Klamath Hall Domestic Hot Water Advisory 8/9/21 – 9/1/21

UPDATE 9/1/21: The domestic hot water is restored.

 

Begin:  Monday, August 9th, 2021 – effective immediately

End:      Unknown

Building(s) or Area(s) Impacted:  Klamath Hall

Scope:  The domestic hot water was found not working today.  It will be luke warm until further notice.  Parts will be order by the BAS shop.

Services Impacted:

  • Domestic hot water temperature reduced to the restrooms, custodial closets, and eyewash stations.
  • This does not affect the Industrial hot water.

Work Performed By:  CPFM BAS and Plumbing Shops

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

Onyx Bridge Domestic Cold Water Shutdown 8/10/21

UPDATE:
The domestic water is back online.

 

Begin:  Tuesday, August 10th, 2021 at 8:00 am

End:      Tuesday, August 10th, 2021 at 12:00 noon

Building(s) or Area(s) Impacted:  Onyx Bridge

Scope:  The domestic cold water will be shut down in order to make valve repairs.

Services Impacted:  This will affect the restrooms and drinking fountains, but not the labs.

Work Performed By:  CPFM FS Plumbing Shop

ContactOlin Vermillion, CPFM Facilities Plumbing, 541-346-2319

Pacific Hall Domestic and Industrial Water Shutdown 7/29/21

UPDATE:
The water has been restored.

 

Begin:  Thursday, July 29th, 2021 at 7:30 am

End:      Thursday, July 29th, 2021 at 12:00 noon

Building(s) or Area(s) Impacted:  Pacific Hall

Scope:  The domestic and industrial water will be shut down to replace a frozen shut-off valve on the domestic and industrial cold water for a lab sink in room 234B.

Services Impacted:

  • This will affect the entire building’s domestic and industrial hot and cold water, including restrooms and drinking fountains.
  • RO water will not be affected.

Work Performed By:  CPFM FS Plumbing Dept.

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

Klamath Hall Emergency Restroom Closure on the 2nd, 3rd, and 4th Floors 6/25/21 – 6/28/21

UPDATE 6/28/21: The repairs are complete and the restrooms are back online.

 

Begin:  Friday, June 25th, 2021 – effective immediately

End:      possibly Tuesday, June 29th, 2021

Building(s) or Area(s) Impacted:  Klamath Hall – 2nd, 3rd, 4th floors

Scope:  The restrooms on the 2nd, 3rd, and 4th floors have been shut down until at least Tuesday due to a leaking sewage pipe.  We are awaiting the arrival of parts needed to make the repairs.

Services Impacted:

  • Restrooms on the upper floors will be offline.
  • This is not expected to affect drinking fountains or lab sinks.

Special Instructions:  Please use the restrooms on the lower levels.

Work Performed By:  CPFM FS Plumbing Dept.

ContactKen Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

Willamette Hall Hot Water Shutdown 6/22/21

UPDATE:

The domestic hot and cold water have been restored.

 

Begin:  Tuesday, June 22nd, 2021 at 7:00 am

End:      Tuesday, June 22nd, 2021 at 3:00 pm

Building(s) or Area(s) Impacted:  Willamette Hall

Scope:  The hot water will be shut down in order to remove a 2.5” backflow assembly and install a bypass valve.  This will be done at the same time as the Steam Supply/Heating Water shutdown.

Services Impacted:

  • The hot water will be offline to sinks and restroom faucets.
  • The domestic cold water and the RO water will not be affected.

Work Performed By:  CPFM FS Plumbing Shop

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

Onyx Bridge Water Shutdown 6/9/21

Begin: Wednesday, June 9th, at 7:30 am

End: Wednesday, June 9th, at 4:00 pm

Building(s) or Area(s) Impacted:  Onyx Bridge

Scope:  The building water and the autoclave steam will be shut down in order to repair the acid waste line on the 3rd floor.

Services Impacted:  The autoclave steam, chilled water, domestic hot and cold water, hot water, and the RO/DI water will be offline.  This will affect restrooms, sinks, and drinking fountains.  Fire sprinklers will not be affected.

