12/27/22 – 12/30/22 Knight Library #57, 19, H57 Renovation Advisory

Begin:  Tuesday, December 27th, 2022

End:      Friday, December 30th, 2022

Building(s) or Area(s) Affected:  Knight Library Rooms 19, 57, and Hallway H57

Scope:  Abatement, demolition, and renewal will occur for rooms 19, 57, and hallway H57, while they receive new lighting, flooring, paint, and electrical.

Services Impacted:

  • ADA access will be impacted from the NW lower entrance to the elevator.
  • Construction noise and odor can be expected during this time.

Work Performed By:  PMG Demolition and CPFM Facilities Services

ContactJanell Cottam, CPFM Owner’s Representative, 541-346-7536

Current construction and impacts information can be found on the UO Maps site.

12/20/22 – 12/21/22 Onyx Bridge East Elevator Not Going to Upper Floors

Begin:  Tuesday, December 20th, 2022 – effective immediately

End:      Wednesday, December 21st, 2022 – unknown

Building(s) or Area(s) Affected:  Onyx Bridge

Scope:  The east elevator will not take passengers up to the upper floors but will still bring them down when called.  It will go to the ground and basement without any problems.  Otis has looked at it and we are waiting for service to be restored tomorrow, 12/21/22.

Services Impacted:  The east elevator is limited.

Special Instructions:  Please use the other nearby elevators or stairs.

Work Performed By:  Otis Elevator

For questions or concerns, please contact Work Control Center at 541-346-2319 or workcontrolcenter@uoregon.edu.

12/19/22 Feeder 1 Electrical Shutdown

Begin:  Monday, December 19th, 2022, at 7:00 am

End:    Monday, December 19th, 2022, at 8:00 am

Buildings:  Unthank Hall, Bean Hall, Global Scholars, Kalapuya Ilihi, Ford Alumni, Matt Knight Arena.

Scope:  Feeder 1 will be shut down to connect the HWTP Phase 2 Project to campus power.

Services Impacted:

  • This will affect main power and elevators, however these buildings will be on standby power during this time.
  • This will not impact Hayward Field.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  Oregon Electric Group and CPFM U&E

ContactGeorge Bleekman, CPFM Owner’s Representative, 541-346-2625

Current construction and impacts can be found on the UO Maps site.

12/14/22 Fenton and Ford Alumni Elevator Shutdown

Begin:  Wednesday, December 14, 2022, at 8:00 am

End:   Wednesday, December 14, 2022 at 5:00 pm

Building(s): Fenton Hall (first) and Ford Alumni (second)

Scope:  The elevators will be shut down to finish year end code requirements.

Services Impacted:  The elevators will be out of service.

Work Performed By:  Otis Elevator

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

To view current construction and impacts, please see the UO Map.

 

12/12/22 – 12/13/22 Lewis Integrative Science Building NW Elevator Currently Offline

UPDATE:
The elevator was restored to service this morning.

 

Begin:  Monday, December 12th, 2022 – effective immediately

End:      Monday, December 12th, 2022 – this evening

Building(s) or Area(s) Affected:  Lewis Integrative Science Building NW Elevator

Scope:  The NW elevator is currently offline and an Otis technician is on his way.  Repairs are expected to be completed this evening.

Services Impacted:  Elevator to the basement is not working.

Work Performed By:  Otis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

12/12/22 -1/6/23 Lokey Education Elevator and Restrooms Shutdown Advisory

UPDATE 12/29/22:  Due to unexpected delays the completion date for this work is now scheduled for 1/6/23

Begin:  Monday, December 12, 2022

EndFriday, December 30, 2022 Friday, January 6th, 2023

Building Affected:  Lokey Education Restrooms #172, #173, #272, #273

Scope:  Due to the elevator modernization project, and associated ongoing construction, the first and second floor restrooms immediately adjacent to the elevator will be closed for the duration of Winter Break. In addition, the elevator will be out of service during this time.

