3/18/24 – 3/29/24 Student Tennis Center, Jane Sanders Stadium, Outdoor Tennis Courts, and Athletic Field 2 Sidewalk Closure

Begin:  Monday, March 18, 2024, at 7:00 am

End:      Friday, March 29, 2024, at 6:00 pm

Building(s) or Area(s) Affected:  Sidewalk and path by Student Tennis Center, Jane Sanders Stadium, Outdoor Tennis Courts, and Athletic Field 2

Scope:  The sidewalk and pathway by the Student Tennis Center, Jane Sanders Stadium, Outdoor Tennis Courts, and Athletic Field 2 will be replaced.

Services Impacted:  The pathway will be closed to through travel including bikes and pedestrians.

Work Performed By:  Wildish Construction

ContactRenee Benoit, CPFM Owner’s Representative, 541-346-5080

Current construction and impacts information can be found on the UO Maps site.