3/27/24 Knight Library Intermittent HVAC Interruption Advisory

Begin:  Wednesday, March 27, 2024, at 8:00 am

End:      Wednesday, March 27, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  Knight Library

Scope:  To maintain reliability of the Building Automation System controllers, Siemens will be performing firmware updates.

Services Impacted:

  • Work will cause interruptions of building HVAC systems.
  • Interruptions should last less than 90 minutes.
  • This will affect the cooling, exhaust, heating, and HVAC air supply.

Work Performed By:  Siemens

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Knight Library

2/23/24 Huestis Hall Sealant Application, Odor Advisory, and Exhaust Fan Shutdown

UPDATE:
The time has been extended an additional two hours, from 6:00 am to 11:00 am.

 

Begin:  Friday, February 23, 2024, at 6:00 am

End:      Friday, February 23, 2024, at 9:00 11:00 am

Building(s) or Area(s) Affected:  Huestis Hall, Willamette Hall, Lokey Labs

Scope:  Graffiti proof sealant will be applied to the exterior brick on Level 1/ground floor of Huestis Hall. The early morning hours were selected to decrease the amount of disruption to occupants during a typical work day. This notice is subject to rescheduling if weather conditions are unfavorable for installation.

Outage affecting Huestis basement: AHU 1 and 2 and lab exhaust fans will be offline during this work activity.

Advisory to Lokey Labs and Willamette Hall: Neighbors of Huestis Hall may experience odors due the sealant material.

Work Performed By:  Milne, Lease Crutcher Lewis

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Map showing Huestis Hall

1/09/24 and 1/12/24 Huestis Hall and Lokey Labs Fume Hoods, Exhaust, HVAC Air Supply and Fire Alarm System Shutdown

1st Day:             Tuesday, January 9, 2024, from 7:00 am until 4:00 pm

2nd Day:           Friday, January 12, 2024, from 7:00 am until 4:00 pm

Building(s) or Area(s) Affected:  Huestis Hall and Lokey Labs

Scope:

  • Huestis Hall: On Tuesday 1/9 and again on Friday 1/12 from 7:00 am – 4:00 pm, air and exhaust systems will be offline in the basement as the temporary AHU and exhaust fans are removed and final connections to building AHU units and lab exhaust fans are reconnected. User access to Huestis rooms 6, 12 and 13 should be limited or avoided during this shutdown.
  • Lokey Labs and Huestis Hall:  On Tuesday, 1/9 from 7:00 am until 4:00 pm, the fire alarm system will be offline to Huestis and Lokey Labs during this shutdown. Contractor will provide fire watch.

Services Impacted:  This will affect exhaust, fire alarm systems, fume hoods, heating, cooling, and the HVAC air supply.  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  JH Kelly, FM Sheetmetal, IES

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall and Lokey Labs

1/08/24 Huestis Hall Basement Multiple System Shutdown

UPDATE:
This shutdown was not able to occur as scheduled due to additional coordination requirements.  It will now take place on January 8th, in the previously scheduled time slot of 8:00 am to 12:00 noon.

 

BeginDecember 27, 2023  January 8, 2024, at 8:00 am

End:      December 27, 2023  January 8, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Huestis Hall basement

Scope:  Multiple systems will be shut down for a 4-hour duration in the Huestis basement to allow for a building automation controls upgrade.

Systems Impacted:

  • Chilled Water
  • Domestic Cold Water
  • Domestic Hot Water
  • Exhaust
  • Heating
  • Hot Water
  • HVAC Air Supply
  • Steam Condensate

Work Performed By:  Siemens

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall

 

 

12/15/23 Willamette Hall MBC1 Swap Out Emergency Shutdown

Begin:  Friday, December 15, 2023, at 10:00 am

End:      Friday, December 15, 2023, at 10:30 am

Building(s) or Area(s) Impacted:  Willamette Hall

Scope:  Here is a list of effected equipment which will be down for approximately 15-30 minutes during an emergency swapping out of the processor on MBC1.

