Onyx Bridge Room 368 Domestic Cold and Hot Water Shutdown 3/21/22 – 3/25/22

Begin:  Monday, March 21st, 2022

End:      Friday, March 25th, 2022

Building(s) or Area(s) Impacted:  Onyx Bridge – room 368

Scope:  Facilities Services will be removing a fume hood from room 368 during the week of 3/21/22. Water will be shut off at a localized valve and should not impact other spaces. They will need access to 367 to turn off the valves.

Services Impacted:

  • Domestic cold and hot water will be offline during this time in room 368.
  • Access will be needed to room 367.

Work Performed By:  UO CPFM Facilities Services

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

Agate Hall and Agate House Domestic Water Shutdown 2/28/22 – 3/2/22

UPDATE 3/2/22:
The water has been restored.

 

UPDATE:
This shutdown is being extended by one day.
Additional time is need for the excavation work for the new 2” domestic cold water line.

 

Begin:  Monday, February 28th, 2022 at 8:00 am

End:      Tuesday, March 1st, Wednesday, March 2nd, 2022 at 5:00 pm

Building(s) or Area(s) Impacted:  Agate Hall and Agate House

Scope:  Due to a massive leak, the domestic water will be shutdown to repair the main domestic cold line outside.

Services Impacted:  This will affect the domestic hot and cold water to the restrooms, sinks, and drinking fountains.

Work Performed By:  Roto Rooter

ContactNic Patton, CPFM Facilities Plumbing, 541-346-2319

Columbia Hall Domestic Cold and Hot Water Shutdown POSTPONED

UPDATE 2/3/22: Due to a staff  shortage this shutdown has been delayed. An update will be sent out when it has been rescheduled.

BeginThursday, February 3rd, 2022 at 8:30 am Unknown

End:      Thursday, February 3rd, 2022 at 12:00 noon Unknown

Building(s) or Area(s) Impacted:  Columbia Hall

Scope:  In order to make a valve repair on the domestic cold water system, the domestic cold and hot water will be shut down.

Services Impacted:  All restroom sinks, toilets, urinals will be affected. This includes all the cold water and hot water to lab faucets, drinking fountains, fume hoods, and the safety eyewashes/showers.

Work Performed By:  CPFM FS Plumbing Shop

ContactOlin Vermillion, CPFM Facilities Plumbing, 541-346-2319

Huestis Hall Suite 34 Domestic Hot and Cold Water Shutdown 12/1/21

Begin:  Wednesday, December 1st, 2021

End:      Wednesday, December 1st, 2021

Building(s) or Area(s) Impacted:  Huestis Hall, Suite 34

Scope:  As part of the Huestis Renovation Project, the domestic hot and cold water will be shut down to Suite 34.

Services Impacted:  Water will be offline within this work area, which is currently vacated.

Work Performed By:  Mortenson Construction

Contact:  Martina Oxoby, CPFM Owner’s Representative, 541-346-5880

1715 Franklin Natural Gas Shutdown 12/1/21

UPDATE:
The natural gas has been restored.

 

Begin:  Wednesday, December 1st, 2021 at 7:00 am

End:      Wednesday, December 1st, 2021 at 3:00 pm

Building(s) or Area(s) Impacted:  1715 Franklin

Scope:  The natural gas meter is being replaced.

Services Impacted:  The HVAC heating and hot water will be offline on the first and second floors in the north portion of the building.

Work Performed By:  Northwest Natural Gas in conjunction with CPFM

ContactRichard Vaughan, CPFM Facilities Services Lead Worker-Refrigeration Mechanic, 541-346-2319

Klamath Hall Surge Space Construction Advisory 11/11/21 – 5/31/22

UPDATE 4/25: Due to delays the project has been extended to May 31, 2022.

 

UPDATE – NOISE ADVISORY:
Monday, December 13th through Friday, December 17th
Contractors will be performing wall demolition in rooms 018, 018A, 015A, 015B, 019B, 015E, 015D, 015C.
Noise may be heard throughout the building.

 

Begin:  Thursday, November 11th, 2021

End:      Monday, April 25th May 31st, 2022

Building(s) or Area(s) Impacted:  Klamath Hall – 026, 019D, 019E, 019, 018, 018A, 015A, 015B, 019B, 015E, 015D, 015C, and H015.