Services Impacted:

  • Restrooms #172, #173, #272, #273 will be shut down.  Please see map below for nearby facilities in HEDCO.
  • The elevator will be offline.  Please use the stairs to the north of the elevator or by classroom 176.

Work Performed By:  Ryan Thomas construction

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

Current construction and impacts information can be found on the UO Maps site.

11/28/22 – 11/29/22 13th Avenue Garage Elevator #2 Emergency Repair Shutdown

UPDATE 11/29/22
The elevator has been repaired and returned to service.

 

Begin:  Effective immediately – Monday, November 28th, 2022

End:   Possibly Tuesday, November 29th, 2022 or Wednesday, Nov. 30th, 2022

Building(s) or Area(s) Affected:  13th Avenue Garage

Scope:  Elevator #2 has been shut down for repairs.  Parts have been ordered and are expected to arrive tomorrow or Wednesday.

Services Impacted:  Elevator #2 is offline.  Please use the other elevator or stairs.

Work Performed By:  Otis Elevator

ContactRob Berg, CPFM Facilities Electrical Supervisor, 541-346-2313

Information on current construction and impacts can be located on UO Maps

10/07/22 – Unknown – Elevator Shutdown Jordan Schnitzer Museum Of Art

Begin: Effective Immediately – Friday, October 7th, 2022

End:    Unknown

Building Impacted:  Museum of Art

Scope:  The elevator is non-responsive and the Otis elevator technician has ordered the parts.  An update will be sent when services have been restored.

Services Impacted: The elevator is currently out-of-order.

Work Performed By: Otis

Contact: Work Control Center, Campus Planning and Facilities Management, 541-346-2319

9/28/22 – 3/31/23 Access Advisory Basement of Huestis Hall and Lokey Labs

UPDATE 3/16/23:
The scaffolding will remain in place until March 31, 2023.

 

UPDATE 12/16/22:
Revised Date:  November 30, 2022 December 19, 2022  – March 13 31, 2023:  Scaffolding will be in place over head of the hallway ramp, access will be maintained between Huestis and Lokey.

 

Begin:  September 28, 2022

End:  March 31, 2023

Building(s) or Area(s) Affected:  Elevators, Hallway & Lifts

Scope:  As part of the demolition and seismic work associated with the Huestis Hall Renovation project, attached is a map of upcoming work activities that affect access between the basement of Huestis Hall and Lokey Labs.

  • September 28 – November 29, 2022: The gantry crane area will be blocked off and the hallway ramp will be narrowed as the Huestis elevator is decommissioned and removed. (orange)  COMPLETE
  • November 30, 2022 December 19, 2022 – March 13 31, 2023: Scaffolding will be in place over head of the hallway ramp, access will be maintained between Huestis and Lokey. (red)
  • December 1 – 16, 2022: The south side of the hallway ramp will be under containment. The corridor width will be narrowed, but cart access to the Zebrafish Facility will be maintained. (orange)
  • December 19 – February 6, 2023: The north side of the hallway ramp will be under containment. The corridor width will be narrowed, but cart access to the Zebrafish Facility will be maintained. (blue)

Work Performed By:  Lease Crutcher Lewis

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

22.09.22 Basement Disruption Notice (1)

 

9/14/22 Planned Power Outage

UPDATE:
Utilities & Energy has switched from island mode back to the normal power configuration as planned.
Please report any issues caused by the outage, including IT, to the CPFM Work Control Center at 541-346-2319,  workcontrolcenter@uoregon.edu, or by entering a service request on the UO call log https://cgis.uoregon.edu/Calllog.
Thank you.

 

 

We are writing to remind you of the upcoming annual planned power outage on Wednesday, September 14th, 2022.

In the event our campus service from the local EWEB electrical grid is interrupted, the UO Utility and Energy plant is capable of providing the campus with electricity (called Island Mode). To best ensure this system operates as designed when needed, the Utility and Energy plant now exercises this system annually. This year’s Island Mode event will take place on Wednesday, September 14, 2022, at 7:35 am. 

