4/1/24 Huestis Hall and Lokey Labs Electrical Distribution System Testing Advisory

Begin:  Monday, April 1, 2024, at 11:00 am

End:      Monday, April 1, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Huestis Hall and Lokey Labs

Scope:  EC Electric will conduct a closed transition test on the main electrical distribution system.

Services Impacted:  No impacts are expected, but there is a slight chance of a full electrical outage.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.  For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu.  For non-copier questions, please reach out to the contact person listed below.

Work Performed By:  EC Electric

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impact information can be found on the UO Maps site.

Huestis and Lokey Labs Overhead Map

3/29/24 – 4/05/24 Riverfront Sports Field Top Dress and Leveling Work Advisory

Begin:  Friday, March 29, 2024

End:      Friday, April 5, 2024

Building(s) or Area(s) Affected:  Riverfront Sports Field

Scope:  Top dress and leveling will take place on the Riverfront Sports Field.  200-tons of turf top-dress material is expected to be delivered 3/29/24 and/or 4/1/24.  Work on the field is scheduled to begin the week of 4/01/24.

Services Impacted:  Work related noise can be expected.  Roadways and sidewalks in the surrounding area will also be impacted.

Work Performed By:  Rexius Landscape

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Riverfront Fields

3/28/24 Fine Arts Studio C and Woodshop Fire Alarm Work Advisory

UPDATE:
The fire alarm work is complete, and the system is back online.

 

Begin:  Thursday, March 28, 2024, at 6:00 am

End:      Thursday, March 28, 2024, at 6:00 pm

Building(s) or Area(s) Affected:  Fine Arts C and Woodshop

Scope:  Due to installation of new fire alarm components, the fire alarm will be offline at Fine Arts C and Woodshop buildings.  Contractor will perform fire watch for the duration that the fire alarm is offline.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  IES

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Image of Fine Arts Studio C and Woodshop

3/26/24 – 3/27/24 Spring Break Grease Trap Cleaning Odor Advisory

2nd UPDATE:
Work will also take place at the Price Science Commons Café at 3:00 pm.

 

UPDATE:
Work at the EMU will take place at 7:00 pm.

 

Begin:  Tuesday, March 26, 2024

End:      Wednesday, March 27, 2024

Scope:  Housing and Dining will have a contractor clean the grease traps in select areas – see schedule below

Buildings and Schedule:

Tuesday, March 26th

  • 3:00 pm –        Ford Alumni
  • 6:00 7:00 pm – EMU

Wednesday, March 27th

  • 10:30 am –        Tykeson Hall
  • 12:00 noon –    Knight Library
  • 1:00 pm –          HEDCO
  • 2:00 pm –         Lawrence Hall

Services Impacted:  Noise can be expected in the area, along with the possibility of encountering unpleasant odors outside the building with potential drift inside via entryways.

Work Performed By:  Roto Rooter

ContactFarrah Meade, University Housing, HCS & Work Control Manager, 541-346-4082

Map of academic buildings affected by grease trap cleaning 3/27/24 - 3/28/24

4/23/24 – 4/26/24 Huestis Hall Rooms 11 and 12 Light Fixture Replacement Advisory

UPDATE:
This work has been rescheduled for next week, April 23 – 26, to align with facility schedules.

  • Room 011 will be offline each day between 7:00 am and 1:00 pm
  • Room 012 will be offline each day between 12:00 noon and 4:00 pm

 

BeginApril 15  Tuesday, April 23, 2024

End:      April 19   Friday, April 26, 2024

Building(s) or Area(s) Affected:  Huestis Hall

Scope:  Light fixtures will be replaced in rooms #011 and #012.

Services Impacted:  Users are encouraged to find alternate spaces during the days the lights are offline.

Work Performed By:  EC Electric

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall rooms 11 and 12

4/17/24 – 4/23/24 Chapman Hall West Entry Closure Advisory

UPDATE 4/12/24:
This work has been rescheduled for Wednesday, April 17th, through Tuesday, April 23rd, from 8:30 am to 4:00 pm.

 

UPDATE 3/26/24:
The installation of the doors has been postponed due to a shortage of staff.  An update will be sent when it has been rescheduled.

 

BeginMarch 25, 2024, at 8:30 am   Postponed   Wednesday, April 17, 2024, at 8:30 am

End:      March 29, 2024, at 4:00 pm   Postponed   Tuesday, April 23, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  Chapman Hall

Scope:  Refurbished doors will be installed, and the door frame and trim will be refinished.