Equipment and Areas Affected:

  • Willamette AHU-1 – Floors 1-4 east wing
  • Willamette AHU-2 – Zebrafish quarantine
  • Willamette SF-8/9 – East labs
  • Willamette AHU-7 – Generator room
  • Willamette heating water system
  • Willamette heat recovery system

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Willamette Hall

12/07/23 Streisinger Hall HVAC and Exhaust Systems Emergency Shutdown

Begin:  Thursday, December 7, 2023, at 8:00 am

End:      Thursday, December 7, 2023, at 9:00 am

Building(s) or Area(s) Affected:  Streisinger Hall

Scope:  An emergency shutdown is needed to implement modifications to Siemens control panels.

Services Impacted: A short outage of all HVAC and exhaust systems will affect the exhaust, fume hoods, heating, and HVAC air supply systems.

Special Instructions:  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Work Performed By:  CPFM Facilities BAS Staff

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Streisinger Hall

11/20/23 Klamath Hall Emergency Exhaust Fan Shutdown

UPDATE:  The repair has been completed and the exhaust fans returned to service.

Begin:  Monday, November 20, 2023, at 8:00 am

End:    Monday, November 20, 2023

Building(s) or Area(s) Affected:  Klamath Hall

Scope:  Due to a broken damper, exhaust fans 3 & 4 serving Klamath Hall will be shutdown for repairs some time between 8:00 am and 8:30 am this morning.

Services Impacted:  The air exhaust for all Klamath Hall will be affected.  An update will be sent out once the work is completed.

Special Instructions:  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this time.

Work Performed By:  Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

klamath hall on map

12/07/2023 Huestis Hall Basement HVAC and Lab Exhaust Shutdown

Begin:  Thursday, December 7, 2023, at 7:00 am

End:      Thursday, December 7, 2023, at 5:30 pm

Building(s) or Area(s) Affected:  Huestis Hall Basement

Scope:  Heating/cooling supply and lab exhaust will be offline throughout the Huestis basement.

Services Impacted:  This will affect chilled water, cooling, exhaust, heating, and HVAC air supply.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall

12/12/23 – 12/15/23 Klamath Hall HVAC Air Supply Shutdown

CLARIFICATION:
“The 2nd floor of Klamath” refers to the floor where the rooms numbers are all in the 200’s.

 

Begin:  Tuesday, December 12, 2023, at 7:00 am

End:      Friday, December 15, 2023, at 4:00 pm

Building(s) or Area(s) Affected:  Klamath Hall

Scope:  Due to the replacement of the building cooling units, the air supply system for the 2nd floor of Klamath will be shut off during the daytime.

Services Impacted:  The air supply system will be offline on the 2nd floor and in room 075.

Work Performed By:  S2 and others

ContactDavid Mason, CPFM Owner’s Representative, 541-346-5679

Current construction and impacts information can be found on the UO Maps site.

Image of Klamath Hall

11/30/23 Huestis Hall Basement Steam, Air Supply and Exhaust Shutdown

Begin:  Thursday, November 30, 2023, at 5:00 am

End:      Thursday, November 30, 2023, at 4:30 pm

Building(s) or Area(s) Affected:  Huestis Hall

Scope:  Steam supply will be offline to Huestis Hall to allow for the removal of the existing steam flow meter and final connections of the basement facility to the new low and medium pressure steam LPS/MPS systems and flow meter.

Services Impacted:  During this outage all air supply and exhaust systems will be shut down in the basement.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

map of Huestis Hall

11/13/23, 11/15/23, 11/16/23, 11/30/23 Lokey Labs Electrical Shutdowns

UPDATE 11/14/23:
Due to holiday work schedules, the electrical shutdown planned for Monday, November 20th has been moved to Thursday, November 30th.

 

Dates and Times Involved:

  • Monday, November 13, 2023, at 6:00 am to 9:00 am
  • Wednesday, November 15, 2023, at 6:00 am to 9:00 am
  • Thursday, November 16, 2023, at 6:00 am to 8:00 am
  • Monday, November 20, Thursday, November 30, 2023, at 6:00 am to 8:00 am

Building(s) or Area(s) Affected:  Lokey Labs

Scope:  As part of the Huestis Hall Renovation project, there will be a final series of electrical shutdowns necessary to complete the project of separating the feeder connections from Huestis Hall and refeed Lokey Labs. The final series of electrical shutdowns will occur on November 13, 15, 16, and 20 and will affect Lokey Labs. Affected services and durations are listed by date below.