At 7:35 am, the entire campus will shift from the primary EWEB power source to the backup generator system at the Central Power Station, also known as “Island Mode”.

While not anticipated, some buildings may briefly lose power when the switch occurs, if a portion of the system does not perform as expected.

At 7:45 am, Feeder 1 will be de-energized.  Affected buildings will experience a  power outage lasting approximately 1 hour.  During this time Utilities and Energy staff will be disconnecting power in a vault for a switch replacement project and exchanging the feeder breaker. Crews will then ensure systems are successfully coming back online.

At 9:00 am, Feeder 10 will be de-energized.  Affected buildings will experience a power outage lasting 15 minutes. During this time Utilities and Energy staff will be exchanging the feeder breaker.  Crews will then ensure systems are successfully coming back online.

At 10:00 am, Standby feeder 2 will be de-energized. This will have no affect to the campus buildings.

At 12:00 noon, Utilities and Energy will Initiate normal power configuration.

For a detailed schedule of feeders and maps of buildings affected, visit the 2022 Power Outage webpage. Updates about the project will be posted on that page and Around the O.

Individuals who wish to request planning assistance for the outages should contact Campus Planning and Facilities Management Work Control at workcontrolcenter@uoregon.edu or 541-346-2319.

Please remember to shut down all multi-function copier devices as well as any printers. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

To view current construction and impacts. visit UO Map.

9/01/22 – 9/02/22 Allen Hall Elevator Shutdown

Begin:  Thursday, September 1st, 2022

End:      Friday, September 2nd, 2022

Building(s) or Area(s) Affected:  Allen Hall

Scope:  The elevator will be shut down for the State required 5-year full load test.  A notice will be sent when the elevator is back online.

Services Impacted:  The elevator will be offline during this time.

Work Performed By:  Otis Elevator

ContactRob Berg, CPFM Facilities Electrical Supervisor, 541-346-2313

To view current construction and impacts, visit UO Map.

8/29/22 – 8/30/22 – Baker Downtown Center Passenger Elevator Offline

UPDATE:
The elevator has been repaired and is operational

 

Begin:  Monday, August 29th, 2022

End:       Tuesday, August 30th, 2022

Building(s) or Area(s) Affected:  Baker Passenger Elevator

Scope:  The passenger elevator has been shut down for repairs.  Hoping to have the parts available tomorrow.

Services Impacted:  The elevator will be offline during this time.

Work Performed By:  Otis Elevator

ContactRob Berg, CPFM Facilities Electrical Supervisor, 541-346-2313

To view current construction and impacts, visit UO Map.

8/29/22 – 8/30/22 Lillis East Elevator Offline

UPDATE:
The elevator has been repaired and is operational

 

Begin:  Monday, August 29th, 2022

End:      Tuesday, August 30th, 2022

Building(s) or Area(s) Affected:  Lillis East Elevator

Scope:  The east elevator will be down for the evening.  Repairs will be made in the morning.

Services Impacted:  The east elevator will be unavailable.

Special Instructions:  Please use the other elevators located in the atrium or next to Peterson.

Work Performed By:  Otis Elevator

ContactRob Berg, CPFM Facilities Electrical Supervisor, 541-346-2313

To view current construction and impacts, visit UO Map.

8/18/22 Allen Hall Transformer Testing Electrical Shutdown

Begin: Thursday, August 18th, 2022 at 8:00 am

End:     Thursday, August 18th, 2022 till 6:00 pm

Building Impacted:  Allen Hall

Scope:

  • Due to Data center required utility transformer testing the power will be shut down

from 8:00 am -12:30 pm. Allen hall will be on Standby power during this time.

  • From 12:30 pm to 6:00 pm Allen hall will be on normal power without Standby backup.

Services Impacted:  The entire building will be affected.

Work Performed By:  Utilities and Energy and Contractor

ContactRick Tabor, CPFM Interim Co-Dir Utilities & Energy, 541-346-7511

To view current construction and impacts, visit UO Map.

