12/30/24 Unthank Hall and Knight Law Center Steam Shutdown

Begin:  Monday, December 30, 2024, at 7:00 am

End:      Monday, December 30, 2024, at 5:00 pm

Building(s) or Area(s) Affected:  Unthank Hall and Knight Law Center

Scope:  Due to a steam pipe leak in the utility tunnel, steam will be shut down to replace a section of piping.

Services Impacted:  This will affect the building heat and the domestic hot water.

Special Instructions:  Please dress accordingly for the cooler temperatures.

Work Performed By:  CPFM Utilities & Energy and S2 Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Unthank Hall and Knight Law Center

12/26/24 Streisinger Hall Heating Water Shutdown

Begin:  Thursday, December 26, 2024, at 7:00 am

End:      Thursday, December 26, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  Streisinger Hall

Scope:  The 3rd floor heating will be shut down to change out a failed heating water valve.

Services Impacted:  This will only affect the 3rd floor building heat.

Special Instructions:  Please dress accordingly for the cooler temperatures.

Work Performed By:  CPFM Crews

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Streisinger Hall

12/19/24 – 12/20/24 East 13th Avenue Sidewalk (Portion by Columbia Hall) Closure

Begin:  Thursday, December 19, 2024, at 7:00 am

End:      Friday, December 20, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  Columbia Hall Sidewalk (next to E. 13th Ave.)

Scope:  A portion of sidewalk at the SE corner of Columbia Hall will be closed to allow the installation of a feeder cable into the tunnel.  Photo below shows the closure area.

Services Impacted:  Sidewalk access will be affected during this time.

Work Performed By:  CPFM Utilities & Energy

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map image of portion of sidewalk closed by the SE corner of Columbia Hall

12/16/24 – Unknown – Prince Lucien Campbell Emergency Heating Water Shutdown

Begin:  Monday, December 16, 2024 – effective immediately

End:      Unknown

Building(s) or Area(s) Affected:  Prince Lucien Campbell

Scope:  The heating water pump is currently offline for an emergency repair.  Parts have been ordered and are expected to arrive this Thursday.

Services Impacted:  This will affect the building heat in various parts of the building.  Outside temperatures are expected to be in the mid-50s this week.  Please plan on dressing accordingly.

Work Performed By:  CPFM Crews

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Prince Lucien Campbell

12/26/24 – 12/31/24 – 1715 Franklin “Quiet Period” Door Schedule

Begin:  Thursday, December 26, 2024

End:      Tuesday, December 31, 2024

Building(s) or Area(s) Affected:  1715 Franklin

Scope:  The east entrance to 1715 Franklin will be locked (still available with keycard access) during the quiet period.

Services Impacted:  We’re not expecting any outside traffic during this time, and reception won’t be staffed.  If anyone is expecting visitors, they’ll need to let them in if they don’t already have card access.

ContactLydia Fitzpatrick, CPFM Campus Planning, Real Estate and Leasing Coordinator, 541-346-3804

Current construction and impacts information can be found on the UO Maps site.

Overhead aerial view of the east entrance location at 1715 Franklin

TBD – Willamette Hall Exhaust Fan Shutdown

UPDATE:
This work has been postponed due to material lead times.  A notice will be sent when the work has been rescheduled.

 

BeginThursday, December 19, 2024, at 7:00 am   TBD

End:      Thursday, December 19, 2024, at 5:00 pm   TBD

Building(s) or Area(s) Affected:  Willamette Hall east of the Atrium – Basement through the 4th floor

Scope:  The exhaust fans serving these rooms will be down to install the correct sheaves and belts.

Services Impacted:  Room exhausts and fume hood exhausts in these rooms will be down for the entire day.

Special Instructions:  Fume hood sashes should be closed and containers within the fume hoods sealed before this date.

Work Performed By:  Air Introduction and Regulation

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Willamette Hall

 

12/16/24 Erb Memorial Union NW Exterior and University Street Forklift Work Advisory

The purpose of this email is to inform building occupants of the Erb Memorial Union, and nearby buildings, of the work being done at 7:30 am on Monday 12/16/24, outside of the EMU Fishbowl and Ballroom.

