9/09/24 Klamath Hall Room 271 Cold Room AC Unit Work Advisory

Begin:  Monday, September 9, 2024, at 7:00 am

End:      Monday, September 9, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  Klamath Hall room 271

Scope:  Harvey and Price will be in room #271 to review the cold room’s AC unit issues.

Services Impacted:  Contractor will be in the room and noise can be expected during this time.

Work Performed By:  Harvey & Price

ContactWaymon Banks, CPFM Owner’s Representative, 541-346-0196

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Klamath Hall room 271

8/05/24 – 8/06/24 Lillis Hall Emergency AHU-3 Shutdown

UPDATE:
A second coat of sealant needed to be used on the leak.  The AHU unit is expected to be returned to service around 12:00 noon today.

 

Begin:  Monday, August 5, 2024 – effective immediately

End:      Unknown   Tuesday, August 6, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Lillis Hall

Scope:  Due to a leak in the seam of the AHU-3 unit on Friday, repair work has been taking place today.  They are hoping to finish it this afternoon.  An update will be sent when services have been restored.

Services Impacted:  Cooling will be affected on the 3rd and 4th floors east side of the building.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map image of Lillis Hall

8/01/24 – 8/31/24 Campus Air Handling Unit Preventative Maintenance Schedule for August 2024

Begin:  August 1, 2024

End:     August 31, 2024

Building(s) or Area(s) Impacted:

  • Black Cultural Center
  • Klamath Hall
  • Museum of Natural and Cultural History
  • Viv Olum Child Development Center
  • Viv Olum Child Development Center Annex
  • AAA Woodshop
  • 1859 E. 15th (Hart House)
  • Miller Theatre Complex
  • Villard Hall
  • Friendly Hall
  • Fenton Hall
  • Chapman Hall
  • University Hall
  • Fine Arts 125A
  • Fine Arts 125C
  • Wilkinson House

Scope:  AHU preventative maintenance work is scheduled to be performed, over the course of the month, for the buildings listed above.

Services Impacted:  No services are expected to be impacted.

Work Performed By:  CPFM Preventative Maintenance Crew or Contractor

Contact:  Work Control Center, Campus Planning and Facilities Management, 541-346-2319.

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of the buildings affected by the Campus Air Handling Unit Preventative Maintenance Schedule for August 2024

McKenzie Hall North Section 4th Floor HVAC System Shutdown 7/09/24 – 7/11/24

Begin:  July 9, 2024 – effective immediately

End:      Thursday, July 11, 2024 – end of day

Building(s) or Area(s) Affected:  McKenzie Hall 4th Floor

Scope:  Due to a carpeting project involving asbestos abatement work in suites 440 and 441, air handler AHU-6 has been shut down in the north end of the 4th floor.

Services Impacted:  Cooling will be offline during this time.

Work Performed By:  Contractor

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map image of McKenzie Hall suite 440 and 441

8/07/24 Campus Wide Annual Electrical Testing Day Advisory

CPFM Utilities and Energy will perform Island Mode testing on Wednesday, August 7, 2024, between the hours of 8:00 am and 3:00 pm. Utilities and Energy staff will switch the entire campus in and out of Island Mode twice per hour (see full schedule below).  The first test will begin at the top of the hour, shifting off of EWEB’s electrical grid and onto our own power generation system (called Island Mode).  At 15-minutes after the hour, we will exit out of Island Mode and return back to EWEB’s power source.  This cycle will be repeated again at 30-minutes after the hour, re-entering Island Mode and 45-minutes after the hour when exiting Island Mode.  If problems occur during any of the planned fourteen (14) island mode tests, power outages up to 10-seconds in duration may occur.

We will also be conducting building level tests on four different locations.  The buildings listed will be without power for 60-90 minutes.  The work to be performed includes breaker testing and repair, electrical system repairs, transfer switch test and repairs, arc flash hazard study data gathering, programmable logic updates, replace inoperative equipment, and re-torque main lugs.

8:00 – 9:30 am            CPFM Compound (Bldgs. 130, 136, Lock shop, Wilkinson House, Quonsets)
10:00 – 11:30 am          Many Nations Longhouse – Full power outage
12:30 – 1:30 pm            Deschutes Hall – Full power outage
1:30 – 3:00 pm             Ford Alumni Center – Standby fire/life safety will stay on

The electrical distribution system redundancy and resiliencies depend upon the properly functioning power generation system and island mode capabilities.

Thank you for your patience as we resolve our issues related to entering and exiting island mode. On-site personnel will include the original electrical engineer who designed the system, ASCO technicians and a new company that brings more resiliency and oversight for Utilities and Energy.