8/16/22 – 8/17/22 Fenton Hall Elevator Shutdown

UPDATE:
Work on this elevator has been rescheduled for Tuesday, August 16th, and Wednesday, August 17th.

 

BeginMonday, August 15th, 2022 Tuesday, August 16th, 2022 at 7:00 am

End:      Tuesday, August 16th, 2022 Wednesday, August 17th, 2022 at 4:30 pm

Building(s) or Area(s) Affected:  Fenton Hall

Scope:  The passenger elevator will be shut down for an emergency belt replacement.

Services Impacted:  The elevator will be offline during this time.

Work Performed By:  Otis Elevator

ContactRob Berg, CPFM Facilities Electrical Supervisor, 541-346-2313

To view current construction and impacts, visit UO Map.

8/08/22 – 8/11/22 Oregon Hall Freight Elevator Shutdown

UPDATE 8/11/22:
Work has been completed on the freight elevator and it is now operational.

 

UPDATE 8/10/22:

EHS was notified of an odor issue in Oregon Hall at 11:30 on 8-10-2022. EHS responded immediately and identified the following issue:

The elevator contractor was using mineral spirits to clean oily residue off of the elevator components in the elevator pit. They were also using a fan to stay cool while working, blowing air in to the elevator pit. This inadvertently sent mineral spirit odors up the elevator shaft where is intruded into the freight elevator lobbies through the gaps in the doors. Affected building areas included the freight elevator lobbies on floors 1-3.

EHS corroborated the presence of odors with them intensifying as you went up from floors 1-3. Measurements collected with our VOC meter showed a maximum reading of 3.15 PPM. The Permissible Exposure Limit for Mineral Spirits is 100 PPM. Levels began dropping immediately after the exhaust fan was set up. Hazard levels of mineral spirits were not identified by EHS related to this incident.

Please free to contact me if you have any questions.

Thanks,

Adam S. Jones, CIEC | Environmental Services Manager
Safety and Risk Services
Environmental Health & Safety
1260 University of Oregon | Eugene, OR 97403-1260
(541) 346-8397 | asjones@uoregon.edu

 

Begin:  Monday, August 8th, 2022 at 7:00 am

End:      Friday, August 12th, 2022 at 5:00 pm

Building(s) or Area(s) Affected:  Oregon Hall

Scope:  Freight Elevator E140, located off the north loading dock, will be out of service during the week of 8/8 through 8/12 to replace a hydraulic piston.

Services Impacted:  There will be limited access to lobby L140 and basement lobby L003.

Work Performed By:  Otis Elevator Company

ContactBruce Budzik, CPFM Small Projects & Cap Imp Manager, 541-346-8834

To view current construction and impacts. visit UO Map.

8/04/22 13th Avenue Garage Elevator Work Advisory

Begin:  Thursday, August 4th, 2022 at 7:00 am

End:      Thursday, August 4th, 2022 at 4:00 pm

Building(s) or Area(s) Affected:  13th Avenue Garage

Scope:  One elevator will be shut down at a time do address water found in the elevator pit.

Services Impacted:  While one elevator is offline, please use the other elevator or the stairs.

Work Performed By:  CPFM Facilities Services and Otis

ContactGabe Hein, CPFM Facilities Services, 541-346-2319

To view current construction and impacts, visit UO Map.

7/29/22 – Unknown – Unthank Hall Elevator #1 Offline

Begin:  Friday, July 29th, 2022 – effective immediately

End:      Unknown

Building(s) or Area(s) Impacted:  Unthank Hall

Scope:  Elevator #1 is currently down.  The circuit board quit working and a new board is being ordered.

Services Impacted:  Elevator #1 is offline.  Please use elevator #2.

Work Performed By:  ThyssenKrupp Elevator

ContactWork Control Center, Campus Planning and Facilities Management, 346-2319

To view current construction and impacts, visit UO Map.