Monday, November 13, 6:00 am – 9:00 am at Lokey Labs
6:00 am – 7:00am Lighting control panels and lights will be offline for the first hour.
6:00 am – 9:00 am This shutdown will turn off the supply air handling units and lab exhaust fans, chilled water pumps and heating water pumps for 3 hours.  Siemens will monitor for alarms.

Wednesday, November 15, 6:00 am – 9:00 am at Lokey Labs
6:00 am – 7:00 am Lighting control panels and lights will be offline for the first hour.
6:00 am – 9:00 am This shutdown will turn off the supply air handling units and lab exhaust fans, chilled water pumps and heating water pumps for 3 hours.  Siemens will monitor for alarms.

Thursday, November 16, 6:00 am – 8:00 am at Lokey Labs
All normal power supply will be offline for the 2-hour duration. Users are advised to safely power down equipment the night before or ensure that critical equipment is plugged into a standby outlet or UPS.

Monday, November 20, Thursday, November 30, 6:00 am – 8:00 am at Lokey Labs
All normal power supply will be offline for the 2-hour duration. Users are advised to safely power down equipment the night before or ensure that critical equipment is plugged into a standby outlet or UPS.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.  For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu.  For non-copier questions, please reach out to the contact person listed below.

Work Performed By:  EC, Siemens and Lease Crutcher Lewis

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Lokey Labs

11/17/23 Klamath Hall Lab Exhaust Fan Testing and Fume Hood Shutdown

Begin:  Friday, November 17, 2023, at 7:00 am

End:      Friday, November 17, 2023, at 8:00 am

Building(s) or Area(s) Affected:  Klamath Hall – Basement, Ground, First, and Second Floors

Scope:  Lab exhaust fans will be shut off for 5-10 minutes to test alarm activation and notification.

Services Impacted:  Fans will be tested one at a time, reduced exhaust air volume can be expected and some local low flow alarms at fume hoods.

Special Instructions:  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Work Performed By:  CPFM Facilities, Siemens

ContactKevin Waldrop, CPFM Facilities Engineer, 541-346-2315 or 541-525-4326

Current construction and impacts information can be found on the UO Maps site.

Image of Klamath Hall

11/03/23 – 11/06/23 Huestis Hall, Lokey Labs, Streisinger Hall, Klamath Hall, and Willamette Hall Electrical and RO/DI Water Shutdown

UPDATE/CORRECTION:
Network servers will be down on Friday, November 3rd.  Users should power down computers and equipment.

 

Begin:  Friday, November 3, 2023 – see times below

End:      Monday, November 6, 2023 – see times below

Building(s) or Area(s) Affected:  Huestis Hall, Lokey Labs, Streisinger Hall, Klamath Hall, and Willamette Hall

Scope:  As part of the Huestis Renovation project, there will be a series of electrical shutdowns necessary to make the final connections for the project.  These shutdowns will impact Huestis Hall and neighboring science buildings.  The first series of shutdowns will occur on November 3 and November 6.  Affected services and durations are listed by date and building below.

Friday, November 3, 5:00 am – 9:00 am – Electrical to Huestis Hall, Lokey Labs.  RO supply to Klamath Hall, Streisinger Hall, Willamette Hall

Huestis Hall: Electrical shutdown will affect all equipment on normal power during the transfer of normal loads to generator back up.  All services provided by steam, chilled water, HVAC supply and exhaust will be affected during the transitions from normal to backup and again.  Huestis RO faucets will be offline.

Network servers will be supported by local UPS units and battery panels.

Lokey Labs: Electrical shutdown will affect all equipment and systems running on normal power in rooms 76, 87 and 96.  Occupants are advised to power down all equipment in rooms 76, 87 and 96.  Chilled water will be offline.  Standby will also be offline and unavailable for this duration.

Klamath Hall, Streisinger Hall, and Willamette Hall: RO water supply will not be available as booster pump 1 will be offline in Huestis Hall during this outage.

Monday, November 6, 6:00 am – 10:00 pm – Huestis Hall, Lokey Labs, and Streisinger Hall – Standby Power outage

The standby power source will be offline for the duration of this shutdown. Users are not expected to experience any impacts during this outage but should be aware that the redundant power source is not available.

Copier Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.  For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu.  For non-copier questions, please reach out to the contact person listed below.