Work Performed By: CPFM FS Plumbing Shop

Contact: Ken Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

Streisinger Hall Domestic and Industrial Water Shutdown 6/3/21

Begin:  Thursday, June 3rd, 2021 at 9:00 am

End:      Thursday, June 3rd, 2021 at 9:30 am

Building(s) or Area(s) Impacted:  Streisinger Hall

Scope:  The cold water will be shut down for backflow testing in the Mechanical Room #190.

Services Impacted:

  • Cold water supply to Domestic Cold & Hot Water and the Industrial Cold & Hot Water, to the entire building, will be offline for approximately 30 minutes max.
  • RO water will not be effected.

Work Performed By:  CPFM FS Plumbing Shop

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

Oregon Hall Emergency Water Shutdown 4/23/21

UPDATE 4/23 at 9:45am: The water has been restored.

REVISED:

The repair is now requiring that the domestic cold and hot water to the entire building be shut down.  It is still expected to be done within the same time frame.  A notice will be sent when the water has been restored.

 

Begin:  Friday, April 23rd, 2021 – effective immediately

End:      Friday, April 23rd, 2021 – approximately 11:00 am

Building(s) or Area(s) Impacted:  Oregon Hall’s east side

Scope:  Emergency water shutdown to the east side of the building in order to repair a leak.

Services Impacted:  Restrooms and water fountains on the east side of the building on all floors

Extra Notes:  Please use the restrooms in nearby buildings

Work Performed By:  UO CPFM Facilities Services

ContactKen Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

Computing Center Emergency Water Shutdown 4/8/21

Begin:  Thursday, April 8th, 2021 at 7:30 am

End:      Thursday, April 8th, 2021 at 9:30 am

Building(s) or Area(s) Impacted:  Computing Center

Scope:  EWEB needs to change out a failed water meter, requiring an emergency shutdown of the building’s main water line.  UO staff will be on site to monitor the building alarm systems and mechanical equipment.

Services Impacted:  Water will be offline, affecting restrooms, sinks, drinking fountains, and the building fire sprinkler system.

Special Instructions: Any alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  EWEB

ContactKen Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

Metalsmithing Fine Arts Studio 125C Domestic Water Shutdown 3/16/21

Begin:  Tuesday, March 16, at 7:30 am

End:      Tuesday, March 16, at 12:00 noon

Building(s) or Area(s) Impacted:  Metalsmithing Fine Arts Studio

Scope:  Domestic cold and hot water will be shut down for plumbers to cap off water due to upcoming room changes.

Services Impacted:  All domestic water will be offline

Work Performed By:  CPFM Facilities Services Plumbing Shop

ContactKen Straw, Interim Mechanical & Plumbing Shop Manager, 541-346-5406

Willamette Hall Water Shut Off 2/16 – 2/16

2/22/21 Update for Willamette Hall:

The drying phase of the Willamette Hall Room 156 water intrusion has been completed. Equipment will be removed and the cove base restored today and tomorrow. Carpets in 160, 161, & 162 will then be shampooed and the furnishings removed to their original locations.

The restoration phase of this water intrusion will be managed by CPFM. Please contact CPFM Work Control if you have any questions.

2/19/21 Update:

This is an update to the notification sent on February 18, 2021, regarding the Willamette Hall Room 156 Water Intrusion.

The mitigation equipment has been set up in Willamette Hall, including H160, 160, and 161. The equipment will run for the weekend. We will reassess on Monday morning and remove the equipment as we can.

Please feel free to contact EHS, Adam Jones, 541.346.8397 if you have any questions.

 

A water intrusion has been identified in Willamette Hall. It is currently known to be affecting rooms H160, 160, & 161.

 This intrusion occurred on Tuesday, February 16, 2021 and was the result of a clogged drain in room 156. Impacts to walls and carpets were noted in rooms 160, 161, and H160.