Scope:  Due to the Huestis deferred maintenance project, the Klamath Prep area will be renovated.

Services Impacted:

  • Expect to hear general construction noise during business hours. Crews will target the loudest and most disruptive activities to occur between 5 am and 8 am.
  • Areas that will be affected are domestic hot and cold water, electrical, fire alarm systems, the HVAC air supply, and the loading dock.
  • Updates to this notice will be submitted for specific activities that may have a further impact on building users.

Work Performed By:  Mortenson Construction

Contact:   Tim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

Esslinger Hall Surge Space Construction Advisory 11/11/21 – 5/20/22

UPDATE 4/29: There is still some punch list work to complete. The end date is extended to 5/20.

Begin:  Thursday, November 11th, 2021

End:      Friday, April 29th, 2022 May 20th, 2022

Building(s) or Area(s) Impacted:  Esslinger Hall – Rooms 112, 116, 122, 160, 156A, and 166.

Scope:  Due to the Huestis deferred maintenance project, selective areas within Esslinger Hall will be under construction to provide “surge” space for those displaced out of Huestis Hall.

Services Impacted:

  • The noisiest activities will occur before 8am or after 5pm, but general construction activity will be occurring during business hours, through May of 2022.
  • Areas that will be affected are domestic hot and cold water, electrical, exhaust, fire alarm systems, and the HVAC air supply.
  • Updates to this notice will be submitted for specific activities that may have a further impact on building users.

Work Performed By:  Mortenson Construction

Contact:   Tim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

Gerlinger Annex Domestic Cold and Hot Water Shutdown 11/16/21

UPDATE:
The water has been restored.

 

Begin:  Tuesday, November 16th, 2021 at 7:00 am

End:      Tuesday, November 16th, 2021 at 3:00 pm

Building(s) or Area(s) Impacted:  Gerlinger Annex

Scope:  The domestic water will be shut down to make repairs to the shower valves in the basement, plus address the water flow issue in the 1st floor breakroom sink.

Services Impacted:  Domestic hot and cold water will be offline to all floors, affecting restrooms, sinks, and drinking fountains.

Work Performed By:  CPFM FS Plumbing Dept.

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

Buildings North of ZIRC Steam Heat Shutdown 11/01/21

UPDATE 11/1 at 3:26 PM: Steam has been temporarily restored. Further investigation and steam shutdowns will be required to permanently resolve the problem, but notifications will be sent out.

UPDATE 11/1: The steam pipe repairs are more extensive than originally anticipated. Steam heat will be down to the buildings north of ZIRC, including the greenhouses, for an unknown amount of time. An update will be sent when the steam is restored.

UPDATE 11/1: The water was restored and the restrooms are back online.

UPDATE 11/1: Due to an unforeseen issue with the steam pipe, the domestic water to Building 136 will be off for an unknown amount of time. An update will be sent out as soon as we find out more. The water is still on at Building 130 so please use the bathrooms there.

Begin: Monday, November 1st, 2021 at 8:00 am

End: Monday, November 1st, 2021 at 3:26 pm

Building(s) or Area(s) Impacted: CPFM Administration Quonset, FS Lock and Key Shop, MNCH Archaeological Research Lab, Paleoecology Research, Archaeology Research, MNCH Prep Lab, Quonset 108, and Greenhouses

Scope: The domestic water will be shut down for approximately one hour to repair a pipe damaged during construction work.

Services Impacted: The domestic hot and cold water will be offline.

Special Instructions: Please use the sinks and restrooms in nearby buildings during this time.

Work Performed By: Fortis Construction

Contact: Colin Brennan, CPFM Owner’s Representative, 541-346-8242 or 541-654-2972

Klamath Domestic Hot Water Shutdown 10/29

UPDATE 10/29: The domestic hot water has been restored.

Begin:  Effective immediately – Friday, October 29, 2021

End:      Unknown Friday, October 29, 2021

Building(s) or Area(s) Impacted:  Klamath Hall

Scope: A steam valve issue caused the need for an immediate shutdown of all domestic hot water to the building. The time needed to make repairs is unknown. An update will be sent when the water is turned back on.

Services Impacted: All domestic hot water throughout the building.