A trailer will be offloading material on University Street, with parking spaces on University Street within the work perimeter unavailable during the duration of the work – see diagram below.

A reach forklift will be hauling material.  A perimeter will be set up to control pedestrian traffic throughout the area. The forklift will be traveling on University Street northbound and onto the NW fishbowl sidewalk to access the offload area when hauling material with a flagger in front.

This may interrupt traffic briefly.  Please follow the directions given by the flaggers if driving in the area.

  • The photo on the left shows the work perimeter that will be taped off, restricting access to pedestrians and building occupants.  Please use the paths indicated by the green arrows to enter/exit the building.
  • The photo on the right shows the doors that will be temporarily restricted (red boxes). The west door entering from University Street will be fully available to use (green box).  In the event of an emergency, all building exits are available to use, including the exits depicted in the photo below.

Please feel free to reach out to Chad Well, EMU Building Superintendent, at (541-346-0692) for any questions.

Thank you!

Justin Zunker (he/him)

Occupational Safety Officer
Safety & Risk Services
safety.uoregon.edu
Safety & Risk Services | University of Oregon
1260 University of Oregon | Eugene, OR 97403-1260
Direct: 541.346.0780 | Cell: 218.940.0500

Current construction and impacts information can be found on the UO Maps site.

Overhead map views of forklift activity taking place at the EMU on 12/16/24

12/11/24 – Unknown – Streisinger Hall Exhaust Fan 3 Emergency Shutdown

Begin:  Wednesday, December 11, 2024 – effective immediately

End:      Unknown

Building(s) or Area(s) Affected:  Streisinger Hall – 2nd floor

Scope:  Exhaust fan 3 is offline due to an emergency shutdown.  Replacement parts are being located.  An update will be sent when it has been repaired.

Services Impacted:  This will affect the fume hoods and general exhaust on the 2nd floor.

Special Instructions:  Please close and secure fume hood sashes.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Streisinger Hall

12/19/24 Johnson Hall Fire Sprinkler System Shutdown

Begin:  Thursday, December 19, 2024, at 7:00 am

End:      Thursday, December 19, 2024, at 2:00 pm

Building(s) or Area(s) Affected:  Johnson Hall

Scope:  Due to the installation of a fire sprinkler head in the Office of General Counsel remodel, the fire sprinkler system will be shut down to complete the work.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations.

Work Performed By:  Swinerton Builders, Swift, and IES

ContactRenee Benoit, CPFM Owner’s Representative, 541-346-5080

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Johnson Hall room 219

12/16/24 Straub Hall East Elevator #2 Testing Shutdown

Begin:  Monday, December 16, 2024, at 9:00 am

End:      Monday, December 16, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Straub Hall

Scope:  East elevator #2 will be offline for testing.

Services Impacted:  The east elevator will be out of order until testing is done.  Please use the west elevator.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of the location of the east elevator in Straub Hall

12/16/24 – 1/03/25 Willamette Hall Classroom #110 Renovation Advisory

Begin:  Monday, December 16, 2024

End:      Friday, January 3, 2025

Building(s) or Area(s) Affected:  Willamette Hall Classroom #110

Scope:  Classroom #110 will be offline while it is being renovated.  This will include the replacement of the flooring and seating.

Services Impacted:  Typical construction activity and noises can be expected during this time.  The flooring work will take place at night.

Work Performed By:  CPFM Facilities Services and Contractors

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Willamette Hall Classroom #110

 

12/23/24 – 01/01/25 Erb Memorial Union ID Services Office Holiday Closure

Department Key and Card/AMAG Admin:

The EMU and the ID Services Office will be closed from December 23rd – January 1st and reopening January 2nd.  Vanessa Abbott, Access Control Program Specialist, will also be unavailable during this time.

Key orders/dispersals/returns will not be processed during this time. You may still submit the requests but note that keys won’t be available for pick up until after January 2nd.