 The mitigation process is tasked with drying all affected materials with the ultimate goal of limiting demolition and preventing mold growth. The mitigation process is managed by Environmental Health & Safety. Mitigation efforts onsite will be conducted by CPFM. During this period, you will see fans and well dryers set up, as well as dehumidification equipment. It is important that this equipment is left running at all times to ensure that impacted building materials are dried appropriately and in a timely fashion. Mitigation is anticipated to be complete by early next week.

 The reconstruction process is tasked with returning the space to finished and operational status. The reconstruction process is managed by CPFM.

 Both mitigation and reconstruction are conducted by University staff whenever possible to save money and reduce complications associated with the work. Outside contractors are used when mitigation or reconstruction scopes exceed our available staff or equipment resources. Further information on the University’s Water Intrusion process can be found by contacting Adam Jones at asjones@uoregon.edu.

Individual departments are responsible for inventorying damaged non-building related items, such as computers, office furnishings, lab equipment, etc. The Office of Risk Management within Safety & Risk Services is available to provide guidance, inventory forms, and other information on the insurance process associated with these claims. This information can be found at https://safety.uoregon.edu/property-claims.

Finally, all future updates associated with this event will be posted to the CPFM BLOG for the event at this link: https://blogs.uoregon.edu/cpfmnotifications/2021/02/16/willamette-hal-water-shut-off-2-16-unknown/

UPDATE: The building water has been restored.

Begin:  February 16, 2021 – Immediately

End:      Unknown – An update will be sent when the water has been restored.

Building(s) or Area(s) Impacted:  Willamette Hall

Scope:  All water in Willamette Hall is unusable. There was a sewage leak and all water to the building is shut off for repairs. This includes toilets, sinks, showers, drinking fountains, etc.

Services Impacted:  All building water.

Extra Notes: An update will be sent when the water has been restored.

Special Instructions: Do not use any water in the building.

Work Performed By:  FS Mechanical Shop

Contact: Richard Vaughan, CPFM Facilities Services, 541-346-2319

University Health Services Domestic Cold Water Shutdown 2/12/21

Begin:  Friday, February 12, 2021, at 5:00 pm

End:      Friday, February 12, 2021, at 10:00 pm

Building(s) or Area(s) Impacted:  University Health Services

Scope:  Contractors will be repairing a gasket in the basement. Work will be performed in the evening to avoid interrupting daytime usage.

Services Impacted:  The domestic cold water will not be available during this time.

Work Performed By:  Hydro-Temp Mechanical

ContactColin Brennan, Owner’s Representative, 541-346-8242

PeaceHealth North Building Domestic Water Shutdown 1/11/21

Begin:  Monday, January 11th, 2021 at 6:30 pm

End:      Monday, January 11th, 2021 at 10:30 pm

Building(s) or Area(s) Impacted:  PeaceHealth North Building

Scope:  A repair due to a leaking underground main domestic water line that serves the North building is needed.

Services Impacted:  The water will be shut off, affecting all plumbing fixtures including restrooms, sinks, and drinking fountains.

Extra Notes:  We are scheduling this work to start in the evening, and the estimated duration is 4 hours. This may take longer if the connection is not repairable.

Work Performed By:  PeaceHealth Contractors

ContactMelinda Seeley, CPFM Campus Planning, Real Estate Property Specialist, 541-346-5550

Pacific Hall Emergency Water Shutdown 1/6/21

UPDATE:

The broken water line has been repaired and the water has been restored.

 

Begin:  Wednesday, January 6th, 2021 effective at 10:00 am

End:      Wednesday, January 6th, 2021 till approximately 12:00 noon

Building(s) or Area(s) Impacted:  Pacific Hall

Scope:  EMERGENCY water shutdown due to a broken water line.  Expected to take approximately 2 hours to repair.

Services Impacted:  All water will be shut down in the building, including restrooms, sinks, and drinking fountains.