Work Performed By: CPFM Facilities Plumbing & Building Automation Systems

Contact: Ron Warren, CPFM Facilities Plumbing, 541-346-2319

CPFM Administration Quonset Water Line Damage Advisory 10/28/21

Begin:  Effective immediately – Thursday, October 28, 2021

End:      unknown

Building(s) or Area(s) Impacted:  CPFM Administration Quonset (Bldg. #136)

Scope:  A water line was broken by the contractors for ZIRC and has caused the domestic water to turn bright orange.  We have been told that the water will be turned off at some point during the day to make repairs, and this may take up to a 3 or 4 hours.  Updates will be sent as information is known.

Services Impacted:

  • Water will be offline later during the day – current time unknown.
  • Water will be discolored for a while.
  • Please use the sinks and restrooms in the Warehouse (Bldg. #130) as needed.

Work Performed By:  Contractor

Contact:   Work Control Center, Campus Planning and Facilities Management, 346-2319

Lokey Education Building (A&B) Domestic Water Shutdown 10/8/21

Begin:  Friday, October 8th, 2021 at 7:00 am

End:      Friday, October 8th, 2021 at 7:30 am

Building(s) or Area(s) Impacted:  Lokey Education Building (A & B)

Scope:  The domestic water will be shut down while EWEB replaces a water meter.  The process should take approximately 15-30 minutes to complete.

Services Impacted:  Domestic water will be offline during this time, affecting sinks, drinking fountains, and restrooms.

Work Performed By:  EWEB

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

Onyx Bridge Steam and Hot Water Shutdown 9/13/21 and 9/18/21

UPDATE:
This same work will also be taking place on Saturday, September 18th, 2021 from 9:00 am to 5:00 pm.

 

Original Schedule: Monday, September 13th, 2021 at 7:00 am – 3:00 pm

Work To Continue On:  Saturday, September 18th, 2021 at 9:00 am – 5:00 pm

Building(s) or Area(s) Impacted:  Onyx Bridge

Scope:  The building steam will be offline due to demo work being done on the building’s steam system in preparation of scheduled abatement work.

Services Impacted: This will affect the building’s heating system, domestic hot water, and steam condensate.

Special Instructions: Fume hood sashes will need to be closed and containers within the fume hoods sealed prior to the shutdown.

Work Performed By: CPFM FS Mechanical Crew

Contact: Ken Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

Columbia Hall Utility Steam and Hot Water Shutdown 9/14/21

Begin:  Tuesday, September 14th, 2021 at 7:00 am

End:      Tuesday, September 14th, 2021 at 3:00 pm

Building(s) or Area(s) Impacted:  Columbia Hall

Scope:  The utility steam and hot water will be shut down to repair a failed condensate return pump and address a lack of valves.  New valves and piping will be added during the pump repair to increase safety and limit future maintenance impacts.

Services Impacted:  This will affect the heating system and hot water.  BAS will be turning off or adjusting the heating controls as appropriate for the specific heating equipment.

Work Performed By:  CPFM Utilities & Energy

ContactKyle Wilson, CPFM Utilities Maintenance Manager, 541-346-2246

Klamath Hall Domestic Hot Water Advisory 8/9/21 – 9/1/21

UPDATE 9/1/21: The domestic hot water is restored.

 

Begin:  Monday, August 9th, 2021 – effective immediately

End:      Unknown

Building(s) or Area(s) Impacted:  Klamath Hall

Scope:  The domestic hot water was found not working today.  It will be luke warm until further notice.  Parts will be order by the BAS shop.

Services Impacted:

  • Domestic hot water temperature reduced to the restrooms, custodial closets, and eyewash stations.
  • This does not affect the Industrial hot water.

Work Performed By:  CPFM BAS and Plumbing Shops

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

Pacific Hall Domestic and Industrial Water Shutdown 7/29/21

UPDATE:
The water has been restored.

 

Begin:  Thursday, July 29th, 2021 at 7:30 am

End:      Thursday, July 29th, 2021 at 12:00 noon

Building(s) or Area(s) Impacted:  Pacific Hall

Scope:  The domestic and industrial water will be shut down to replace a frozen shut-off valve on the domestic and industrial cold water for a lab sink in room 234B.

Services Impacted:

  • This will affect the entire building’s domestic and industrial hot and cold water, including restrooms and drinking fountains.
  • RO water will not be affected.

Work Performed By:  CPFM FS Plumbing Dept.