Prox access and Locknetic code requests will be processed by Angee from the Lock and Key Shop. You can contact her through the access request forms here: https://emu.uoregon.edu/key-and-access-office or at keyaccess@uoregon.edu.

Please plan accordingly as some requests might need to wait until the office reopens.

Feel free to forward this email to other relevant parties.

Thank you for your patience and understanding.

Thank you,
Vanessa Abbott
Pronouns: she/her

Access Control Program Specialist
University of Oregon Campus Planning & Facilities Management
ID Card Services Office, Ground Level, Room 002
Erb Memorial Union
(541) 346-5446
For keys, cards access, and Locknetic instructions and forms, please visit: https://emu.uoregon.edu/key-and-access-office

Overhead map view of Campus

12/11/24 Columbia Hall Routine Drinking Water Monitoring Advisory

Hi All,

As a part of the University’s ongoing drinking water management program, Environmental Health and Safety is conducting routine drinking water monitoring in Columbia Hall on Wednesday, December 11, 2024. EHS will tag the drinking fountains by 8:00 am and will collect samples around 2:00 pm. Please do not use any tagged fixtures. All other fixtures within the building may be used as normal and the drinking fountains in Pacific Hall and Klamath Hall will be available. EHS will remove the tags as samples are collected, after which the fixtures may return to normal use.

EHS expects to receive results in early January. Results will be added to our online results at THIS LINK. Results exceeding EPA limits will be communicated to building occupants via CPFM Work Control.

Thank you,
Adam

Adam S. Jones, CIEC | Environmental Services Manager
Safety and Risk Services
Environmental Health & Safety
1260 University of Oregon | Eugene, OR 97403-1260
(541) 346-8397 | asjones@uoregon.edu
(541) 852-5685

Overhead map view of Columbia Hall

12/11/24 Onyx Bridge Routine Drinking Water Monitoring Advisory

Hi All,

As a part of the University’s ongoing drinking water management program, Environmental Health and Safety is conducting routine drinking water monitoring in Onyx Bridge on Wednesday, December 11, 2024. EHS will tag the drinking fountains by 8:00 am and will collect samples around 2:00 pm. Please do not use any tagged fixtures. All other fixtures within the building may be used as normal and the drinking fountains in Pacific Hall and Klamath Hall will be available. EHS will remove the tags as samples are collected, after which the fixtures may return to normal use.

EHS expects to receive results in early January. Results will be added to our online results at THIS LINK. Results exceeding EPA limits will be communicated to building occupants via CPFM Work Control.

Thank you,
Adam

Adam S. Jones, CIEC | Environmental Services Manager
Safety and Risk Services
Environmental Health & Safety
1260 University of Oregon | Eugene, OR 97403-1260
(541) 346-8397 | asjones@uoregon.edu
(541) 852-5685

Overhead map view of Onyx Bridge

12/11/24 – 12/20/24 Knight Library Restrooms 126 and 127 Intermittent Closures

Begin:  Wednesday, December 11, 2024

End:      Friday, December 20, 2024

Building(s) or Area(s) Affected:  Knight Library restrooms 126 and 127

Scope:  Knight Library restrooms 126 and 127 will have intermittent closures the week of December 9th and will be closed the week of December 16th for the installation of new partition walls. All other restrooms on the first floor of the library will remain open.

Services Impacted:

  • Restrooms 126 and 127 will be closed intermittently.
  • The closest restrooms are room 116 and room 120 which are near the front Circulation desk – see diagram below.

Work Performed By:  CPFM Facilities and HD Supply

ContactJanell Cottam, CPFM Owner’s Representative, 541-346-7536

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Knight Library's 1st floor showing the optional restroom locations during work on restrooms 126 and 127 12/11/24 -12/20/24

12/20/24 – 1/02/25 Campus Wide Winter Break Door Lock Procedure

Facilities Liaisons:

The purpose of this email is to share details of the door lock procedure for the Winter academic break schedule for 2024. This procedure is designed to protect against theft and vandalism while also providing access to specific public facing buildings on the UO’s campuses, as follows:

  • Most university building doors will be locked during observed holidays and academic breaks (including Winter Break 2024) as defined below.
  • Some buildings with public facing services may not be subject to the locking schedule, especially during this academic break. These buildings are listed on the website in the Exceptions list.
  • Faculty, staff, and student employees should already have either keys or prox card access to enter buildings during these times. Departments have authorized individuals who can request access for those who may need it for the Break period.
  • No changes will be made to regular individual access, so anyone with existing access will still be able to access their normal locations.