Work Performed By:  CPFM Facilities

ContactKen Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

 

Breezeway Restrooms and Room 116 Walkway Closure 12/17-1/8

Begin:  December 17, 2020

End:      January 8, 2021

Building(s) or Area(s) Impacted: Building 130

Scope: Due to continuing overhead work near the restrooms in Building 130, all breezeway restrooms and walkway (in room 116) will be closed effective immediately, through January 8th. We will work with custodial to allow access to their closet as needed.

Services Impacted:  Breezeway restrooms and walkway in room 116

Extra Notes: On Monday 12/21- two portable toilets will placed outside of the rollup door, for U of O employee use. The upstairs all gender bathroom will also be available.

Special Instructions: Please respect the caution tape and barriers that the contractor puts in place.

Work Performed By: Preferred Construction

Contact: Tim Allenbaugh, CPFM Project Manager, 541-346-8214

Campus Wide Soap Dispenser Installations for 12/4/20

Installations for 12/04/20:

Listed below are the buildings expected to be serviced Friday, December 4th, 2020.

Additional notification will be sent if installers are unable to finish on the projected date.

Streisinger (this includes TeACS – Dan Prutzman will escort.  Meet at loading dock 7:30 am)
Huestis (no entry: 208, 212, 227)
LISB (no entry: 174, 186A, 300, and 301)
Deschutes

If the installers have time they’ll move to the North side of Franklin in the Facilities Services compound.

ORIGINAL NOTICE

Begin: Monday, November 9th, 2020

End: Friday, December 4th, 2020

Building(s) or Area(s) Impacted: Campus Wide Academic Buildings

Scope: The manufacturer is discontinuing our current soap refills, so we are transitioning to a different soap dispenser across the academic campus. Since this transition is manufacturer caused, they are providing the contractor to do the install at no cost to the university.

Services Impacted: Temporary access to soap dispensers in restrooms, labs, teachings spaces, and kitchenettes.

Extra Notes: Each install will only take a few minutes but there are thousands across campus.

Work Performed By: Home Depot Pro

Contact: Tim Winder, CPFM FS Custodial Services Manager, 541-346-5771

Campus Wide Soap Dispenser Installations for 12/3/20

Installations for 12/03/20:

Listed below are the buildings expected to be serviced Thursday, December 3rd, 2020.
Additional notification will be sent if installers are unable to finish on the projected date.

Cascade Annex
Cascade Hall
Columbia Hall (no entry in 40, 57)
Pacific Hall (no entry in 1, 14, 109, 236, 310)
Volcanology (no entry in 302)
Willamette (no entry in 32, 61, 73, 106, 209, 256, 272, 363, 410A)

ORIGINAL NOTICE

Begin: Monday, November 9th, 2020

End: Friday, December 4th, 2020

Building(s) or Area(s) Impacted: Campus Wide Academic Buildings

Scope: The manufacturer is discontinuing our current soap refills, so we are transitioning to a different soap dispenser across the academic campus. Since this transition is manufacturer caused, they are providing the contractor to do the install at no cost to the university.

Services Impacted: Temporary access to soap dispensers in restrooms, labs, teachings spaces, and kitchenettes.

Extra Notes: Each install will only take a few minutes but there are thousands across campus.

Work Performed By: Home Depot Pro

Contact: Tim Winder, CPFM FS Custodial Services Manager, 541-346-5771

Campus Wide Soap Dispenser Installations for 12/2/20

Installations for 12/02/20:
Listed below are the buildings expected to be serviced Wednesday, December 2nd, 2020.
Additional notification will be sent if installers are unable to finish on the projected date.

Columbia Hall
Pacific Hall
Volcanology
Cascade Hall
Cascade Annex
Onyx Bridge
Price Science Commons

ORIGINAL NOTICE

Begin: Monday, November 9th, 2020

End: Friday, December 4th, 2020

Building(s) or Area(s) Impacted: Campus Wide Academic Buildings

Scope: The manufacturer is discontinuing our current soap refills, so we are transitioning to a different soap dispenser across the academic campus. Since this transition is manufacturer caused, they are providing the contractor to do the install at no cost to the university.

Services Impacted: Temporary access to soap dispensers in restrooms, labs, teachings spaces, and kitchenettes.