Island Mode Testing Schedule:

:00 am – Start island mode
8:15 am – Exit island mode
8:30 am – Start island mode
8:45 am – Exit island mode

9:00 am – Start island mode
9:15 am – Exit island mode
9:30 am – Start island mode
9:45 am – Exit island mode

10:00 am – Start island mode
10:15 am – Exit island mode
10:30 am – Start island mode
10:45 am – Exit island mode

11:00 am – Start island mode
11:15 am – Exit island mode
11:30 am – Start island mode
11:45 am – Exit island mode

12:00 noon – Start island mode
12:15 pm – Exit island mode
12:30 pm – Start island mode
12:45 pm – Exit island mode

1:00 pm – Start island mode
1:15 pm – Exit island mode
1:30 pm – Start island mode
1:45 pm – Exit island mode

2:00 pm – Start island mode
2:15 pm – Exit island mode
2:30 pm – Start island mode
2:45 pm – Exit island mode

3:00 pm – All clear message sent via Work Control

Network Impacts: When any building’s power is off, its wired and wireless networks will also stop working. During the Island Mode power testing:

  • Expect intermittent campuswide network outages.
  • Localized lingering network outages may occur if network devices fail. If so, Information Services staff will post notices on the IT Service Status website. Recovery will begin after CPFM issues its all-clear message and could take a day or longer.

Information Services (IS) offers the following guidance about protecting electronic devices from power surges during the Island Mode power testing.

Before the Testing – Turn Off Sensitive Electronics

  • It is recommended that sensitive electronic devices be shut down and unplugged before the power testing begins. Sensitive devices include research equipment, multifunction copiers, digital display panels, etc. Such devices can be damaged by the power surge when the power is turned back on. Surge protectors, while helpful, don’t guarantee that devices will be preserved. Please check with your IT support for questions or help.

Who needs to take action depends on the type and location of the equipment:

  •  Sensitive electronic devices:
    • Shut down and unplug research equipment, multifunction copiers, digital display panels, and other sensitive electronics.
  • Classrooms scheduled by the Office of the Registrar:
  • Other classrooms and non-classroom areas:
    • Shut down departmental AV equipment, such as conference room systems and AV equipment in departmentally controlled classrooms. Please check with your IT support for questions or help.
    • Preparations may be handled by the User Support Services team in Information Services, by departmental IT staff where applicable, or by other departmental staff, following existing patterns of support.

After Testing Ends – Power On Electronic Devices

Contacts:

Locations not included in the Island Mode testing:  
510 Oak Street
515 E. Broadway
942 Olive
1600 Millrace
1700 Millrace
1715 Franklin
1900 Millrace
Alder Building (818 E.15th)
Baker Downtown Center (975 High St.)
EC Cares Buildings (1500 W. 12th Ave plus modules)
Fleet Services Building (Glenwood) (3233 Franklin Blvd.)
KWAX (75 Centennial Loop)
McMorran House (2315 McMorran Drive)
PeaceHealth North (677 12th Ave.)
Rainier (1244 Walnut St.)
Romania Warehouse (2020 Franklin Blvd.)
South A Warehouse (1199 South A St., Spfld.)
Thompson University Center (720 E. 13th Ave.)
Transportation Services (1401 Walnut St.)
Tree Tops (2237 Spring Blvd.)
UOPD East Station (2141 E. 15th Ave.)

Current construction and impacts information can be found on the UO Maps site.

overhead image of the campus map

 

5/30/24 – Unknown – Pacific Hall Elevator, HVAC, Chilled Water, and Possible Emergency Power Shutdown

UPDATE 6/18/24 PM – Elevator:
The elevator has been restored to service.  Parts arrived today and the damaged components have been replaced.

UPDATE 6/18/24 AM – Elevator:
The elevator remains down due to damaged components caused by the flooding incident.  Parts are on order and an update will be provided when the elevator is back online.

UPDATE 5/31/24 – HVAC:

  • The HVAC system (heating, ventilation, and air conditioning) for the north end of the building is expected to be offline for 2 – 4 weeks.  (see diagram below for specific areas affected).
  • Cooling has been restored to the freezer farm in room 17.

Diagram of Pacific Hall - HVAC Offline in Affected Rooms 5-31-24

UPDATE 5/31/24 – Elevator:
The elevator will remain offline till approximately Tuesday, June 4th.  Please use Lawrence Hall or Onyx Bridge’s elevators during this time.

UPDATE 5/30/24 – Elevator, HVAC, Chilled Water:
The elevator has been taken offline due to the flooding in the subbasement.  The elevators in Onyx Bridge are still accessible.  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

The HVAC system and the chilled water have also been shut down.

