6/09/23 – 9/30/23 Streisinger Hall and Parking Lot 12B East Science Loop Project

2nd UPDATE 9/28/23:
It is expected that the tar odors may be noticed around Klamath Hall, and possibly Onyx Bridge, tomorrow.

 

UPDATE 9/28/23:
The East Science Loop civil contractor will be paving the parking lot on the north side of the Streisinger building (see picture for specifics), weather depending. This is scheduled for Friday, September 29th from 7:00 am to 12:0 noon.  During this work the adjacent areas will be experiencing heavy vehicle traffic as the work is being performed, and due to this spaces might be blocked temporarily. Additionally, some paving odors will be present during the work as well.

If this work does not take place due to weather, the notice will be updated with future times/dates to be aware of.

Thank you for your understanding.

Diagram of Streisinger Lot Paving Project for 9-29-23

 

UPDATE 7/11/23:
The crane/closure dates have now been shifted, due to crane availability, to Friday, July 21st, and Wednesday, July 26th.  The third date is yet to be determined.

 

UPDATE to 6/30/23 Lab Waste Shutdown Entry (7/05/23):
After speaking with the building users regarding lab waste schedules, we are rescheduling the lab waste piping connection shutdown to Friday, July 7th, and Monday, July 10th.

 

UPDATE 7/05/23:
As part of vault deliveries for the East Loop Electrical project, the parking lot area shown will be closed and also the associated loading dock will be down for the duration of the crane work on Monday, July 17th Friday, July 21st, at 7:00 am through Tuesday, July 18th, until 6:00 pm.  Please take this into consideration for your activities, and reach out should this activity limit critical operations/needs.  This will be the first of 3 such closures, with the next potentially occurring 7/25 7/26 and 8/2 TBD. We will update this notice each time to ensure we are working around your needs as we are able.

Image of parking lot for Streisinger and Klamath

 

UPDATE 6/30/23:
Due to work needed to move the East Loop electrical project forward, the lab waste piping will be shut down for up to a days’ time to make the necessary connections to improve the system. This will affect Streisinger, Klamath, and Onyx Bridge.  Be advised that during this time, all lab waste drains will be unable to be used (eg: sink drains).  We are intending to perform this work on Tuesday, July 11th, Friday, July 7th, and Monday, July 10th, from 7:00 am to 5:00 pm.    Please let us know if that day presents a conflict in regard to your operations.  If not, we will update this work as confirmed.

 

UPDATE:
The arborist notified us that due to a change in his schedule, the tree work will take place tomorrow.

 

Begin:  Monday, June 12, 2023

End:      Saturday, September 30, 2023

Building(s) or Area(s) Affected:  Streisinger Hall, East end of Parking Lot 12B

Scope:  Beginning next week, the East Science Loop civil contractor will be kicking off ground work for the project. This will include demolition in the project area, including asphalt removal, tree/planting removal, and earthwork.

Services Impacted:

  • Please be aware associated noises and vibrations are to be expected.
  • The adjacent loading dock will be functional throughout.
  • Pedestrian rerouting (e.g.: not through the parking lot area) will be present for the life of the project. (See picture for details.)
  • No disruptions to services (not previously discussed) are expected.

Work Performed By:  Wildish Construction

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

Current construction and impacts information can be found on the UO Maps site.

Diagram of Streisinger and Lot 12B

6/05/23 Onyx Bridge and Cascade Annex East Water Intrusion

In the early hours of June 5, 2023, a leak occurred from a water line in Onyx Bridge, Cold Room 485. The leak impacted several spaces on all floors of Onyx Bridge, and the southern portion of Cascade Annex East. Thanks to the quick work of CPFM staff, the building impacts were contained and limited to cabinetry, carpet, ceiling tiles, and/or wall finishes in the rooms listed below:

Onyx Bridge: 169, 170, H261, 265, 269, H361, 368, and 369.

Cascade Annex East: V150, 160, 160A, and 160B

The University has retained a mitigation contractor, Belfor, to provide mitigation services for all of the affected spaces. Our current mitigation strategy will be to dry out finishes in place where possible, with minimal demolition. This will include the use of dehumidification equipment and large fans strategically placed throughout affected areas. The equipment will generate heat and a significant amount of noise. EHS will oversee the dry out phase of the mitigation. Belfor began setup of mitigation equipment in the affected spaces today (June 7, 2023) and dry out status will be re-evaluated later this week. Once mitigation has been completed, the spaces will be reassembled by CPFM staff as needed.

Starting tomorrow (June 8, 2023), BELFOR will demolish the impacted and failing ceiling tiles in Hallway H261 outside of Rooms 268/269. This work will be performed within a negative pressure enclosure, and the containment will be constructed such that half of the hallway will be passable at all times. This is anticipated to be completed by end of day.

Please feel free to contact me if you have any questions or concerns about the mitigation phase of this incident. If any non-building related items were damaged as a result of this incident, contact Risk Management at 541-346-8316.