Extra Notes: Each install will only take a few minutes but there are thousands across campus.

Work Performed By: Home Depot Pro

Contact: Tim Winder, CPFM FS Custodial Services Manager, 541-346-5771

Campus Wide Soap Dispenser Installations for 11/23/20

Installations for 11/23/20:
Listed below are the buildings expected to be serviced Monday, November 23rd, 2020.
Additional notification will be sent if installers are unable to finish on the projected date.

Installers will be escorted by the occupants of the below spaces:
Streisinger/LISB Animal Research Lab
Lokey Labs – Tenant occupied areas
Zebrafish International Resource Center

Based on arrival time determined by the above installations, the buildings listed below may be pushed off till the next day:
Lillis
Chiles
Peterson
Anstett

ORIGINAL NOTICE

Begin: Monday, November 9th, 2020

End: Friday, December 4th, 2020

Building(s) or Area(s) Impacted: Campus Wide Academic Buildings

Scope: The manufacturer is discontinuing our current soap refills, so we are transitioning to a different soap dispenser across the academic campus. Since this transition is manufacturer caused, they are providing the contractor to do the install at no cost to the university.

Services Impacted: Temporary access to soap dispensers in restrooms, labs, teachings spaces, and kitchenettes.

Extra Notes: Each install will only take a few minutes but there are thousands across campus.

Work Performed By: Home Depot Pro

Contact: Tim Winder, CPFM FS Custodial Services Manager, 541-346-5771

Campus Wide Soap Dispenser Installations for 11/22/20

Installations for 11/22/20:

Listed below are the buildings expected to be serviced Sunday, November 22nd, 2020.

These areas are being completed during irregular hours to avoid contact with patients, clients, and school age children, partially due to occupancy levels of the buildings and partially due to security and confidentiality issues that arise during normal business hours.

Additional notification will be sent if installers are unable to finish on the projected date.

Rainier
UOPD
University Health Center
Moss St. Childcare
Vivian Olum Childcare
Clinical Services Building
HEDCO Clinic
Computing Center

ORIGINAL NOTICE

Begin: Monday, November 9th, 2020

End: Friday, December 4th, 2020

Building(s) or Area(s) Impacted: Campus Wide Academic Buildings

Scope: The manufacturer is discontinuing our current soap refills, so we are transitioning to a different soap dispenser across the academic campus. Since this transition is manufacturer caused, they are providing the contractor to do the install at no cost to the university.

Services Impacted: Temporary access to soap dispensers in restrooms, labs, teachings spaces, and kitchenettes.

Extra Notes: Each install will only take a few minutes but there are thousands across campus.

Work Performed By: Home Depot Pro

Contact: Tim Winder, CPFM FS Custodial Services Manager, 541-346-5771

Campus Wide Soap Dispenser Installations for 11/20/20

Installations for 11/20/20:
Listed below are the buildings expected to be serviced Friday, November 20th, 2020.
Additional notification will be sent if installers are unable to finish on the projected date.

Baker Downtown
510 Oak
942 Olive
EC Cares

ORIGINAL NOTICE

Begin: Monday, November 9th, 2020

End: Friday, December 4th, 2020

Building(s) or Area(s) Impacted: Campus Wide Academic Buildings

Scope: The manufacturer is discontinuing our current soap refills, so we are transitioning to a different soap dispenser across the academic campus. Since this transition is manufacturer caused, they are providing the contractor to do the install at no cost to the university.

Services Impacted: Temporary access to soap dispensers in restrooms, labs, teachings spaces, and kitchenettes.

Extra Notes: Each install will only take a few minutes but there are thousands across campus.

Work Performed By: Home Depot Pro

Contact: Tim Winder, CPFM FS Custodial Services Manager, 541-346-5771

Campus Wide Soap Dispenser Installations for 11/19/20

Installations for 11/19/20:

Listed below are the buildings expected to be serviced Thursday, November 19th, 2020.
Additional notification will be sent if installers are unable to finish on the projected date.

