9/06/22 – 9/08/22 McKenzie Hall Rooms 125, 129, and 229 HVAC Shutdown

Begin:  Tuesday, September 6th, 2022 at 7:00 am

End:      Thursday, September 8th, 2022 at 5:00 pm

Building(s) or Area(s) Affected:  McKenzie Hall

Scope:  Heating water and chilled piping to MZ-2 will be cut and rerouted to provide pathway for new ductwork routing as part of the ductwork repair project.

Services Impacted:  The air handling unit will continue to operate to provide ventilation but will not have heating or cooling in classrooms 125, 129, and 229.  This will not affect the rest of the building.

Work Performed By:  Harvey and Price

ContactKevin Waldrop, CPFM Facilities Engineer, 541-346-2315

To view current construction and impacts. visit UO Map.

 

9/01/22 – 9/08/22 510 Oak HVAC Work Advisory

Begin:  Thursday, September 1st, 2022

End:      Thursday, September 8th, 2022

Building(s) or Area(s) Affected:  510 Oak

Scope:  Technicians will be servicing the AC units in this building.

Services Impacted:

  • Systems will be up and running, except for short, individual shut downs (usually under 20 min a room/system.)  Not all rooms may be impacted.
  • Technicians will be in and out of office, storage and common spaces intermittently throughout the week.

Work Performed By:  CPFM Facilities Mechanical Crew

ContactPiper Fahrney, CPFM FS Mechanical Shop, 541-346-2319

To view current construction and impacts, visit UO Map.

8/19/22 – 8/24/22 Baker Downtown Center HVAC Shutdown

Begin:  Friday, August 19th, 2022

End:      Wednesday, August 24th, 2022

Building(s) or Area(s) Affected:  Baker Downtown Center

Scope:  Due to unforeseen conditions the HVAC unit is not working. Hopefully repairs will be complete tomorrow, but the building wide cooling may be down until Wednesday.

Services Impacted:  Building wide cooling will be offline until repairs can be made.

Work Performed By: FM Sheetmetal

Contact: Bruce Budzik, CPFM Small Projects & Cap Imp Manager, 541-346-8834

8/19/22 – Unknown Computing Center Cooling Shutdown

Begin:  Today, August 19th, 2022 at 9:00 am

End:      Unknown, possibly Monday, August 22nd, 2022

Building(s) or Area(s) Affected:  Computing Center

Scope:  A water intrusion was found on the 2nd floor and Air Handling Unit 5 was determined to be the source. AHU-5 has been shut down to stop the water intrusion and will be off until repairs can be made. This will impact the cooling in the building.

Services Impacted:  Users may notice a difference in building cooling throughout the day.

Work Performed By: CPFM FS Mechanical and Plumbing Shops

ContactKyle Harshbarger, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

6/17/22 Huestis Hall HVAC Shutdown

Begin:  Friday, June 17th, 2022 at 11:00 am

End:      Friday, June 17th, 2022 at 1:00 pm

Building(s) or Area(s) Affected:  Huestis Hall

Scope:  As part of the Huestis Renovation Project and isolating the active basement space from levels 1-3, supply fan 1A (SF-1A) will be shutdown tomorrow.

Services Impacted:  This affects heating and cooling air supply to Suite 34.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

6/16/22 Huestis Hall Basement HVAC Shutdown

Begin:  Thursday, June 16th, 2022 at 11:00 am

End:      Thursday, June 16th, 2022 at 2:00 pm

Building(s) or Area(s) Affected:  Huestis basement rooms 17, 20, 20B, 21, 21A, and 31

Scope:  As part of the Huestis Renovation Project, supply fan 2-B will be shutoff for 3 hours.

Services Impacted:  This work will affect heating and cooling air supply to the Huestis basement rooms.

Work Performed By:  Mortenson Construction

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

5/11/22 – 5/13/22 Klamath Hall Air Handler Units Shutdown

UPDATE:
90% of the coil repairs have been completed and all air handlers have been turned on.  One air handler will be shut down for a short, unknown period of time on Friday May 13th to complete the repairs.
Thank you for your continued patience.

 

Begin:  May 11th, 2022 at 8:00 am

End:      May 11th, 2022 at 12:00 pm  Friday, May 13th, 2022

Building(s) or Area(s) Involved:  Klamath Hall

Scope:  Klamath Hall air handler units will be shut down to repair continuously failing chilled water coils.