Work Performed By:  EC, JHK, Siemens, Lewis

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis, Lokey Labs, Streisinger, Willamette, and Klamath

11/28/23 Huestis Hall Basement Heat Exchangers Shutdown

UPDATE 11/09/23:
The heating water system shutdown has been rescheduled for Tuesday, November 28th.   This was due to the upcoming steam shutdown on November 30th, and needing to do this work in sequence.

 

BeginNovember 9, Tuesday, November 28, 2023, at 6:00 am

End:      November 9, Tuesday, November 28, 2023, at 3:30 pm

Building(s) or Area(s) Affected:  Huestis Hall basement

Scope:  Huestis basement heat exchangers will be offline to allow contractors to tie the new heating loop from HX2 and 3 into the existing heating water loop for HX1.

Services Impacted:  This will require the exhaust fans, AHUs, heat exchanger 1, and heating water pumps 1 & 2 serving the Huestis basement to be shut down.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall

10/31/23 – 11/14/23 Klamath Hall Air Balancing Testing Advisory

Begin:  Tuesday, October 31, 2023

End:      Tuesday, November 14, 2023

Building(s) or Area(s) Affected:  Klamath Hall – Basement, Ground, 1st, and 2nd Floors

Scope:  Due to the replacement of exhaust fan motors and associated controls, an exhaust air system rebalance is required.

Services Impacted:  An air balancing consultant will need access to all exhaust grilles to measure air volume and adjust dampers, as necessary.

Work Performed By:  Air Inc.

ContactKevin Waldrop, CPFM Facilities Engineer, 541-346-2315 or 541-525-4326

Current construction and impacts information can be found on the UO Maps site.

Image of Klamath Hall

10/25/23 Huestis Hall Basement Exhaust, HVAC, and Steam Shutdown

Begin:  Wednesday, October 25, 2023, at 5:00 am

End:      Wednesday, October 25, 2023, at 4:30 pm

Building(s) or Area(s) Affected:  Huestis Hall basement

Scope:  Remove existing Steam Flow Meter and add spool / Tie New Steam PRV station in to house MPS. Tie Fish housing MPS into new POC before the new PRV station. Open new LPS to the Fish housing Area.

Services Impacted:  This will affect the exhaust, HVAC air supply, and steam condensate.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

map of Huestis Hall

11/01/23 Huestis Hall Basement Steam Shutdown

UPDATE:
This work has been rescheduled for Wednesday, November 1st as additional coordination was required to complete the piping installation for the new steam supply.

 

BeginOctober 25, Wednesday, November 1, 2023, at 5:00 am

End:      October 25, Wednesday, November 1, 2023, at 4:30 pm

Building(s) or Area(s) Affected:  Huestis Hall basement

Scope:  As part of the Huestis Renovation project, temporary steam source will be refed from the new permanent steam source.  This shutdown will remove the existing steam flow meter and tie into the new PRV station for the permanent steam supply.

Services Impacted:  This steam supply shutdown will take the following equipment offline in Huestis serving the Zebrafish facility and quarantine:

  • Exhaust Fans 1&2
  • AHU 1&2
  • Heat Exchange 1
  • Heating Water pump 1&2

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

map of Huestis Hall

10/09/23 Klamath Hall Chilled Water, Supply Airflow, and Electrical Outage

UPDATE 10/09/23:
Please be aware the hallway lighting will be losing power during the shutdown and will be returning when the shutdown ends.

 

UPDATE 9/29/23:
Additionally, in order to perform the work, and for safety, the steam supply to the building will be isolated.  This could possibly result in lower ambient temperatures within the building but no significant fluctuations are expected.

 

UPDATE 9/22/23:
The previously proposed  shutdown for 9/18/23 has been shortened and the date has been adjusted.  It will now be occurring on 10/9/23 between the hours of 7:00 am and 11:30 am.

Primary building contacts have been contacted, the associated effects of this work have been discussed, and accommodations are being planned for. Should you have considerations you do not feel have been addressed, please reach out to @Damon Rutherford to discuss them.

 

Begin:  Monday, October 9, 2023, at 7:00 am

End:      Monday, October 9, 2023, at 11:30 am

Scope:  As part of improving overall building exhaust flows, a main electrical panel must be disconnected, and upgraded, in order to tie in new exhaust fan equipment.