Please note that during the Winter Break period (i.e., closing time on Friday, December 20th until Thursday, January 2nd at 7:00 A.M.) most buildings on campus will be closed and locked.

Authorized individuals may request exceptions to the locking procedure by meeting specific criteria listed in the procedure. Requests for exceptions can be submitted to FASS IT by calling 541-346-2245 or by emailing fass@uoregon.edu, providing as much advance notice as possible, and noting which exception criteria their situation(s) meets. FASS-IT will consult with the Campus Vulnerability Assessment Team on approval of exemptions.

Please feel free to reach out if you have any questions. My email address is: carl.peaster@uopd.org

Thank you!

Overhead map view of campus

12/16/24 – 1/02/25 Many Nations Longhouse Wood Floor Repair and Refinishing Advisory

Begin:  Monday, December 16, 2024, at 7:00 am

End:      Thursday, January 2, 2025

Building(s) or Area(s) Affected:  Many Nations Longhouse room 101

Scope:  The wood floor will be repaired and refinished – see diagram below.

Services Impacted:

  • Equipment will be moved in and out of the building.
  • Odor and noise are to be expected in the building during work.

Special InstructionsDo NOT step on the floor.

Work Performed By:  New Dimension Hardwood Floors

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Map diagram of the Many Nations Longhouse showing the location where the floor will be refinished 12/16/24 - 1/02/25

12/19/24 – 12/27/24 Campus Mandatory State Elevator Testing

UPDATE:
Due to a scheduling issue, Knight Library #1 testing will happen on Thursday, Dec. 19th, and EC Cares testing will take place on Friday, Dec. 20th.

 

Begin:  Thursday, December 19, 2024

End:      Friday, December 27, 2024

Building(s) or Area(s) Affected:  Millrace 3, CPFM Warehouse, Lewis Integrative Science Building, 1500 W. 12th, Knight Library, Bean Hall, Columbia Hall, Condon Hall, McKenzie Hall, Hamilton Kitchen, Hendricks Hall, Early Hall, Knight Law School, Oregon Hall, Baker Center, Rainier Building, Carson Hall, Jordon Schnitzer Museum of Art

Scope:  Rupture valves tests will be performed on 2-3 elevators per day.  Only one elevator will be taken offline at a time. (See schedule below.)

Services Impacted:  Each unit will be out of service during the test for approximately 2-3 hours.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Thursday, December 19, 2024
Millrace 3
CPFM Warehouse (Bldg. 130)
Lewis Integrative Science Building #2 North
EC Cares (1500 W. 12th)   Knight Library #1

Friday, December 20, 2024
Knight Library #1   EC Cares (1500 W. 12th)
Bean Hall
Columbia Hall
Condon Hall

Monday, December 23, 2024
McKenzie Hall
Hamilton Kitchen
Hendricks Hall
Earl Hall

Tuesday, December 24, 2024
Knight Law School #1
Knight Law School #2
Knight Law School #3
Oregon Hall – Service/Freight #3

Thursday, December 26, 2024
Baker Downtown Center – Freight
Rainier Building
Carson Hall – Kitchen Freight
Cascade Hall

Friday, December 27, 2024
Jordan Schnitzer Museum of Art – Passenger
Jordan Schnitzer Museum of Art – Freight

Work Performed By:  CPFM Facilities and Otis Elevator

Contact:  Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of the buildings impacted by the elevator rupture valve tests 12/19/24 - 12/27/24

12/10/24 Powell Plaza and E. 15th Avenue Commemorative Plaques Installation Advisory

Begin:  Tuesday, December 10, 2024

End:      Tuesday, December 10, 2024

Building(s) or Area(s) Affected:  Powell Plaza and E. 15th Avenue

Scope:  Fourteen (14) commemorative plaques will be installed in Powell Plaza and E. 15th Avenue honoring the UO Ducks who made the 2024 Paris Olympic team.  (Please see attached for installation locations and list of names.)