Services Impacted:  Building-wide cooling

Work Performed By:  S2 Industrial

ContactKyle Harshbarger, CPFM Mechanical and Plumbing Shop Manager, 541-346-2055

8/09/22 Baker Downtown Center Chilled Water Shutdown Notice

Begin:  Tuesday, August 9th, 2022 at 7:00 am

End:      Tuesday, August 9th, 2022 at 4:00 pm

Building(s) or Area(s) Affected:  Baker Downtown Center, Rooms 100 – 140

Scope:  The chilled water system that serves the air handling units for the south side of the building will be shut down

Services Impacted:   The affected areas will not have air conditioning during this time

Work Performed By:  FM Sheet Metal

Contact: Kyle Harshbarger, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

Willamette Hall Air Handler 3 Emergency Shutdown 4/18/22 – 5/20/22

UPDATE 5/20/22:
The repair is complete and the air handler is operational.

 

UPDATE 5/6/22:
Replacement parts have been ordered to repair the air handler fan. Due to supply chain delays the parts are not expected to arrive until May 26th. With the fan being shutdown conditioned air is not being circulated to parts of the building. Occupants will continue to experience cooler than normal building temperatures.

 

UPDATE 4/21/22:
Air Handler 3 is expected to be shut down until May 6th. The reason for the extended shut down is new bearings are being ordered and parts are being fabricated to repair a severely damaged fan shaft.

 

Begin:  Effective Immediately – Monday, April 18th, 2022

End:  Unknown –  Friday, May 6th, 2022 May 31st, 2022  Friday, May 20th, 2022

Building(s) or Area(s) Impacted:  Willamette Hall West Wing

Scope:  Air Handler 3 has been shutdown for an emergency repair.

Services Impacted:  This will affect the HVAC system on the 2nd, 3rd, and 4th floors of the west wing.

Work Performed By:  CPFM Facilities Crews

Contact:   Kyle Harshbarger, CPFM Mechanical and Plumbing Shop Manager, 541-346-2055

Knight Law Center Emergency HVAC Chilled Water System Shutdown 3/31/22

UPDATE:
The leak was repaired and the chilled water has been restored.

 

Begin:  Thursday, March 31st, 2022 at 7:00 am

End:      Thursday, March 31st, 2022 at approximately 4:00 pm

Building(s) or Area(s) Impacted:  Knight Law Center

Scope:  There will be an emergency shut down of the HVAC chilled water system tomorrow.  This is required to repair a leak within the building.

Services Impacted:  No impact is expected because the outside temperatures are mild.

Work Performed By:  CPFM Facilities Crews

ContactKyle Harshbarger, CPFM Mechanical and Plumbing Shop Manager, 541-346-2055

Streisinger, LISB, Lokey Labs (CAMCOR) Emergency Air Handler Shutdown 3/15/22

Begin:  Tuesday, March 15th, 2022 at 7:00 am

End:      Tuesday, March 15th, 2022 at 3:30 pm

Building(s) or Area(s) Impacted:  Streisinger, Lewis Integrative Science Building, Lokey Labs (CAMCOR)

Scope:  There will be a rolling shutdown of the HVAC system in Streisinger in order to perform an emergency air filter change.  Because this is a rolling shutdown, we do not know exactly when each area will be impacted.

Services Impacted:  This will also affect the heating and A/C in Streisinger, LISB and CAMCOR, including the animal labs.

Work Performed By:  UO CPFM Facilities Services

ContactJim Cody, CPFM Associate Dir. of Facilities Services, 541-346-2302

Unthank Hall Electrical Shutdown 3/23

Begin:  March 23rd, 2022 at 8:00 AM

End:      March 23rd, 2022 at 2:00 PM

Building(s) or Area(s) Impacted:  Unthank Hall

Scope:  We will have an electrical shutdown at Unthank Hall. The building will be on standby power during the shutdown. Stand-By will power walk-in coolers, walk-in freezers, walk-in beverage coolers, ADA doors, MDF/IDF rooms, FSD’s, fire alarm system, elevator system, and all lighting that is on egress. This shutdown is to test the ATS and install a metering cabinet in the main switchgear.

Services Impacted: All electricity will be down except walk-in coolers, walk-in freezers, walk-in beverage coolers, ADA doors, MDF/IDF rooms, FSD’s, fire alarm system, elevator system, and all lighting that is on egress.