 

Begin: Thursday, May 30, 2024

End:     Unknown

Building(s) or Area(s) Affected: Pacific Hall

Pacific Hall may experience an emergency power shutdown due to a major chilled water leak happening right now.  Crews are attempting to isolate the leak but due to safety issues power may need to be shut down.

Work Performed By: Utilities and Energy & Facilities Services

Contact: Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Overhead map Image of Pacific Hall

5/23/24 – 5/24/24 Gerlinger Annex Emergency AHU-5 Shutdown

Begin:  Thursday, May 23, 2024 – Effective Immediately

End:      Friday, May 24, 2024 – In the Morning

Building(s) or Area(s) Affected:  Gerlinger Annex

Scope:  Shutting down air handling unit, AHU-5, overnight for maintenance/diagnostics and will be turning back on tomorrow morning.

Services Impacted: Air flow and temperatures will be reduced on the lower west side of the building.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Over head map image of the lower west side of Gerlinger annex

4/23/24 – 4/26/24 McKenzie Hall Emergency AHU-5 and AHU-6 HVAC Shutdown

UPDATE 4/26/24 12:00 noon
The work has been completed and the units are working fully now.

 

Begin:  Tuesday, April 23, 2024 – effective immediately

End:      Friday, April 26, 2024 – by end of day

Building(s) or Area(s) Affected:  McKenzie Hall

Scope:  The drives have failed on the supply air of AHU-6 and the return air of AHU-5.  Parts are on hand and repair work has already begun.  Both units are expected to be brought online by the end of the day on Friday, 4/26/24.  An update will be sent if services are restored earlier than 5:00 pm.

Services Impacted:  This will affect the heating and cooling on the northside of the building on floors 2 through 4.  There is still air flow, but the heating and cooling will be limited.  Impacts should be minimal and intermittent.

Work Performed By:  CPFM Facilities Service

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of McKenzie Hall

3/11/24 – 3/14/24 Oregon Hall Chilled Water Shutdown

Begin:  Monday, March 11, 2024, at 12:00 noon

End:      Thursday, March 14, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Oregon Hall

Scope:  Due to the installation of a new chilled water meter, the building air conditioning will be shut down.

Services Impacted:

  • This will affect the Oregon Hall Main Building Only.
  • This shutdown will NOT affect the Oregon Hall Data Center!
  • This work is planned during winter weather and will have little to no impact on building users.
  • Work will take place in the utility tunnel.

Work Performed By:  S2 Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Oregon Hall

1/09/24 and 1/12/24 Huestis Hall and Lokey Labs Fume Hoods, Exhaust, HVAC Air Supply and Fire Alarm System Shutdown

1st Day:             Tuesday, January 9, 2024, from 7:00 am until 4:00 pm

2nd Day:           Friday, January 12, 2024, from 7:00 am until 4:00 pm

Building(s) or Area(s) Affected:  Huestis Hall and Lokey Labs

Scope:

  • Huestis Hall: On Tuesday 1/9 and again on Friday 1/12 from 7:00 am – 4:00 pm, air and exhaust systems will be offline in the basement as the temporary AHU and exhaust fans are removed and final connections to building AHU units and lab exhaust fans are reconnected. User access to Huestis rooms 6, 12 and 13 should be limited or avoided during this shutdown.
  • Lokey Labs and Huestis Hall:  On Tuesday, 1/9 from 7:00 am until 4:00 pm, the fire alarm system will be offline to Huestis and Lokey Labs during this shutdown. Contractor will provide fire watch.

Services Impacted:  This will affect exhaust, fire alarm systems, fume hoods, heating, cooling, and the HVAC air supply.  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  JH Kelly, FM Sheetmetal, IES

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall and Lokey Labs

10/16/23 – 10/17/23 Esslinger Hall Rooms 190, 190A, 190B, 199 Emergency Air Conditioning Shutdown

Begin:  Monday, October 16, 2023 – effective immediately

End:      Tuesday, October 17, 2023 – around 12:00 noon

Building(s) or Area(s) Affected:  Esslinger Hall Rooms 190, 190A, 190B, and 199

Scope:  An emergency shut down of the air conditioning has occurred in the rooms listed.  Repairs are being made and the system is expected to be back online around noon tomorrow.  An update will be sent when services have been restored.

Services Impacted:  Cooling will be offline.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Esslinger 190, 190A, 190B, 199

10/18/23 Lawrence Hall Electrical Shutdown

UPDATE:
To ensure a smooth transition back into the school day, the electrical shutdown has been rescheduled for Wednesday, October 18th.  The time will remain the same (5:00 am to 7:00 am).

