5/02/23 – 5/03/23 – 1715 Franklin North Wing Emergency Drainage System Shutdown

UPDATE:
The sump pump issue has been repaired and the drains are back online.

 

Begin:  Tuesday, May 2, 2023 – effective immediately

End:      Unknown Wednesday, May 3, 2023

Building(s) or Area(s) Affected:  1715 Franklin

Scope:  Emergency shut down of the drains on the first and second floor north wing due to sump pump issues.  A notice will be sent when the drains have been restored.

Services Impacted:  This affects the restrooms, sinks, drinking fountains, and custodial closets in the north wing.  This does not affect the south wing.

Special Instructions:  Please use restrooms and sinks in the south wing.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of 1715 Franklin 1st floor north wing

5/02/23 – Willamette Hall Emergency Domestic Cold Water Shutdown

UPDATE:
The repair has been completed and water has been restored.

 

Begin:  Tuesday, May 2, 2023 – effective immediately

End:      Unknown  Tuesday, May 2, 2023

Building(s) or Area(s) Affected:  Willamette Hall

Scope:  The domestic cold water has been shut down to make an emergency repair of a leak in the backflow system.  A notice will be sent when the repair has been completed.

Services Impacted:  This will affect the sinks, drinking fountains, and restrooms.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Willamette Hall

4/28/23 Willamette Hall Emergency Domestic Cold Water Shutdown

UPDATE:
The water has been restored.

 

Begin:  Friday, April 28, 2023 – effective immediately

End:      Unknown  Friday, April 28, 2023 – around 10:15 am

Building(s) or Area(s) Affected:  Willamette Hall

Scope:  The domestic cold water has been shut down for an emergency repair.  An update will be sent when it has been restored.

Services Impacted:  This will affect domestic water in sinks, drinking fountains, and restrooms.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Willamette Hall

4/19/23 – 4/21/23 Columbia Hall Women’s Restroom 146C Closure

UPDATE:
Work actually began the night of April 19th.
Our apologies for any inconvenience this may have caused.
Stall installation is expected to be completed Friday morning as scheduled.

 

BeginThursday, April 20, 2023, at 8:30 pm  Wednesday, April 19, 2023, at 8:30 pm

End:      Friday, April 21, 2023, at 6:30 am

Building(s) or Area(s) Affected:  Columbia Hall Women’s Restroom #146C

Scope:  The women’s restroom will be closed overnight to replace the stalls.

Services Impacted:  The restroom will be unavailable during this time.  An all-gender restroom is available on the 2nd floor.

Work Performed By:  CPFM Facilities Night Maintenance

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Columbia Hall's 1st floor Women's Restroom location

3/27/23 – 3/31/23 Susan Campbell First Floor Restrooms Closed

Begin:  Monday, March 27, 2023

End:      Friday, March 27, 2023

Building(s) or Area(s) Affected:  Susan Campbell Hall Restrooms 129 and 144

Scope:  The first floor restrooms will be closed during Spring Break in order for Facilities Services to perform cleaning, repairs, and updates.

Services Impacted:  Building occupants will need to use the restrooms on the 2nd and 3rd floors during this time.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

3/13/23 Collier House Room 207 Abatement Project Advisory

Beginning on Monday, 3/13/23, restroom 207 will be off-line for a flooring replacement project. The floor tiles within that space are asbestos-containing, so the University has retained a licensed asbestos abatement contractor to perform the demolition phase as an asbestos abatement project. All removal work will be completed within a full negative pressure enclosure using HEPA air filtration units in strict adherence to regulatory requirements, and will be overseen by UO Environmental Health & Safety (EH&S).

Installation of new flooring materials will be performed by Campus Planning and Facilities Management (CPFM) after abatement work is complete.

Please feel free to contact me if you have any questions or concerns about the abatement phase of this project. Questions pertaining to the new flooring installation phase should be directed to CPFM Work Control (workcontrolcenter@uoregon.edu / 541-346-2319)

__________________________________

Nate Ferguson
Building Environmental Sciences Coordinator

http://safety.uoregon.edu/

Safety & Risk Services | University of Oregon
1260 University of Oregon | Eugene, OR 97403-1260
Office: 541.346.2901 | Mobile: 530.902.0109

Current construction and impacts information can be found on the UO Maps site.

12/12/22 -1/6/23 Lokey Education Elevator and Restrooms Shutdown Advisory

UPDATE 12/29/22:  Due to unexpected delays the completion date for this work is now scheduled for 1/6/23

Begin:  Monday, December 12, 2022

EndFriday, December 30, 2022 Friday, January 6th, 2023

Building Affected:  Lokey Education Restrooms #172, #173, #272, #273

Scope:  Due to the elevator modernization project, and associated ongoing construction, the first and second floor restrooms immediately adjacent to the elevator will be closed for the duration of Winter Break. In addition, the elevator will be out of service during this time.

