CPFM Warehouse and Shops Air Handler/Ducting Installation Advisory 10/19/20 – 12/15/20

Building or Area Impacted:  CPFM Warehouse and Shops

Scope:  An air handler/ducting installation project.

Project Duration:  Monday, October 19th, 2020 through Tuesday, December 15th, 2020

Scope Specific to Monday 10/19/20 from 8:00 am to 5:00 pm:  Large HVAC equipment will be lifted up onto the platform above the restrooms.

Services Impacted on Monday 10/19/20:  The following areas will be intermittently inaccessible due to overhead work:

  • Warehouse breezeway (H109)
  • Open workspace (room 116)
  • Restrooms (118, 117A, 117B, 117C, 117D, and 118)

Work Performed By:   Preferred Construction and Hydro-Temp

ContactTim Allenbaugh, CPFM Project Manager, 541-346-8214