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

Willamette Hall Steam Supply/Heating Water Shutdown 6/22/21

Begin: Tuesday, June 22nd, 2021 at 7:00 am

End: Tuesday, June 22nd, 2021 at 3:00 pm

Building(s) or Area(s) Impacted:  Willamette Hall

Scope:  The steam supply/heating water will be shut down in order to replace the heating water main isolation valve in Mechanical Room #50.  This will be happening at the same time as the Hot Water shutdown to remove a backflow assembly.

Services Impacted: This will affect the steam condensate, building heat, and the domestic hot water in sinks.

Work Performed By: CPFM FS Mechanical Shop

Contact: Richard Vaughan, CPFM Facilities Services, 541-346-2319

Willamette Hall Hot Water Shutdown 6/22/21

UPDATE:

The domestic hot and cold water have been restored.

 

Begin:  Tuesday, June 22nd, 2021 at 7:00 am

End:      Tuesday, June 22nd, 2021 at 3:00 pm

Building(s) or Area(s) Impacted:  Willamette Hall

Scope:  The hot water will be shut down in order to remove a 2.5” backflow assembly and install a bypass valve.  This will be done at the same time as the Steam Supply/Heating Water shutdown.

Services Impacted:

  • The hot water will be offline to sinks and restroom faucets.
  • The domestic cold water and the RO water will not be affected.

Work Performed By:  CPFM FS Plumbing Shop

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

Onyx Bridge Water Shutdown 6/9/21

Begin: Wednesday, June 9th, at 7:30 am

End: Wednesday, June 9th, at 4:00 pm

Building(s) or Area(s) Impacted:  Onyx Bridge

Scope:  The building water and the autoclave steam will be shut down in order to repair the acid waste line on the 3rd floor.

Services Impacted:  The autoclave steam, chilled water, domestic hot and cold water, hot water, and the RO/DI water will be offline.  This will affect restrooms, sinks, and drinking fountains.  Fire sprinklers will not be affected.

Work Performed By: CPFM FS Plumbing Shop

Contact: Ken Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

Streisinger Hall Domestic and Industrial Water Shutdown 6/3/21

Begin:  Thursday, June 3rd, 2021 at 9:00 am

End:      Thursday, June 3rd, 2021 at 9:30 am

Building(s) or Area(s) Impacted:  Streisinger Hall

Scope:  The cold water will be shut down for backflow testing in the Mechanical Room #190.

Services Impacted:

  • Cold water supply to Domestic Cold & Hot Water and the Industrial Cold & Hot Water, to the entire building, will be offline for approximately 30 minutes max.
  • RO water will not be effected.

Work Performed By:  CPFM FS Plumbing Shop

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

Hayward Field Human Physiology Heating Water, Chilled Water, & Steam Shutdown 5/30/21 – 6/11/21

Begin:  Sunday, May 30th, 2021 at 7:00 am

End:      Friday, June 11th, 2021 at 3:30 pm

Building(s) or Area(s) Impacted:  Hayward Field – Human Physiology area (NW corner)

Scope:  Harvey and Price will install a bypass around the heating water flow meter, bypass around the chilled water flow meter, and bypass around the steam flow meter serving SHX-1.  Work will be performed in the mechanical room serving the Human Physiology suite in Hayward Field. Outage will not affect areas outside of Human Physiology.

Services Impacted:  This work will require shutdown to the following services: HVAC heating water system and chilled water system and the steam line feeding the domestic water heater SHX-1; domestic hot water; and heating and chilled water serving AHU-105.

Work Performed By:  Harvey & Price

ContactGene Mowery, CPFM Owner’s Representative, 541-346-5593

 

Oregon Hall Emergency Water Shutdown 4/23/21

UPDATE 4/23 at 9:45am: The water has been restored.

REVISED:

The repair is now requiring that the domestic cold and hot water to the entire building be shut down.  It is still expected to be done within the same time frame.  A notice will be sent when the water has been restored.

 

Begin:  Friday, April 23rd, 2021 – effective immediately

End:      Friday, April 23rd, 2021 – approximately 11:00 am

Building(s) or Area(s) Impacted:  Oregon Hall’s east side

Scope:  Emergency water shutdown to the east side of the building in order to repair a leak.