Special Instructions: Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By: Oregon Electric Group

Contact: George Bleekman, CPFM Owner’s Representative, 541-346-2625

Campus AHU Preventative Maintenance Schedule for February 2022

Begin:  February 1st, 2022

End:     February 28th, 2022

Building(s) or Area(s) Impacted:

  • 1900 Millrace
  • Student Rec Center
  • Cascade Hall
  • Cascade Annex West
  • Cascade Annex East
  • McMorran
  • Esslinger
  • Straub

Scope:  Preventative Maintenance work will be performed, over the course of February, for the buildings listed above.

Services Impacted:  No services are expected to be impacted.

Work Performed By:  CPFM Preventative Maintenance Crew or Contractor

ContactJim Cody, CPFM Associate Dir. of Facilities Services, 541-346-2302

Lawrence Hall Air Handler Emergency Shutdown 1/21/22 – 1/24/22

UPDATE:
The air handler has been repaired and is back online.

 

Begin:  Friday, January 21, 2022 – effective immediately

End:      Unknown (TBD on Monday) January 24, 2022

Building(s) or Area(s) Impacted:  Lawrence Hall – 1st through 4th floors of the north half of the building

Scope:  The SF-1 air handler will be offline due to an emergency shutdown of the system.

Services Impacted:  Heating and the HVAC Air Supply will be inoperable on the 1st through 4th floors of the north half of the building.

Work Performed By:  CPFM BAS Technicians

ContactStacy Breaux, CPFM FS Building Automation Systems Field Supervisor, 541-521-5376

Lokey Labs HVAC Shutdown 9/08/21

Begin:  Wednesday, September 8th, 2021 at 7:00 am

End:      Wednesday, September 8th, 2021 at 6:00 pm

Building(s) or Area(s) Impacted:  Lokey Labs

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.  Apologies for the short notice.

Services Impacted:  This will impact the main building air and should not affect mini-splits and local temperature control units.

Note:  Fume hood sashes will need to be closed and containers within the fume hoods sealed prior to the shutdown.

Work Performed By:  ERS, Inc.

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

Columbia Hall HVAC Shutdown 8/20/21

Begin: August 20th, 2021 at 7:00 am

End: August 20th, 2021 at 6:00 pm

Building(s) or Area(s) Impacted: Columbia Hall

Scope: Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.

Services Impacted: HVAC units will be offline for the entire building.

Work Performed By: ERS, Inc.

Contact: Adam Jones, SRS Buildings Sciences Manager, 541-346-8397

Deschutes Hall HVAC Shutdown 8/20/21

Begin: August 20th, 2021 at 7:00 am

End: August 20th, 2021 at 6:00 pm

Building(s) or Area(s) Impacted: Deschutes Hall

Scope: Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.

Services Impacted: HVAC units will be offline for the entire building.

Work Performed By: ERS, Inc.

Contact: Adam Jones, SRS Buildings Sciences Manager, 541-346-8397

Volcanology HVAC Shutdown 8/19/21

Previous notice sent – actually 8/19

 

Begin:  August 19th, 2021 at 7:00 am

End:     August 19th, 2021 at 6:00 pm

Building(s) or Area(s) Impacted:  Volcanology

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.

Services Impacted:  HVAC units will be offline for the entire building.

Work Performed By:  ERS, Inc.

Contact:  Adam Jones, SRS Buildings Sciences Manager, 541-346-8397

Klamath Hall AHU Maintenance Shutdown 8/9/21 – 8/20/21

UPDATE 8/16/21: The CPFM FS Mechanical Crew will be doing work that requires Fume Hoods to be shut down on Thursday 8/19/21 from 8 AM until 12 PM for filter maintenance.

Special Instructions: Fume hood sashes should be closed and containers within the fume hoods sealed prior to this date.

 

Begin: Monday, August 9th, 2021

End: Friday, August 20th, 2021

Building(s) or Area(s) Impacted: Klamath Hall

Scope: The AHU will be shut down for annual repairs and maintenance.

Services Impacted: The building’s heating, cooling, exhaust, fume hoods, and HVAC air supply will be off-line.

Special Instructions: Technicians will reach out to the different departments for fume hood shutdown times.