Services Impacted:

  • Restrooms #172, #173, #272, #273 will be shut down.  Please see map below for nearby facilities in HEDCO.
  • The elevator will be offline.  Please use the stairs to the north of the elevator or by classroom 176.

Work Performed By:  Ryan Thomas construction

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

Current construction and impacts information can be found on the UO Maps site.

11/08/22 – 11/09/22 Price Science Commons Ground Floor Restroom Shutdown

Begin:  Tuesday, November 8th, 2022 – effective immediately

End:      Wednesday, November 9th, 2022

Building(s) or Area(s) Affected:  Price Science Commons Ground Floor Restroom

Scope:  Due to a clogged line, repairs need to be made in the All-Gender Restroom next to the Elements Café.  Work is expected to be completed tomorrow.

Services Impacted:  The ground floor restroom is closed.  Please use the restrooms on the lower level.

Work Performed By:  CPFM Facilities Services Plumbing Crew

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

To view current construction and impacts, visit UO Map.

11/08/22 – 12/9/22 Knight Law Restrooms 166, 167, 231A Construction Advisory

UPDATE:  The end date for this work has been extended out to Friday, December 9th, 2022, each restroom will be closed as they are being worked on.

Begin: Tuesday, November 8th, 2022

End: Thursday, November 17th, 2022 Friday, December 9th, 2022

Building(s) or Area(s) Affected: Knight Law Restrooms 166, 167, and 231A

Scope: Three restrooms will be offline to replace toilet stall partitions.

  • 11/08/22 – 11/09/22 Restroom #231A
  • 11/10/22 – 11/14/22 Restroom #166
  • 11/16/22 – 11/17/22 Restroom #167

Services Impacted: The three restrooms will be out of order during their assigned dates.  The three restrooms will be closed as they are being worked on.

Special Instructions: Please use other restrooms located in the building.

Work Performed By: CPFM Facilities Services Night Maintenance Crew

Contact: David Cates, CPFM Design Mgr. and Staff Architect, 541-346-8238

To view current construction and impacts. visit UO Map.

10/10/22 Huestis Basement Domestic and Industrial Water Outage

Begin:  Monday, October 10th, 2022 at 7:30 am

End:      Monday, October 10th, 2022 at 8:30 am

Building and Area:  Huestis Basement

Scope: There will be a brief power outage to the domestic hot water and industrial water circulation pumps in the basement of Huestis Hall to install a temporary panel for power during construction

Services Impacted:  This will shutdown the domestic hot water and industrial water

Work Performed By:  EC

Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

6/27/22 – 6/29/22 Many Nations Longhouse Domestic Hot and Domestic Cold Water Shutdown

UPDATE:
The repairs have been completed and the system is operational.
UPDATE:
This shutdown has been extended to 4:00 pm tomorrow, Wednesday, June 29th.
Work is expected to take place from 9:00 am to 4:00 pm.
Noise from the construction equipment will be heard in that area.

 

Begin:  Monday, June 27, 2022 at 7:00 am

End:      Wednesday, 29, 2022 at 7:00 am 4:00 pm

Building: Many Nations Longhouse

Scope: Due to damage to a sewer pipe, Roto Rooter will be excavating a small area of ground in the grass west of the Longhouse. The sewer pipe with be repaired and relined.

Services Impacted: Domestic Hot and Cold Water. All restroom, sinks, drains, and faucets will be shut down temporarily

Work Performed By:  Roto Rooter

ContactKyle Harshbarger, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

To view current construction and impacts, visit UO Map.

6/20/22 – 7/8/22 Lokey Education South Side Restroom Shutdown

Begin:  Monday, June 20th, 2022

End:  Friday, July 8th, 2022

Building: Lokey Education building C.

Scope:  Due to an elevator modernization project, the restrooms immediately adjacent to the elevator will be closed (172, 173, 272, 273).

Services Impacted:  The Elevator and restrooms will be off line until project is complete.

Special Instructions:  Please use the alternate restrooms In Hedco, shown on the following map.

Work Performed By:  Ryan Thomas Construction.

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.

5/31/22 – Unknown – Baker Downtown Center Restrooms Shutdown

UPDATE 6/30/22:
The restrooms are to remain shut down until further notice. The issue is ongoing, there is no known time when they will be reopened.