Services Impacted:  West entry will be closed.

Special Instructions:  Use an alternative entrance.

Work Performed By:  CPFM Lock and Door Shop and Contractor

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead view of Chapman

3/20/24 – 3/29/24 Fine Arts Studios A, B, and C Emergency Steam Shutdown

UPDATE 3/29/24:
This work is complete, and the steam has been restored.

 

Begin:   Wednesday, March 20, 2024, at 11:00 am

End:      Unknown    Friday, March 29, 2024

Building(s) or Area(s) Affected: Fine Arts A Sculpture, Fine Arts B Foundry, and Fine Arts C Ceramics

Scope:   Due to a possible water leak into the steam vault on the west side of building B, the steam heat will be shut down to the building.

Services Impacted:

  • Steam heat will be offline during this time.
  • Work will take place in the utilities vault on the west side of the Fine Arts B building.

Work Performed By:  CPFM Utilities & Energy

Contact:   Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Fine Arts Studios A, B, and C

3/25/24 – 3/28/24 Fine Arts A, B, C, Woodshop, and Urban Farm Domestic and Irrigation Water Shutdown

UPDATE 3/28/24:
This work is complete, and the water is back online to all buildings.

 

UPDATE:

  • The building water shutdown will extend to end of day tomorrow, March 28th.   CPFM has additional work to perform tomorrow to repair a leaking water line.
  • Irrigation water will be back on end of day today as planned.

 

 

 

Begin: Monday, March 25, 2024, at 7:00 am

End: Wednesday, March 27  Thursday, March 28, 2024, at 6:00 pm

Building(s) or Area(s) Affected: Fine Arts A, Fine Arts B, Fine Arts C, Woodshop, and Urban Farm

Scope: In order to reconfigure underground water piping, building water and irrigation water will be shutdown. Work will include the use of vacuum excavation equipment.

Services Impacted:

  • Work to be performed during Spring Break in order not to impact classes.
  • Domestic water and irrigation water will be offline during this time.
  • Systems will come back online as soon as possible.

Work Performed By: Hoffman Construction

Contact: Denise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Image of Fine Arts Studios, Woodshop, and Urban Farm

3/25/24 – 3/29/24 Klamath Hall Air Velocity and Volume Measurements Advisory

Begin:  Monday, March 25, 2024

End:      Friday, March 29, 2024

Building(s) or Area(s) Affected:  Klamath Hall Basement, 1st, and 2nd floors

Scope:  The air balancing contractor will make final adjustments to the lab exhaust air systems. Work will include taking air velocity and volume measurements in ductwork, exhaust grilles, and fume hoods. Room air pressures will also be measured relative to adjacent spaces and/or the corridor.

Services Impacted: The lab exhaust fans will remain active during these activities; the only disruptions will be the contractor taking measurements in rooms.

Work Performed By:  Contractor

ContactKevin Waldrop, CPFM Facilities Engineer, 541-346-2315 or 541-525-4326

Current construction and impacts information can be found on the UO Maps site.

Overhead picture of Klamath

3/25/24 – 3/26/24 Knight Law Center Furniture Move/Installation Advisory

Begin: Monday, March 25, 2024, at 8:00 am

End: Tuesday, March 26, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  Knight Law Center

Scope: Furniture moves and installations will take place in the main common space.

Services Impacted: This will affect the Atrium area and the 1st and 2nd floors (see diagram below).

Work Performed By: Office World and CPFM Facilities Services

Contact: Brianna Liberty, CPFM D&C Design Associate, 541-346-7612 or 541-556-9618

Current construction and impacts information can be found on the UO Maps site.

Image of areas affected during Knight Law Center's furniture move 3/25/24 - 3/26/24

3/18/24 – 3/29/24 Student Tennis Center, Jane Sanders Stadium, Outdoor Tennis Courts, and Athletic Field 2 Sidewalk Closure

Begin:  Monday, March 18, 2024, at 7:00 am

End:      Friday, March 29, 2024, at 6:00 pm

Building(s) or Area(s) Affected:  Sidewalk and path by Student Tennis Center, Jane Sanders Stadium, Outdoor Tennis Courts, and Athletic Field 2

Scope:  The sidewalk and pathway by the Student Tennis Center, Jane Sanders Stadium, Outdoor Tennis Courts, and Athletic Field 2 will be replaced.

Services Impacted:  The pathway will be closed to through travel including bikes and pedestrians.

Work Performed By:  Wildish Construction

ContactRenee Benoit, CPFM Owner’s Representative, 541-346-5080

Current construction and impacts information can be found on the UO Maps site.