 

Begin:  Wednesday, October 11 18, 2023, at 5:00 am

End:      Wednesday, October 11 18, 2023, at 7:00 am

Building(s) or Area(s) Affected:  Lawrence Hall

Scope:  New electrical panel in Lawrence 188 must be tied in to existing, main electrical panel in Lawrence Hall.  Work will be performed early in the morning.

Services Impacted:  This will shutdown the lighting, electrical outlets, elevators, BAS controls fire alarm panels and IT closets within the building.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.  For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu.  For non-copier questions, please reach out to the contact person listed below.

Additional Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  OEG

ContactDavid Mason, CPFM Owner’s Representative, 541-346-5679

Current construction and impacts information can be found on the UO Maps site.

Image of Lawrence Hall

 

7/25/23 Knight Library Air Conditioning Shutdown

Begin:  Tuesday, July 25, 2023, at 6:00 am

End:      Tuesday, July 25, 2023, at 12:00 noon

Building(s) or Area(s) Affected:  Knight Library

Scope:  The air conditioning for the library will be temporarily shut down the morning of July 25th to accommodate renovations occurring in the basement.

Services Impacted:  The air conditioning to the building will be offline except the Special Collections system and a few other areas of the library will remain functional.  The entire system is expected to be on again by midday.

Work Performed By:  Harvey & Price and CPFM Facilities Services

ContactJanell Cottam, CPFM Owner’s Representative, 541-346-7536, Bruce Budzik, CPFM Small Projects & Cap Imp Manager, 541-346-8834

Current construction and impacts information can be found on the UO Maps site.

Image of Knight Library

5/30/23 Onyx Bridge Cold Room 485 Emergency A/C Shutdown

Begin:  Tuesday, May 30, 2023 – effective immediately

End:      Unknown

Building(s) or Area(s) Affected:  Onyx Bridge Cold Room 485

Scope:  An emergency shutdown of the air conditioning for cold room 485 has taken place due to the system freezing up.  The air will be off for at least a day.  An update will be sent when the system has been restored.

Services Impacted:  The air conditioning will be offline in the cold room.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Onyx Bridge cold room 485

4/11/23 Clinical Services Chilled Water Shutdown

Begin:  Tuesday, April 11, 2023, at 7:00 am

End:      Tuesday, April 11, 2023, at 3:00 pm

Building(s) or Area(s) Affected:  Clinical Services

Scope:  Due to an incorrectly located temperature sensor during the chilled water meter work, building air conditioning will be shutdown to install the sensor in the correct location.

Services Impacted:  There should be minimal impact to building users due to cooler Spring weather.

Work Performed By:  CPFM Utilities & Energy

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Clinical Services

4/03/23 Huestis Basement Steam and Condensate Shutdown

Begin:  Monday, April 3, 2023, at 7:00 am

End:      Monday, April 3, 2023, at 3:30 pm

Building(s) or Area(s) Affected:  Huestis Hall

Scope:  As part of the Huestis Renovation project, the steam and condensate to the Zebrafish Facility in the basement of Huestis Hall will be offline. This will also require the shutdown of equipment LEF 1&2, AHU 1&2, Willamette Hall supply and exhaust fan to quarantine. Dish and rack washing will be affected and scheduled off during this period.

Services Impacted:  This will affect the heating systems, exhaust, HVAC air supply, and steam condensate.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

3/20/23 – 3/22/23 Clinical Services Building Chilled Water Shutdown

Begin:  Monday, March 20, 2023, at 7:30 am

End:      Wednesday, March 22, 2023, at 3:00 pm

Building(s) or Area(s) Affected:  Clinical Services Building

Scope:  Due to the installation of a new chilled water meter, building air conditioning will be shutdown.

Services Impacted:

  • There will be some noise and slight odor from pipe work in basement mechanical room 050.
  • According to the current weather forecast, this work should have little to no impact on building users.

Work Performed By:  S2 Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

2/15/23 – Unknown – Lillis HVAC AHU-1 Emergency Shutdown

Begin:  Wednesday, February 15, 2023 – effective immediately

End:      Unknown

Building(s) or Area(s) Affected:  Lillis

Rooms:

  • Suite 140- 140, 140A, 140B, 140C 140D, 140E, 140F
  • Suite 145- 145, 145A, 145B
  • Suite 155- 155, 155A, 155B
  • Room 169
  • Suite 240- 240, 240A, 240D, 240E
  • Suite 250- 250, 250A, 250B, 250C, 250D, 250e
  • Rooms 219, 263, 269

Scope:  The AHU-1 has been shut down to make emergency repairs.  Parts have been ordered and an update will be sent when the system has been restored.