Services Impacted:  A contractor will be working in this area and associated noise can be expected.

Work Performed By:  Stone Sculptures

Contact:  Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Olympic Duck medalist Paris 2024

12/18/24 – 12/20/24 Campus Winter Grease Trap Cleaning Advisory

Begin:  Wednesday, December 18, 2024, at 8:00 am

End:      Friday, December 20, 2024, at 4:00 pm

Scope:  Housing and Dining will have a contractor clean the grease traps in select areas of campus – see schedule below

Buildings and Schedule:

Wednesday, December 18th

  • 8:00 am – Price Science Commons (inside grease traps)
  • 10:00 am – Lawrence Hall (inside grease traps)
  • 10:00 am – Central Kitchen (plus jetting)
  • 11:00 am – Living Learning Center (inside grease traps)

Thursday, December 19th

  • 9:00 am – Tykeson Hall (inside grease traps)
  • 9:00 am – Global Scholars (plus jetting)
  • 10:00 am – Knight Library (inside grease traps)
  • 11:00 am – HEDCO (inside grease traps)
  • 11:00 am – Barnhart Hall (plus jetting)
  • 12:30 pm – Carson Hall (plus jetting)

Friday, December 20th

  • 8:00 am – Unthank Hall (plus jetting)
  • 9:00 am – Ford Alumni (inside grease traps)
  • 10:00 am – Spencer View (inside grease traps)
  • 1:00 pm – EMU (plus jetting)

Services Impacted:  Noise can be expected in the area, along with the possibility of encountering unpleasant odors outside the building with potential drift inside via entryways.

Work Performed By:  Roto Rooter

Contact: University Housing Facilities  541-346-3477

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of buildings involved in the Campus Winter Grease Trap Cleaning 12/18/24 - 12/20/24

12/19/24 Huestis Hall Door Inspections and Adjustments Advisory

Begin:  Thursday, December 19, 2024

End:      Thursday, December 19, 2024

Building(s) or Area(s) Affected:  Huestis Hall – floors 1 through 4

Scope:  Door hardware and frames will be inspected and adjusted as part of the warranty work at Huestis Hall.

Services Impacted:  Contractor will be opening every door in the building.

Work Performed By:  Mid-Valley Glass & Millwork

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Huestis Hall

12/9/24 CPFM/FASS Fuel Island Inspection Advisory

Begin:  Monday, December 9, 2024 at 8:00 am

End:      Monday, December 9, 2024 at 11:00 am

Building(s) or Area(s) Affected:  CPFM/FASS Fuel Island

Scope:  The DEQ will be doing the annual underground storage tank inspection.

Services Impacted:  The fuel island will be periodically unavailable during this time.

Work Performed By:  Department of Environmental Quality

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

fuel island on the map

Posted in Gas

12/5/24 – Unknown Klamath Hall Emergency RO Water Shutdown

Begin:  Thursday, December 5, 2024 – effective immediately

End:      Unknown

Building(s) or Area(s) Affected:  Klamath Hall

Scope:  The RO Water has been shut down for an emergency repair to the RO Tank in room 232. An update will be sent out when the RO Water has been restored.

Services Impacted:  This will affect the RO water throughout the building.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Klamath over head view

12/17/24 – 1/09/25 Campus Winter Fire Systems Testing/Maintenance Schedule for 2024/2025

UPDATE 12/5/24:  The testing at the EMU scheduled for Tuesday, Dec. 17 – 6:00 am – 3:00 pm has been postponed for a later date TBD, a new notice will be sent out when the schedule has been determined.

Begin: Thursday, December 17, 2024

End:     Thursday, January 9, 2025

Scope:  Fire system testing and maintenance has been scheduled for the various campus buildings listed below.  Reminders will be sent to each building prior to testing.