Agate
Baker Downtown
Black Cultural Center
Knight Law
LERC
Longhouse
Thompson University Center

 

ORIGINAL NOTICE

Please share with building occupants

Begin: Monday, November 9th, 2020

End: Friday, December 4th, 2020

Building(s) or Area(s) Impacted: Campus Wide Academic Buildings

Scope: The manufacturer is discontinuing our current soap refills, so we are transitioning to a different soap dispenser across the academic campus. Since this transition is manufacturer caused, they are providing the contractor to do the install at no cost to the university.

Services Impacted: Temporary access to soap dispensers in restrooms, labs, teachings spaces, and kitchenettes.

Extra Notes: Each install will only take a few minutes but there are thousands across campus.

Work Performed By: Home Depot Pro

Contact: Tim Winder, CPFM FS Custodial Services Manager, 541-346-5771

Campus Wide Soap Dispenser Installations 11/9/20 – 12/4/20 & 1/11/21 – completion

1/08/2021 UPDATE:

Due to issues in the supply chain and acquiring product, this project was postponed and is now ready to begin again the week of January 11th , 2021.

 

Begin:  Monday, November 9th, 2020

End:     Friday, December 4th, 2020

Building(s) or Area(s) Impacted:  Campus Wide Academic Buildings

Scope:  The manufacturer is discontinuing our current soap refills, so we are transitioning to a different soap dispenser across the academic campus. Since this transition is manufacturer caused, they are providing the contractor to do the install at no cost to the university.

Services Impacted:  Temporary access to soap dispensers in restrooms, labs, teachings spaces, and kitchenettes.

Extra Notes:  Each install will only take a few minutes but there are thousands across campus.

Work Performed By:   Home Depot Pro

ContactTim Winder, CPFM FS Custodial Services Manager, 541-346-5771

Agate Hall 2nd Floor Restrooms Shutdown 10/22/20 – 1/31/21

UPDATE 10/26: This is an informational notice regard the second floor bathrooms in Agate Hall, rooms 201 & 223. Due to sealcoat failure on the floors, the bathrooms will be taken offline while the flooring is repaired or replaced. The lower layers of flooring contain asbestos, and there is concern that if the sealcoat continues to be impacted, the asbestos layers may start getting impacted as well. This decision is being made out of an abundance of caution, and the asbestos layer has not yet been impacted at this time. EHS and CPFM are currently working out repair or replacement options. We will provide additional information as we figure out our plan.

In the meantime, please use the first floor restrooms. Please feel free to contact me if you have questions.

Begin:  Thursday, October 22nd, 2020 – Effective immediately

End:      Unknown January 31, 2021

Building(s) or Area(s) Impacted:  Agate Hall Men’s Restrooms #201 & 223

Scope:  The Men’s second floor restrooms #201 & 223, have been closed for emergency repairs/construction.

Services Impacted:  Second floor Men’s restrooms shut down.

Special InstructionsPlease use Men’s restroom #125 on the south end of the building of the 1st floor, or the All-Gender restroom #125A, which is located next to it. Please use the first floor restrooms.

Work Performed By:   CPFM Facilities and a contractor

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

CPFM Warehouse and Shops Air Handler/Ducting Installation Advisory 10/19/20 – 12/15/20

Building or Area Impacted:  CPFM Warehouse and Shops

Scope:  An air handler/ducting installation project.

Project Duration:  Monday, October 19th, 2020 through Tuesday, December 15th, 2020

Scope Specific to Monday 10/19/20 from 8:00 am to 5:00 pm:  Large HVAC equipment will be lifted up onto the platform above the restrooms.

Services Impacted on Monday 10/19/20:  The following areas will be intermittently inaccessible due to overhead work:

  • Warehouse breezeway (H109)
  • Open workspace (room 116)
  • Restrooms (118, 117A, 117B, 117C, 117D, and 118)

Work Performed By:   Preferred Construction and Hydro-Temp

ContactTim Allenbaugh, CPFM Project Manager, 541-346-8214