 

Begin:  May 31st, 2022

End:      Unknown

Building(s) or Area(s) Impacted:  Baker Downtown Center – Restrooms 201A and 202A

Scope:  The two restrooms are closed by order of the City of Eugene until the sewer line to the street can be repaired by the City

Services Impacted:  Restroom facilities in Rooms 201A and 202A only

Special Instructions:  Use Restrooms down the Hall, Rooms 209 and 211

Work Performed By:  City of Eugene

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

5/14/22 & 5/21/22 Huestis Hall, Lokey Labs, and Willamette Hall Domestic Water Shutdown – Update

UPDATE:
The fire water line shutdown will still occur 5/14 as scheduled, however the domestic water shutdown has been rescheduled for next Saturday, May 21, due to delays in materials.  Willamette Hall will also be affected by the domestic water shutdown on Saturday, May 21st.

 

 

Fire Water Line:  Saturday, May 14th, 2022 from 7:00 am till 3:00 pm

Domestic Water Line:   Saturday, May 21st, 2022 from 7:00 am till 3:00 pm

Building(s) or Area(s) Impacted:  Huestis Hall and Lokey Labs (and Willamette Hall 5/21)

Scope:  As part of the Huestis Hall Renovation project, the main domestic water line and fire water line will be shut down on Saturday for 8 hours.

Services Impacted:  All services that need water will be unavailable during this time. This could include lab equipment, HVAC building equipment, fire sprinkler systems, and restroom plumbing services.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations.

Work Performed By:  Mortenson Construction

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Esslinger Hall & NW Corner of SRC Electrical Shutdown 4/30/22

UPDATE 4/18: The first hour (from 6am to 7am), ALL of Esslinger, and the NW corner of the Student REC Center of will be without power. After 7am, the noted spaces for Esslinger will continue to be offline until 4pm.

Begin:  Saturday, April 23rd 30th, 2022 at 6:00 am

End:      Saturday, April 23rd 30th, 2022 at 4:00 pm

Building(s) or Area(s) Impacted:  Esslinger Hall & NW Corner of SRC

Scope:  Electrical Panel C1 and C2 will be shut down to replace them with new panels. The first hour (from 6am to 7am), ALL of Esslinger, and the NW corner of the Student REC Center of will be without power. After 7am, the noted spaces for Esslinger will continue to be offline until 4pm.

Services Impacted:  Power will be off on Saturday to the NW corner of the SRC and all of Esslinger.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  Mortenson Construction / EC Electric

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

Streisinger Hall Rooms 255-283 Domestic Water Shutdown 3/24/22

Begin:  Thursday, March 24th, 2022 at 7:00 am

End:      Thursday, March 24th, 2022 at 11:00 am

Building(s) or Area(s) Impacted:  Streisinger Hall Rooms 255-283

Scope:  The domestic water will be shut down on the east side and in the E/SE area of the second floor to install a new eyewash in the 2nd floor project area.

Services Impacted:

  • This will affect the project area, Grimes Lab, and the second floor bathrooms.
  • Other labs on the floor will not be impacted.

Work Performed By:  Mortenson Construction

ContactColin Brennan, CPFM Owner’s Representative, 541-346-8242

Agate Hall and Agate House Domestic Water Shutdown 2/28/22 – 3/2/22

UPDATE 3/2/22:
The water has been restored.

 

UPDATE:
This shutdown is being extended by one day.
Additional time is need for the excavation work for the new 2” domestic cold water line.

 

Begin:  Monday, February 28th, 2022 at 8:00 am

End:      Tuesday, March 1st, Wednesday, March 2nd, 2022 at 5:00 pm

Building(s) or Area(s) Impacted:  Agate Hall and Agate House

Scope:  Due to a massive leak, the domestic water will be shutdown to repair the main domestic cold line outside.

Services Impacted:  This will affect the domestic hot and cold water to the restrooms, sinks, and drinking fountains.

Work Performed By:  Roto Rooter

ContactNic Patton, CPFM Facilities Plumbing, 541-346-2319

Huestis Hall Domestic Cold Water Shutdown 2/18/22

Begin:  Friday, February, 18 2022, 7:00 am

End:  Friday, February, 18 2022, 8:00 am

 

Building(s) or Area(s) Impacted: Huestis Hall, first floor.

Scope:  Domestic cold water will be shut down to the first floors so pipes can be traced.

Services Impacted:  The domestic cold water will be off line, affecting sinks, restrooms, and drinking fountains.

Work Performed By:  Mortenson Construction and JH Kelly.

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Esslinger Hall Electrical Shutdown 2/26/22

Begin:  Saturday, February 26th, 2022 at 7:00 am

End:      Saturday, February 26th, 2022 at 1:00 pm

Building(s) or Area(s) Impacted:  Esslinger Hall – First Floor and Possibly Basement Level

Scope:  Contractors will shut down power to Panels C1 and C2 to terminate 8 circuits and re-feed additional circuits for rooms 112 and 116.