Buildings and Schedules:

Week of 12/16 – 12/20

  • Tuesday, Dec. 17         6:00 am – 3:00 pm      Erb Memorial Union (All systems including hoods) TBD
  • Wednesday, Dec. 18    6:00 am – 3:00 pm      Streisinger Hall / Lokey Labs / Lewis Integrative Science Building / Huestis Hall / Pacific Hall
  • Thursday, Dec. 19       6:00 am – 3:00 pm     Klamath Hall / Willamette Hall / Cascade Hall / Price Science Commons / Onyx Bridge & EHS office

Week of 12/23 – 12/27

  • Monday, Dec. 23         6:00 am – 3:00 pm       Knight Library (Sprinklers/Alarms)
  • Tuesday, Dec. 24          6:00 am – 3:00 pm      Knight Library (Elevators)
  • Tuesday, Dec. 24          8:00 am – 12:00 pm    Global Scholars (Hoods)
  • Tuesday, Dec. 24          10:30 am – 2:00 pm    Unthank (Hoods only)

Week of 12/30 – 1/03

  • Monday, Dec. 30         7:00 am – 8:00 am       Spencer View (Hoods only)
  • Monday, Dec. 30         8:00 am – 9:00 am     Moss St. Child Center (Hoods only)
  • Monday, Dec. 30         9:00 am – 2:00 pm      Central Kitchen (All systems)
  • Monday, Dec. 30         2:00 pm – 3:00 pm     Many Nations Long House (Hoods only)
  • Tuesday, Dec. 31          6:00 am – 8:00 am     Hatfield-Dowlin Complex (Hoods only)
  • Tuesday, Dec. 31          8:00 am – 10:00 am     Carson Hall (Hoods only)
  • Tuesday, Dec. 31          10:00 am – 12:00 pm   Living Learning Center (Hoods only)
  • Tuesday, Dec. 31          1:00 pm – 3:00 pm       Barnhart (Hoods only)
  • Thursday,  Jan 2            6:00 am –  7:00 am      Transportation Services
  • Thursday, Jan 2             7:00 am – 8:00 am     EC Cares West 12th
  • Thursday, Jan 2             8:00 am – 9:00 am     EC Cares Westmoreland and Modular 190 (Whitaker Neighborhood)

Week of 1/06 – 1/10

  • Monday, Jan. 6            6:00 am – 7:00 am     Ford Alumni Center
  • Monday, Jan. 6            7:00 am – 8:00 am     Jaqua Center (Kone)
  • Tuesday, Jan. 7             9:00 am – 11:00 am     Parker Black Cultural Center
  • Tuesday, Jan. 7            11:00 am – 1:00 pm     Susan Campbell Hall and Hendricks Hall (H&P makeup/repair)
  • Wednesday, Jan. 8      6:00 am – 3:00 pm     Lillis Complex
  • Thursday, Jan. 9          6:00 am – 3:00 pm     Knight Campus Science Building #1

Details: Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions: If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By: UO Safety & Risk Services

Contact: Zach Earl, UO SRS Fire Protection Manager, 541-346-9295 or 541-521-0351

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of the buildings affected during the Campus Winter Fire Systems Testing/Maintenance Schedule for 12/17/24 - 1/09/25

Plus three EC Cares locations, Hatfield-Dowlin Complex, and Spencer View

12/18/24 Miller Theatre Complex Steam Shutdown

Begin:  Wednesday, December 18, 2024 at 7:00 am

End:      Wednesday, December 18, 2024 at 1:00 pm

Building(s) or Area(s) Affected:  Miller Theatre Complex

Scope:  Steam will be shut off while a new steam valve is installed to feed Villard Hall.

Services Impacted:  Heat to the entire building will be off for the duration of this work.  This has been scheduled during winter break to reduce interruptions to building users.

Work Performed By:  Alliant Systems

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

Current construction and impacts information can be found on the UO Maps site.

Miller Theatre Complex on map