Services Impacted:  Restrooms and water fountains on the east side of the building on all floors

Extra Notes:  Please use the restrooms in nearby buildings

Work Performed By:  UO CPFM Facilities Services

ContactKen Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

Computing Center Emergency Water Shutdown 4/8/21

Begin:  Thursday, April 8th, 2021 at 7:30 am

End:      Thursday, April 8th, 2021 at 9:30 am

Building(s) or Area(s) Impacted:  Computing Center

Scope:  EWEB needs to change out a failed water meter, requiring an emergency shutdown of the building’s main water line.  UO staff will be on site to monitor the building alarm systems and mechanical equipment.

Services Impacted:  Water will be offline, affecting restrooms, sinks, drinking fountains, and the building fire sprinkler system.

Special Instructions: Any alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  EWEB

ContactKen Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

Metalsmithing Fine Arts Studio 125C Domestic Water Shutdown 3/16/21

Begin:  Tuesday, March 16, at 7:30 am

End:      Tuesday, March 16, at 12:00 noon

Building(s) or Area(s) Impacted:  Metalsmithing Fine Arts Studio

Scope:  Domestic cold and hot water will be shut down for plumbers to cap off water due to upcoming room changes.

Services Impacted:  All domestic water will be offline

Work Performed By:  CPFM Facilities Services Plumbing Shop

ContactKen Straw, Interim Mechanical & Plumbing Shop Manager, 541-346-5406

Willamette Hall Water Shut Off 2/16 – 2/16

2/22/21 Update for Willamette Hall:

The drying phase of the Willamette Hall Room 156 water intrusion has been completed. Equipment will be removed and the cove base restored today and tomorrow. Carpets in 160, 161, & 162 will then be shampooed and the furnishings removed to their original locations.

The restoration phase of this water intrusion will be managed by CPFM. Please contact CPFM Work Control if you have any questions.

2/19/21 Update:

This is an update to the notification sent on February 18, 2021, regarding the Willamette Hall Room 156 Water Intrusion.

The mitigation equipment has been set up in Willamette Hall, including H160, 160, and 161. The equipment will run for the weekend. We will reassess on Monday morning and remove the equipment as we can.

Please feel free to contact EHS, Adam Jones, 541.346.8397 if you have any questions.

 

A water intrusion has been identified in Willamette Hall. It is currently known to be affecting rooms H160, 160, & 161.

 This intrusion occurred on Tuesday, February 16, 2021 and was the result of a clogged drain in room 156. Impacts to walls and carpets were noted in rooms 160, 161, and H160.

 The mitigation process is tasked with drying all affected materials with the ultimate goal of limiting demolition and preventing mold growth. The mitigation process is managed by Environmental Health & Safety. Mitigation efforts onsite will be conducted by CPFM. During this period, you will see fans and well dryers set up, as well as dehumidification equipment. It is important that this equipment is left running at all times to ensure that impacted building materials are dried appropriately and in a timely fashion. Mitigation is anticipated to be complete by early next week.

 The reconstruction process is tasked with returning the space to finished and operational status. The reconstruction process is managed by CPFM.

 Both mitigation and reconstruction are conducted by University staff whenever possible to save money and reduce complications associated with the work. Outside contractors are used when mitigation or reconstruction scopes exceed our available staff or equipment resources. Further information on the University’s Water Intrusion process can be found by contacting Adam Jones at asjones@uoregon.edu.

Individual departments are responsible for inventorying damaged non-building related items, such as computers, office furnishings, lab equipment, etc. The Office of Risk Management within Safety & Risk Services is available to provide guidance, inventory forms, and other information on the insurance process associated with these claims. This information can be found at https://safety.uoregon.edu/property-claims.

Finally, all future updates associated with this event will be posted to the CPFM BLOG for the event at this link: https://blogs.uoregon.edu/cpfmnotifications/2021/02/16/willamette-hal-water-shut-off-2-16-unknown/

UPDATE: The building water has been restored.

Begin:  February 16, 2021 – Immediately

End:      Unknown – An update will be sent when the water has been restored.

Building(s) or Area(s) Impacted:  Willamette Hall

Scope:  All water in Willamette Hall is unusable. There was a sewage leak and all water to the building is shut off for repairs. This includes toilets, sinks, showers, drinking fountains, etc.

Services Impacted:  All building water.

Extra Notes: An update will be sent when the water has been restored.

Special Instructions: Do not use any water in the building.

Work Performed By:  FS Mechanical Shop

Contact: Richard Vaughan, CPFM Facilities Services, 541-346-2319