Services Impacted:  During this work, several pieces of equipment will be out of service, most notably the chilled water and supply airflow. A more detailed list is attached for your reference.

Special Instructions:  Prior to this date, please close fume hood sashes and seal containers within the fume hoods, including the 3rd floor fume hoods.

Work Performed By:  Bridgeway Construction & OEG

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

Current construction and impacts information can be found on the UO Maps site

Image of Klamath Hall

9/28/23 Huestis Hall Condensate Return Line Shutdown

UPDATE:
Due to a material delay, this shutdown will occur on Thursday, September 28.

 

BeginSeptember 26, Thursday, September 28, 2023, at 7:00 am

End:      September 26, Thursday, September 28, 2023, at 3:30 pm

Building(s) or Area(s) Affected:  Huestis Hall Basement

Scope:  As part of the Huestis Renovation project, condensate return unit (CRU-2) will be offline and removed. Existing condensate piping will be rerouted through the new CRU-1 unit.

Services Impacted:

  • The following equipment will be shut down – AHU 1&2, HWP 1&2, EF 1&2 and LEF 1&2.
  • Exhaust, fume hoods, HVAC, heating water, and steam condensate will be affected.
  • Steam Sterilizers will also be offline.

Special Instructions:  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

map of Huestis Hall

 

10/10/23 – 10/11/23 Klamath Hall Exhaust System Shutdown

UPDATE:
The work will now be taking place on Tuesday, October 10th (North Side Exhaust Fans) and Wednesday, October 11th (South Side Exhaust Fans).  Each day’s work will take place from 7am to 4pm.

Primary building contacts have been notified, the associated effects of this work have been discussed, and accommodations are being planned for. Should you have considerations you do not feel have been addressed, please reach out to @Damon Rutherford to discuss them.

 

POSTPONED:
Based on recent findings, and pending further research, this shutdown will be rescheduled to a later date yet to be determined.

 

BeginSeptember 19, 2023, at 6:00 am  Postponed Tuesday, October 10, 2023 at 7:00 am

(daily from 7:00 am to 4:00 pm)

End:      September 20, 2023, at 6:00 pm  Postponed  Wednesday, October 11, 2023 at 4:00 pm

Building(s) or Area(s) Affected:  Klamath Hall – See attached spreadsheet for affected areas

Scope:  As part of the Klamath LEF/VFD upgrade, the mechanical contractor will be shutting down lab exhaust fans sequentially in order to upgrade the fan motors and their accessories.

Services Impacted:

  • During this work, airflow will be lessened substantially, but some will remain (in hoods, general building exhaust, etc.) as the ductwork is interconnected. However, we do not recommend using fume hoods or other equipment tied into the exhaust system during this work as appropriate airflows will not be provided.
  • Also, while the exhaust flow is lessened, there will be minor positive pressure fluctuations until the system is returned to normal operation.
    The north side fans will be shut down on 9/19/23 10/10/23, with the south side fans to follow on 9/20/23 10/11/23. Both shutdowns will be for a full days’ time, with each fan coming back online the following day, individually.

Special Instructions:  Prior to this date, please close fume hood sashes and seal containers within the fume hoods.

 Work Performed By:  Bridgeway Construction & Hermanson

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

Current construction and impacts information can be found on the UO Maps site.

9/12/23 – 9/14/23 Klamath Hall Exhaust Ductwork Inspection Advisory

UPDATE:
The ductwork inspection has been extended through Thursday, September 14th .

 

Begin:  Tuesday, September 12, 2023, at 8:30 am

End:      September 13, Thursday, September 14, 2023, at 4:30 pm

Building(s) or Area(s) Affected:  Klamath Hall

Scope:  Contractors will be visually inspecting exhaust ductwork throughout the building.

Services Impacted:

  • We will need access to all rooms, however, no work or disruptions will occur besides two contractors walking through the area.
  • This will affect all rooms with exhaust ductwork in the basement, ground, first, and second floors.

Work Performed By:  Air Inc.

ContactKevin Waldrop, CPFM Facilities Engineer, 541-346-2315 or 541-525-4326

Current construction and impacts information can be found on the UO Maps site.