7/11-7/13 Lokey Education South Elevator Closure

Begin:  July 11, 2022

End:      July 13, 2022

Building(s) or Area(s) Affected:  Lokey Education Building – South Elevator

Scope:  Due to unforeseen circumstances the Lokey elevator remains down as this time. A contractor has been contacted and we hope to have this resolved by 7/13/22. This notice will be updated should any further delays occur.

Services Impacted:  Elevator access in Lokey Ed south building

Special Instructions: Please use the other elevators in Lokey Ed North and West.

Work Performed By: Ryan Thomas Construction

Contact: Damon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

6/20/22 – 7/8/22 Lokey Education South Side Restroom Shutdown

Begin:  Monday, June 20th, 2022

End:  Friday, July 8th, 2022

Building: Lokey Education building C.

Scope:  Due to an elevator modernization project, the restrooms immediately adjacent to the elevator will be closed (172, 173, 272, 273).

Services Impacted:  The Elevator and restrooms will be off line until project is complete.

Special Instructions:  Please use the alternate restrooms In Hedco, shown on the following map.

Work Performed By:  Ryan Thomas Construction.

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.

5/4/22 Streisinger Elevator Unresponsive

Begin:  May 4, 2022

End:      Unknown

Building(s) or Area(s) Impacted:  Streisinger Hall

Scope:  The elevator is unresponsive. Otis has been called for repairs.

Services Impacted: Elevator access in the building.

Special Instructions: Please use the Huestis elevator until repairs are complete. An update will be sent when the elevator is back in operation.

Work Performed By:  Otis

Contact: Work Control Center, Campus Planning and Facilities Management, 346-2319

Knight Library Elevator #5 Shutdown 4/5/22 – 4/6/22

Begin: Effective Immediately – Tuesday, April 5th, 2022

End:    Wednesday, April 6th, 2022

Building Impacted:  Knight Library

Scope:  Elevator #5 is non-responsive and is offline.  An Otis elevator technician has assessed the situation and repairs will be made in the morning.  An update will be sent when services have been restored.

Services Impacted: The elevator is currently out-of-order.  Please use the other elevators or stairs in the building.

Work Performed By: Otis

Contact: Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Thompson University Center Elevator Shutdown 4/1-4/4

Begin: Effective Immediately – Friday, April 1, 2022

End:   Monday, April 4, 2022

Building Impacted:  Thompson University Center

Scope:  The elevator is currently shut down and requires further repairs. Repairs will be made on Monday.

Services Impacted: The elevator is currently offline.

Work Performed By: Otis

Contact: Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Unthank Hall Electrical Shutdown 3/23

Begin:  March 23rd, 2022 at 8:00 AM

End:      March 23rd, 2022 at 2:00 PM

Building(s) or Area(s) Impacted:  Unthank Hall

Scope:  We will have an electrical shutdown at Unthank Hall. The building will be on standby power during the shutdown. Stand-By will power walk-in coolers, walk-in freezers, walk-in beverage coolers, ADA doors, MDF/IDF rooms, FSD’s, fire alarm system, elevator system, and all lighting that is on egress. This shutdown is to test the ATS and install a metering cabinet in the main switchgear.

Services Impacted: All electricity will be down except walk-in coolers, walk-in freezers, walk-in beverage coolers, ADA doors, MDF/IDF rooms, FSD’s, fire alarm system, elevator system, and all lighting that is on egress.

Special Instructions: Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By: Oregon Electric Group

Contact: George Bleekman, CPFM Owner’s Representative, 541-346-2625

Millrace Garage Elevator #2 Offline 3/10/22 – 3/15/22

Begin: Thursday, March 10th, 2022

End:    Tuesday, March 15th, 2022

Building Impacted: Millrace Garage

Scope:  The elevator is nonresponsive. The Otis elevator technician will be on site early next week. An update will be sent when repairs are made.

Services Impacted: The elevator is currently shut down.  Please use the other elevator.

Work Performed By: Otis

Contact: Work Control Center, Campus Planning and Facilities Management, 541-346-2319