1st Day: Tuesday, January 9, 2024, from 7:00 am until 4:00 pm
2nd Day: Friday, January 12, 2024, from 7:00 am until 4:00 pm
Building(s) or Area(s) Affected: Huestis Hall and Lokey Labs
Scope:
- Huestis Hall: On Tuesday 1/9 and again on Friday 1/12 from 7:00 am – 4:00 pm, air and exhaust systems will be offline in the basement as the temporary AHU and exhaust fans are removed and final connections to building AHU units and lab exhaust fans are reconnected. User access to Huestis rooms 6, 12 and 13 should be limited or avoided during this shutdown.
- Lokey Labs and Huestis Hall: On Tuesday, 1/9 from 7:00 am until 4:00 pm, the fire alarm system will be offline to Huestis and Lokey Labs during this shutdown. Contractor will provide fire watch.
Services Impacted: This will affect exhaust, fire alarm systems, fume hoods, heating, cooling, and the HVAC air supply. Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.
Details: Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.
Special Instructions: If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations
Work Performed By: JH Kelly, FM Sheetmetal, IES
Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880
Current construction and impacts information can be found on the UO Maps site.