Image of Klamath Hall

9/12/23 Streisinger Hall Electrical and HVAC Systems Outage

UPDATE:
The elevator will be offline during this time.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

 

 

Begin:  Tuesday, September 12, 2023, at 7:00 am

End:      Tuesday, September 12, 2023, at 12:00 noon

Building(s) or Area(s) Affected:  Streisinger Hall

Scope:  To tie in new equipment needed to provide electrical service redundancy to Streisinger Hall, making future outages less impactful and safer for our electrical teams, a larger electrical outage is required.

Services Impacted:

Overall outage effects to consider are:

  • It will begin at 7:00 am and end at 12:00 noon (5 hour duration)
  • For the 1st hour, all power to the building will go down (110v, 208v, and 480v service)
  • After the first hour, 120v and 208v, which serves most of your lab equipment, will be live until electrical work is completed at or before 11am. All 480V service will be down for the duration of the work; this is not anticipated to have direct effects to your operations.
  • Between the 1st hour and the electrical work completion time listed above, no HVAC systems will be operating via the controls systems, but the BAS crew will be monitoring systems and making manual adjustments to reduce any risks to your operations.
  • Once the electrical work is completed, and in order to make final connections, the electrical system will go down once more for up to 1 hour.
  • Once the connections have been made all electrical service will be back in place.

We are aware that this is an inconvenience and we will do all we can to expedite the work and accommodate any needs you might have while power is limited. Thank you for your understanding and assistance as we move through this process.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.  For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu.  For non-copier questions, please reach out to the contact person listed below.

Work Performed By:  EC Electric

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

Current construction and impacts information can be found on the UO Maps site.

9/01/23 – 9/30/23 Campus Air Handling Unit Preventative Maintenance Schedule for September 2023

Begin:  September 1, 2023

End:     September 30, 2023

Building(s) or Area(s) Impacted:

  • Lewis Integrative Science Building
  • Zebrafish International Resource Center
  • Volcanology Hall
  • Deschutes Hall
  • Facilities Services Miscellaneous Quonset 131
  • Facilities Services Paint Quonset 129
  • Quonset 108
  • CPFM Warehouse/Shops
  • CPFM Administration
  • Millrace Studios 1, 2, & 3

Scope:  AHU preventative maintenance work is scheduled to be performed, over the course of the month, for the buildings listed above.

Services Impacted:  No services are expected to be impacted.

Work Performed By:  CPFM Preventative Maintenance Crew or Contractor

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of buildings scheduled for air handling unit preventative maintenance for September 2023

8/22/23 Klamath Hall Lab Exhaust Fans Shutdown

Begin:  Tuesday, August 22, 2023, at 8:00 am

End:      Tuesday, August 22, 2023, at 2:00 pm

Building(s) or Area(s) Affected:  Klamath Hall

Scope:  As part of the Klamath LEF/VFD upgrade, the mechanical contractor will be shutting down lab exhaust fans sequentially in order to take field measurements required for proper equipment sizing. During this work, airflow will be lessened substantially, but some will remain (in hoods, general building exhaust, etc.) as the ductwork is interconnected. However, we do not recommend using fume hoods or other equipment tied into the exhaust system during this work as appropriate airflows will not be provided.
Also, while the exhaust flow is lessened, there will be minor positive pressure fluctuations until the system is returned to normal operation.
The fans system is split to serve the north (EF1&2) and south (EF-3&4) side of the buildings, and within the attached spreadsheet you will be able to see which rooms will be affected during the course of this (and future) shutdowns.
The listed timespan is assumed to be accurate, but we will attempt to expedite the work as much as possible.
Thank you for your understanding.

Services Impacted:  This will affect the exhaust system serving the basement, ground level, 1st, and 2nd floors.

Special Instructions:  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Work Performed By:  Hermanson

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

Current construction and impacts information can be found on the UO Maps site.

Klamath Hall LEF Replacement Project Effects

Image of Klamath Hall

8/16/23 Huestis Hall Basement AHU1 & 2 and Lab Exhaust Shutdown

Begin:  Wednesday, August 16, 2023, at 7:00 am

End:      Wednesday August 16, 2023, at 8:00 am

Building(s) or Area(s) Affected:  Huestis Hall Basement

Scope:  Air Handling Units 1 and 2, as well as the lab exhaust fans, will be temporarily offline for routine cleaning.

Services Impacted:  Supply and exhaust air will be offline during this time.

Work Performed By:  FM Sheetmetal and Siemens

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.