Services Impacted:  The heat will be offline in the rooms listed above.

Work Performed By:  CPFM Facilities Crew

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

2/06/23 – 2/08/23 Lawrence Hall Chilled Water Shutdown

Begin:  Monday, February 6, 2023, at 7:00 am

End:      Wednesday, February 8, 2023, at 3:00 pm

Building(s) or Area(s) Affected:  Lawrence Hall East

Scope:  Due to the installation of a chilled water meter, the chilled water used for air conditioning will be shut down.

Services Impacted:   Because of winter weather, this outage will have little to no impact on building users.

Work Performed By:  S2 Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

10/13/22 Zebrafish International Resource Center Electrical Outage

Begin:  Thursday, October 13th, 2022, at 7:00 am

End:      Thursday, October 13th, 2022, at 7:30 am

Building(s) or Area(s) Impacted:  Zebrafish International Resource Center

Scope:  Building power will be offline for 30 minutes to install an electric meter .

Services Impacted:  This will impact electrical power, exhaust, and the HVAC air supply.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  Fortis Construction

ContactColin Brennan, CPFM Owner’s Representative, 541-346-8242 or 541-654-2972

10/04/22 Huestis Basement Zebrafish Facility AHU and Exhaust Fan Shutdown

Begin:  Tuesday, October 4th, 2022 at 4:00 am

End:      Tuesday, October 4th, 2022 at 7:00 am

Building and Area:  Huestis Basement Zebrafish Facility

Scope: AHU 1 and 2 and Exhaust Fans 1 and 2 serving the Huestis basement Zebrafish Facility will be shutdown to accommodate a temporary duct reroute.

Services Impacted:  This will affect the exhaust, fume hoods, and HVAC air supply in the Zebrafish Facility.

Special Instructions:  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Work Performed By:  JH Kelly and EC

Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

 

9/28/22 Ford Alumni Center Emergency AHU 1, AHU 2, and AHU 3 Shutdown

Begin:  Wednesday, September 28th, 2022 effective immediately

End:      Wednesday, September 28th, 2022 at 5:00 pm

Building and Area:  Ford Alumni Center

Scope: The disconnect for AHU-1, AHU 2, and AHU 3 needs to be replaced.

Services Impacted:  This shutdown will affect air supply and exhaust in Ford Alumni Center

Work Performed By:  Matt Paeschke, CPFM

Contact: Work Control Center, Campus Planning and Facilities Management, 346-2319

To view current construction and impacts. visit UO Map.

9/14/22 Lokey Labs Electrical Shutdown

Begin:  Wednesday, September 14th, 2022 at 6:00 am

End:      Wednesday, September 14th, 2022 at 7:00 am

Building and Area:  Lokey Labs

Scope: As part of the Huestis Renovation Project, there will be a brief shutdown of electrical panel 2N2 and 2N2A

Services Impacted:  This electrical outage will affect the chilled water, compressed air, power, exhaust, fume hoods, and HVAC air supply.

Special Instructions:  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

Additional Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  Lease Crutcher Lewis and EC

Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

9/13/22 Willamette Hall and Huestis Steam/Condensate plus Supply/Exhaust Air Shutdown

Begin:  Tuesday, September 13th, 2022 at 7:30 am

End:      Tuesday, September 13th, 2022 at 11:30 am

Building(s) or Area(s) Affected:  Willamette Mechanical Room 50 and Huestis Basement

Scope:  As part of the Huestis Renovation project, steam and condensate plus supply and exhaust air will be shut down.

Services Impacted:  The following equipment will be affected and unavailable during this time: Willamette Hall AHU-2, Huestis Hall AHU-1&2, HX-1 and steam sterilizers.

Work Performed By:  Lease Crutcher Lewis and JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

9/06/22 – 9/08/22 McKenzie Hall Rooms 125, 129, and 229 HVAC Shutdown

Begin:  Tuesday, September 6th, 2022 at 7:00 am

End:      Thursday, September 8th, 2022 at 5:00 pm

Building(s) or Area(s) Affected:  McKenzie Hall

Scope:  Heating water and chilled piping to MZ-2 will be cut and rerouted to provide pathway for new ductwork routing as part of the ductwork repair project.

Services Impacted:  The air handling unit will continue to operate to provide ventilation but will not have heating or cooling in classrooms 125, 129, and 229.  This will not affect the rest of the building.

Work Performed By:  Harvey and Price

ContactKevin Waldrop, CPFM Facilities Engineer, 541-346-2315

To view current construction and impacts. visit UO Map.