center, Campus Planning and Facilities Management, 541-346-2319

UPDATE: PLC Elevators Unresponsive – 11/12/2021

UPDATE:  The elevators have been repaired and are operational.

Begin: Friday, November 12, 2021

End:    Unknown

Building Impacted:  PLC Elevators

Scope:  Both elevators are nonresponsive. The Otis elevator technician has been dispatched and will be on-site making repairs.

Services Impacted: The elevators are currently shut down.

Extra Notes: An update will be sent when services are restored.

Work Performed By: Otis

Contact: Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Klamath Hall Surge Space Construction Advisory 11/11/21 – 5/31/22

UPDATE 4/25: Due to delays the project has been extended to May 31, 2022.

 

UPDATE – NOISE ADVISORY:
Monday, December 13th through Friday, December 17th
Contractors will be performing wall demolition in rooms 018, 018A, 015A, 015B, 019B, 015E, 015D, 015C.
Noise may be heard throughout the building.

 

Begin:  Thursday, November 11th, 2021

End:      Monday, April 25th May 31st, 2022

Building(s) or Area(s) Impacted:  Klamath Hall – 026, 019D, 019E, 019, 018, 018A, 015A, 015B, 019B, 015E, 015D, 015C, and H015.

Scope:  Due to the Huestis deferred maintenance project, the Klamath Prep area will be renovated.

Services Impacted:

  • Expect to hear general construction noise during business hours. Crews will target the loudest and most disruptive activities to occur between 5 am and 8 am.
  • Areas that will be affected are domestic hot and cold water, electrical, fire alarm systems, the HVAC air supply, and the loading dock.
  • Updates to this notice will be submitted for specific activities that may have a further impact on building users.

Work Performed By:  Mortenson Construction

Contact:   Tim Allenbaugh, CPFM Owner’s Representative, 541-346-8214