Sidewalk closure map by the tennis courts and Jane Sanders Stadium 3/18/24 - 3/29/24

3/15/24 Friendly Hall Emergency Restroom and Drain Shutdown

UPDATE: 
The system has been restored to service.

 

Begin:  Friday, March 15, 2024 – effective immediately

End:      Friday, March 15, 2024 – unknown 4:00 pm

Building(s) or Area(s) Affected:  Friendly Hall

Scope:  The drains are offline and Roto Rooter is headed over to unclog the system.  An update will be sent when service has been restored.

Services Impacted:  Restrooms, sinks, and drinking fountains are offline at this time.

Special Instructions:  Please use the facilities in adjacent buildings.

Work Performed By:  Roto Rooter

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Friendly Hall

3/14/24 – Unknown – Willamette Hall Room 32 Emergency Fume Hood Shutdown

Begin:  Thursday, March 14, 2024 – effective immediately

End:      Unknown

Building(s) or Area(s) Affected:  Willamette Hall room 32

Scope:  The fume hoods in room 32 will be down for at least three (3) days as they troubleshoot the low air issue.  An update will be sent when service has been restored.

Services Impacted:  Room 32 fume hoods are unavailable during this time.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Willamette Hall Room #32

Campus Building Locking Schedule for Spring Break 2024

Facilities Liaisons:

The purpose of this email is to share details of the door lock procedure for the Spring academic break schedule for 2024. This procedure is designed to protect against theft and vandalism while also providing access to specific public facing buildings on the UO’s campuses, as follows:

  • Most university building doors will be locked during observed holidays and academic breaks (including Spring Break 2024) as defined below.
  • Some buildings with public facing services may not be subject to the locking schedule, especially during this academic break. These buildings are listed on the website in the Exceptions list. (Please note that Price Science Commons is also included in this list even though it is not listed on the Exceptions list Website.)
  • Faculty, staff, and student employees should already have either keys or prox card access to enter buildings during these times. Departments have authorized individuals who can request access for those who may need it for the Break period.
  • Finance and Admin Shared Services IT (FASS IT) will send reminders out through the Facility Liaison list as a reminder prior to each of the door locking dates. Those reminders will include instructions for adding prox card access for those who may need it.
  • No changes will be made to regular individual access, so anyone with existing access will still be able to access their normal locations.

Please note that during the Spring Break period (i.e., closing time on Friday, March 22nd until Monday, April 1st at 7:00 A.M.) most buildings on campus will be closed and locked.

Authorized individuals may request exceptions to the locking procedure by meeting specific criteria listed in the procedure. Requests for exceptions can be submitted to FASS IT by calling 541-346-2245 or by emailing fass@uoregon.edu, providing as much advance notice as possible, and noting which exception criteria their situation(s) meets. FASS-IT will consult with the Campus Vulnerability Assessment Team on approval of exemptions.

Please feel free to reach out if you have any questions. My email address is: carl.peaster@uopd.org

Thank you!

Carl Peaster | Director of Physical Security
University of Oregon Police Department

Image of Eugene Campus

3/19/24 Hayward Field Annual Fire Alarm Testing

Begin:  Tuesday, March 19, 2024, at 6:00 am

End:      Tuesday, March 19, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  Hayward Field

Scope:  Annual fire alarm testing will take place next Tuesday.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  UO Safety & Risk Services

ContactMichael Brooks, UO SRS Fire Safety Officer, 541-346-5573

Current construction and impacts information can be found on the UO Maps site.

Image of Hayward Field

3/15/24 Willamette Hall Fire Alarm System Testing Advisory

Begin:  Friday, March 15, 2024, at 6:00 am

End:      Friday, March 15, 2024, at 8:00 am

Building(s) or Area(s) Affected:  Willamette Hall

Scope:  Due to a recent remodel in room 154, the fire alarm system will be tested.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  IES

ContactWaymon Banks, CPFM Owner’s Representative, 541-346-0196

Current construction and impacts information can be found on the UO Maps site.

Image of Willamette Hall

3/16/24 – 3/28/24 Huestis Hall AHU Shutdown

Begin:  Saturday, March 16, 2024

End:      Thursday, March 28, 2024

Building(s) or Area(s) Affected:  Huestis Hall

Scope:  Huestis Hall AHU will be shut down for final modifications and resurfacing of the penthouse traffic coating.

Services Impacted:

  • This will affect the exhaust and HVAC air supply.
  • The application of the traffic coating material may cause an odor.