Work Performed By: CPFM FS Mechanical Crew

Contact: Ken Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

Lokey Education, HEDCO, Music, Berwick, and Clinical Services Building HVAC Shutdown 7/12/21 – 7/23/21

Begin:  Monday, July 12th, 2021 at 7:00 am

End:     Friday, July 23rd, 2021 at 6:00 pm

Building(s) or Area(s) Impacted:  Lokey Education (University High, Education East, and Education Addition), HEDCO Education, Frohnmayer Music Building, Berwick Hall, Clinical Services Building

Scope:  Each HVAC unit will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.

Services Impacted:  HVAC units will be offline.

Work Performed By:  ERS

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

Willamette Hall Annual AHU Maintenance Shutdown 6/16/21

Begin:  Wednesday, June 16th, 2021 at 8:00 am

End:      Wednesday, June 16th, 2021 at 3:30 pm

Building(s) or Area(s) Impacted:  Willamette Hall

Scope:  The AHU will be shut down for annual repairs and maintenance.

Services Impacted:  The building’s heating, cooling, exhaust, fume hoods, and HVAC air supply will be off-line.

Special Instructions:  Fume hood sashes will need to be closed and containers within the fume hoods sealed prior to the shutdown.

Work Performed By:  CPFM FS Mechanical Crew

ContactKen Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

Price Science Commons and Gerlinger Hall HVAC Shutdown 6/7/21 – 6/10/21

Begin:  Monday, June 7th, 2021 at 7:00 am

End:     Thursday, June 10th, 2021 at 6:00 pm

Building(s) or Area(s) Impacted:  Price Science Commons and Gerlinger Hall

Scope:  The HVAC units will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.

Services Impacted:  HVAC units will be offline.

Work Performed By:  Servpro

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

Ford Alumni Center, Bean Hall, Jaqua Academic Center, and University Health Center HVAC Shutdown 6/7/21 – 6/11/21

Begin:  Monday, June 7th, 2021 at 8:00 am

End:     Friday, June 11th, 2021 at 5:00 pm

Building(s) or Area(s) Impacted:  Ford Alumni Center, Bean Hall, Jaqua Academic Center, University Health Center

Scope:  The HVAC units will be shut down for approximately ½ – 1 day during the timeframe indicated to perform cleaning. This is part of the wildfire insurance response project.

Services Impacted:  HVAC units will be offline.

Work Performed By:  ERS

ContactAdam Jones, SRS Buildings Sciences Manager, 541-346-8397

Campus HVAC Preventative Maintenance Schedule for June 2021

Begin:  June 1st, 2021

End:     June 30th, 2021

Building(s) or Area(s) Impacted:

  • Streisinger
  • Willamette
  • Columbia
  • McArthur Court
  • 1600 Millrace
  • Oregon State Museum of Anthropology (Bldg. #547)

Scope:  Preventative Maintenance work will be performed, over the course of June, for the buildings listed above.

Services Impacted:  No services are expected to be impacted, however, it may potentially affect air dryers, air compressors, exhaust fans, fan coils, furnaces, pumps, unit heaters, and/or air handling units.

Work Performed By:  CPFM Preventative Maintenance Crew

ContactKen Straw, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

 

HVAC System Cleaning at Lillis, Anstett, Peterson, Chiles, Computing Center, McKenzie, Miller Theatre, Villard, and Fenton Halls 1/4-1/8

Begin:  January 4, 2021

End:      January 8, 2021

Building(s) or Area(s) Impacted:  Lillis, Anstett, Peterson, Chiles, Computing Center, McKenzie, Miller Theatre, Villard, and Fenton Halls

Scope: During the month of January, 2021, the U of O will have an outside contractor cleaning HVAC systems in your buildings. This work is being done as a result of the wildfire smoke in September of 2020, with the intent of removing combustion by-products collected on HVAC internal surfaces. This will help remove any residual odors and other impacts to our HVAC systems. For the Week of January 4, 2021, HVAC units will be shut down periodically in Anstett Hall (1/4/2021), Peterson Hall (1/5/2021), Fenton Hall (1/6/2021)  and Chiles Hall (1/7/2021 & 1/8/2021).  Facilities plans to meet with the contractor early next week and work out a more specific schedule.  We will send out weekly notifications that will outline buildings that will be impacted during the week of January 11, 2021 on Thursday the prior week.

Extra Notes: The work will be conducted using strict containment and air controls and should not impact end-users in any way; however, users should be advised that their HVAC systems may be shut down for periods during the month of January.

Work Performed By: This work will be managed with Safety & Risk Services and supported by CPFM.

Contact: Adam Jones, SRS Buildings Sciences Manager, 541-346-8397