Thanks,

Nate Ferguson
Building Environmental Sciences Coordinator
http://safety.uoregon.edu/

Safety & Risk Services | University of Oregon
1260 University of Oregon | Eugene, OR 97403-1260
Office: 541.346.2901 | Mobile: 530.902.0109

Image of Onyx Bridge and Cascade Annex East

6/21/23 – 9/04/23 Campus Wide Lowered Custodial Services

I am alerting you to CPFM Facilities Services Custodial Department’s temporary adjustment to services provided to the academic buildings during the upcoming Summer Term. Last year we had the opportunity to partner with U of O Housing during the World Track Championships and provide custodial support to supplement Housing’s custodial staff during their busiest time of the year, which coincides with the least occupancy in the academic buildings. As a result of last year’s successful partnership, Housing is again going to utilize Facilities Services custodial staff during the summer. Because of this transfer of custodians, Facilities Services will be reducing some services in the academic buildings during the summer months.

In addition to supporting this year’s Commencement activities, starting June 21, 2023, all of the Custodial day shift, and part of the swing shift, will be working with Housing staff to prepare dorm rooms for the upcoming academic year and to support summer events. Custodial Services will continue to work with Housing until after the Labor Day holiday (September 4th), when they will resume full campus services to the academic campus and spend the remainder of the summer getting the academic buildings ready for the school year.

For the summer, you can expect the following reduction in custodial services in the academic buildings:

  • Offices will not be cleaned.
  • Classrooms that are not scheduled for use by the Registrar will not be cleaned.
  • Reduced restroom and common space cleaning in lower use buildings, though all restrooms will still be checked multiple times per week and cleaned if needed.
  • For buildings with regular classroom use, the only reduction that will be experienced is the temporary cessation of office cleaning.  All other services will remain the same as the academic school year.

Thank you in advance for your support in these efforts. Our custodians work very hard to keep the campus looking and feeling clean and safe for the campus community. They are proud of the work that they are doing to support the students, faculty, and staff.  We realize that there may be things that we have not considered with this service reduction.

Please let us know if there are any challenges or difficulties that we can help address to make things work better for each of you. We will continue to have some custodial staff during the day to support urgent needs that may come up.

Best regards,

Tim Winder
Custodial Services Manager
University of Oregon Facilities
Twinder2@uoregon.edu
Office: 541-346-5771

Additional Contact:  Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of campus

6/20/23 – 6/21/23 Lillis Hall East Elevator #3 Shutdown

Begin:  Tuesday, June 20, 2023

End:    Wednesday, June 21, 2023

Building Impacted:  Lillis Hall

Scope:  East elevator #3, near Anstett Hall, will be shut down to replace a pump.

Services Impacted:  The elevator will be offline during this time.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By: Otis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Lillis Complex east elevator #3

6/19/23 – 6/20/23 Lewis Integrative Science Building Main Elevator Shutdown

Begin:  Monday, June 19, 2023

End:    Tuesday, June 20, 2023

Building Impacted:  Lewis Integrative Science Building

Scope:  The main elevator will be shut down for repairs.

Services Impacted:  Elevator #1 will be offline during this time.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By: Otis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Lewis Integrative Science Building Elevator #1

Klamath Hall Loading Dock Cardboard Collection Change 6/02/23

Begin:  Friday, June 2, 2023 – effective immediately

Building(s) or Area(s) Affected:  Loading Dock for Klamath Hall, Onyx Bridge, Willamette Hall, and Price Science Commons

Scope:  The cardboard collection location at the Klamath loading dock (pic below) has moved from green dock carts to a cardboard dumpster at the loading dock.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Klamath Hall loading dock

6/09/23 Fuel Island Routine Maintenance Shutdown

Begin:  Friday, June 9, 2023, at 7:00 am

End:      Friday, June 9, 2023, at 4:00 pm

Building(s) or Area(s) Affected:  Fuel Pumps in Campus Planning and Facilities Management Compound

Scope:  The fuel island at CPFM will be shut down for regular maintenance.

Services Impacted:  The fuel pumps will be offline during this time.

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

Current construction and impacts information can be found on the UO Maps site.

Image of CPFM Compound

6/14/23 – 6/15/23 – 1715 Franklin North Wing Drainage System Shutdown

UPDATE:
While repairs are made to the sewage lift station, seven parking spaces (#8 – #14) will be blocked off for the contractor’s pump truck.  These spots are located directly in front of the east entrance.

Image of parking lot at 1715 Franklin

 

Begin:  Wednesday, June 14, 2023, at 7:00 am

End:      Thursday, June 15, 2023, at 5:00 pm

Building(s) or Area(s) Affected:  1715 Franklin Blvd – North Wing

Scope:  Due to sewage lift station repair/upgrade, all drain piping will be out of service on the first and second floor of the north wing until repairs are complete.

Services Impacted:  This will impact usage of domestic hot and cold water in all sinks, toilets, urinals, and drinking fountains.

Special InstructionsPlease use restrooms and sinks in the south wing.

Work Performed By:  CPFM Facilities and Roto Rooter

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of 1715 Franklin 1st floor north wing

6/20/23 – 7/10/23 Knight Library Second Floor South Reading Room Construction Work Advisory

Begin:  Tuesday, June 20, 2023

End:      Monday, July 10, 2023

Building(s) or Area(s) Affected:  Knight Library

Scope:  Demolition of counters and buildouts around four columns, plus minor electrical work, will take place in the 2nd floor South Reading Room.

Services Impacted:  Noise and odor can be expected during this time.

Work Performed By:  CPFM Facilities

ContactBrianna Liberty, CPFM D&C Design Associate, 541-346-7612 or 541-556-9618

Current construction and impacts information can be found on the UO Maps site.

Image of Knight Library 2nd floor South Reading Room