Services Impacted:  Power will be offline on the first floor and possibly affect some circuits in the basement level.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  Mortenson Construction/ EC Power

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

Columbia Hall Domestic Cold and Hot Water Shutdown POSTPONED

UPDATE 2/3/22: Due to a staff  shortage this shutdown has been delayed. An update will be sent out when it has been rescheduled.

BeginThursday, February 3rd, 2022 at 8:30 am Unknown

End:      Thursday, February 3rd, 2022 at 12:00 noon Unknown

Building(s) or Area(s) Impacted:  Columbia Hall

Scope:  In order to make a valve repair on the domestic cold water system, the domestic cold and hot water will be shut down.

Services Impacted:  All restroom sinks, toilets, urinals will be affected. This includes all the cold water and hot water to lab faucets, drinking fountains, fume hoods, and the safety eyewashes/showers.

Work Performed By:  CPFM FS Plumbing Shop

ContactOlin Vermillion, CPFM Facilities Plumbing, 541-346-2319

Gerlinger Annex Domestic Cold and Hot Water Shutdown 11/16/21

UPDATE:
The water has been restored.

 

Begin:  Tuesday, November 16th, 2021 at 7:00 am

End:      Tuesday, November 16th, 2021 at 3:00 pm

Building(s) or Area(s) Impacted:  Gerlinger Annex

Scope:  The domestic water will be shut down to make repairs to the shower valves in the basement, plus address the water flow issue in the 1st floor breakroom sink.

Services Impacted:  Domestic hot and cold water will be offline to all floors, affecting restrooms, sinks, and drinking fountains.

Work Performed By:  CPFM FS Plumbing Dept.

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

Rainier 1st Floor Men’s Restroom Shutdown 10/18/21 – 10/25/21

Begin:  Monday, October 18th, 2021

End:     Monday, October 25th, 2021

Building(s) or Area(s) Impacted:  Rainier

Scope:  A new water heater will be installed in the men’s restroom.

Services Impacted:

  • The first floor men’s restroom will be closed during this time.
  • The second floor men’s restroom will remain open.

Work Performed By:  CPFM FS Plumbing Dept.

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

 

Oregon Hall 1st Floor Restrooms Shutdown 10/1/21-10/4/21

UPDATE: A contractor is removing carpet and baseboard from H190, building a containment, and drying the wall finishes in the area. The first floor restrooms will be closed until approximately 10:00 AM on Monday October 4, 2021. Diagram is attached.

Begin:  Immediately

End:      10/1/21 at 12:00 pm 10/4/21 at 10:00 am

Building(s) or Area(s) Impacted:  Oregon Hall L150, H151, H190, 190, 191, and 192

Scope:  Waste water from the restrooms backed up from the drains and intruded into hallways 151 and 190 and lobby 150.

Services Impacted: The area, including the restrooms, will be closed until approximately 12:00 pm. Roto Rooter will be on-site snaking the drain lines.

Extra Notes: We will send an update when the restrooms are operational again.

Work Performed By:  CPFM Facilities Services Plumbing and Roto Rooter

Contact: Work Control Center, Campus Planning and Facilities Management, 346-2319

Oregon Hall Waste Water Intrusion[embeddoc url=”https://blogs.uoregon.edu/cpfmnotifications/files/2021/10/Oregon-Hall-Waste-Water-Intrusion.pdf” download=”all” viewer=”google”]

Klamath Hall Domestic Hot Water Advisory 8/9/21 – 9/1/21

UPDATE 9/1/21: The domestic hot water is restored.

 

Begin:  Monday, August 9th, 2021 – effective immediately

End:      Unknown

Building(s) or Area(s) Impacted:  Klamath Hall

Scope:  The domestic hot water was found not working today.  It will be luke warm until further notice.  Parts will be order by the BAS shop.

Services Impacted:

  • Domestic hot water temperature reduced to the restrooms, custodial closets, and eyewash stations.
  • This does not affect the Industrial hot water.

Work Performed By:  CPFM BAS and Plumbing Shops

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

Onyx Bridge Domestic Cold Water Shutdown 8/10/21

UPDATE:
The domestic water is back online.

 

Begin:  Tuesday, August 10th, 2021 at 8:00 am

End:      Tuesday, August 10th, 2021 at 12:00 noon

Building(s) or Area(s) Impacted:  Onyx Bridge

Scope:  The domestic cold water will be shut down in order to make valve repairs.

Services Impacted:  This will affect the restrooms and drinking fountains, but not the labs.

Work Performed By:  CPFM FS Plumbing Shop

ContactOlin Vermillion, CPFM Facilities Plumbing, 541-346-2319