Work Performed By:  Lease Crutcher Lewis

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall

3/18/24 Streisinger Hall 4th Floor Window Replacement Advisory

Begin:  Monday, March 18, 2024, at 8:00 am

End:      Monday, March 18, 2024, at 10:00 am

Building(s) or Area(s) Affected:  Streisinger 4th Floor Hallway

Scope:  Culver Glass will remove and replace a broken window in the 4th floor hallway.

Services Impacted:  Expect congestion in the hallway and noise in surrounding areas.

Work Performed By:  Culver Glass Company

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map of Streisinger Hall

3/13/24 Friendly Hall Emergency Steam Shutdown

UPDATE:
Steam has been restored to the building.

 

Begin:  Wednesday, March 13, 2024, at 9:00 am

End:      Wednesday, March 13, 2024, at 2:00 pm 11:45 am

Building(s) or Area(s) Affected:  Friendly Hall

Scope:  The steam will be turned off to make emergency repairs for an overheating radiator.

Services Impacted:  Heat will be offline during this time.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Friendly Hall

3/25/24 McArthur Court Fire Alarm and Fire Sprinkler Annual Service Advisory

Begin: Monday, March 25, 2024, at 6:00 am

End:     Monday, March 25, 2024, at 8:30 am

Building(s) or Area(s) Affected:  McArthur Court

Scope:  The annual fire alarm and fire sprinkler service will be performed by Safety & Risk Services. Alarms will sound during these tests.

Details: Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions: If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By: UO Safety & Risk Services

Contact: Michael Brooks, UO SRS Fire Safety Officer, 541-346-5573

Current construction and impacts information can be found on the UO Maps site.

Image of McArthur Court

3/28/24 Frohnmayer Music Intermittent HVAC Interruption Advisory

Begin:  Thursday, March 28, 2024, at 8:00 am

End:      Thursday, March 28, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  Frohnmayer Music

Scope:  To maintain reliability of the Building Automation System controllers, Siemens will be performing firmware updates on control panels.

Services Impacted:  Intermittent outages to HVAC and exhaust systems are to be expected.

Work Performed By:  Siemens

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Frohnmayer Music

3/26/24 Willamette Hall Intermittent HVAC Interruption Advisory

Begin:  Tuesday, March 26, 2024, at 12:00 noon

End:      Tuesday, March 26, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  Willamette Hall

Scope:  To maintain reliability of the Building Automation System controllers, Siemens will be performing firmware updates on control panels.

Services Impacted:

  • Expect intermittent outages to HVAC and exhaust systems serving the laser lab spaces listed.
    • Laser Lab Rooms: 35, 36, 37, 38, 41A, 41B, 41C, and 100.
  • System interruptions are typically very short duration, but occupants should plan for an outage lasting the full 4 hours.
  • Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Work Performed By:  Siemens

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Willamette Hall

 

3/26/24 Streisinger Hall Intermittent HVAC Interruption Advisory

Begin:  Tuesday, March 26, 2024, at 8:00 am

End:      Tuesday, March 26, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Streisinger Hall

Scope:  To maintain reliability of the Building Automation System controllers, Siemens will be performing firmware updates on control panels.

Services Impacted:

  • Intermittent outages to HVAC and exhaust systems are to be expected.
  • This will affect the cooling, exhaust, heating, and HVAC air supply.
  • Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Work Performed By:  Siemens

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Streisinger Hall

 

3/26/24 University Health Services Intermittent HVAC Interruption Advisory

Begin:  Tuesday, March 26, 2024, at 8:00 am

End:      Tuesday, March 26, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  University Health Services

Scope:  To maintain reliability of the Building Automation System controllers, Siemens will be performing firmware updates on control panels.

Services Impacted:

  • Intermittent outages to HVAC and exhaust systems are to be expected.
  • This will affect the cooling, exhaust, heating, and HVAC air supply.
  • Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Work Performed By:  Siemens

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of University Health Services

3/25/24 Lokey Labs Intermittent HVAC Interruption Advisory

Begin:  Monday, March 25, 2024, at 8:00 am

End:      Monday, March 25, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Lokey Labs

Scope:  To maintain reliability of the Building Automation System controllers, Siemens will be performing firmware updates on control panels.

Services Impacted:

  • Intermittent outages to HVAC and exhaust systems are to be expected.
  • This will affect the cooling, exhaust, heating, and HVAC air supply.
  • Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Work Performed By:  Siemens

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Lokey Labs