12/30/24 Unthank Hall and Knight Law Center Steam Shutdown

Begin:  Monday, December 30, 2024, at 7:00 am

End:      Monday, December 30, 2024, at 5:00 pm

Building(s) or Area(s) Affected:  Unthank Hall and Knight Law Center

Scope:  Due to a steam pipe leak in the utility tunnel, steam will be shut down to replace a section of piping.

Services Impacted:  This will affect the building heat and the domestic hot water.

Special Instructions:  Please dress accordingly for the cooler temperatures.

Work Performed By:  CPFM Utilities & Energy and S2 Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Unthank Hall and Knight Law Center

12/18/24 Klamath Hall B029 Grease Trap Cleaning and Price Science Commons Upper Floor Drains Offline Advisory

Begin:  Wednesday, December 18, 2024, at 9:00 am

End:      Wednesday, December 18, 2024, at 4:00 pm

Building(s) or Area(s) Affected:  Klamath Hall B029 and Price Science Commons Café and upper restroom

Scope:  Roto Rooter will change out of the grease trap in the Klamath Hall basement in Mechanical room # B029 that is connected to Price Science Cafe and upper restroom floor drains.

Services Impacted

  • The Price Science Commons upper restroom and café will be shut down during this time.
  • Odor can be expected from this activity.

Special Instructions:  Please use the restrooms downstairs.

Work Performed By:  Roto Rooter

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

11/20/24 Hendricks Hall Routine Drinking Water Monitoring

UPDATE 12/09/24:

Hi All,

The results were received from the drinking water samples collected from Hendricks Hall. All were well below the EPA limits for lead. Specific results can be seen at THIS LINK under FY2025 Data.

Please contact EHS if you have any questions.

Thanks,
Adam

 

 

Hi All,

As a part of the University’s ongoing drinking water management program, Environmental Health and Safety is conducting routine drinking water monitoring in Hendricks Hall on Wednesday, November 20, 2024. EHS will tag the drinking fountains and the faucet in the basement kitchenette by 8:00 am and will collect samples around 2:00 pm. Please do not use any tagged fixtures. All other fixtures within the building may be used as normal. EHS will remove the tags as samples are collected, after which the fixtures may return to normal use.

EHS expects to receive results in early to mid-December. Results will be added to our online results at THIS LINK. Results exceeding EPA limits will be communicated to building occupants via CPFM Work Control.

Thank you,

Adam S. Jones, CIEC | Environmental Services Manager
Safety and Risk Services
Environmental Health & Safety
1260 University of Oregon | Eugene, OR 97403-1260
(541) 346-8397 | asjones@uoregon.edu
(541) 852-5685

Aerial view of Hendricks Hall

11/12/24 Baker Downtown Center Boiler Emergency Shutdown

UPDATE:
Repairs have been made and service has been restored.

 

Begin:  Tuesday, November 12, 2024 – effective immediately

End:      Unknown      Tuesday, November 12, 2024

Building(s) or Area(s) Affected:  Baker Downtown Center

Scope:  The boiler has been shut down for emergency repairs.  It is unknown how long it will take to bring it back online.  An update will be sent when it has been restored to service.

Services Impacted:  This will affect heating in the building.  It is possible it may affect the domestic hot water temperature, too.

Work Performed By:  CPFM Crew

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Baker Downtown Center

8/28/24 Cascade Hall 3rd Floor Domestic and Industrial Water Shutdown

Begin:  Wednesday, August 28, 2024, at 7:00 am

End:      Wednesday, August 28, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Cascade Hall 3rd Floor

Scope:  Remove and cap Fotopanel water lines.

Services Impacted:  Domestic hot and cold water plus the industrial hot and cold water will be shut down on the 3rd floor, affecting restrooms, sinks, and drinking fountains.

Work Performed By:  CPFM Plumbing Shop

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map Image of Cascade Hall

8/15/24 Lillis Hall West Side Domestic Hot and Cold Water Emergency Shutdown

UPDATE:
The repair is complete, and water has been restored to service.

 

Begin:  Thursday, August 15, 2024 – effective immediately

End:      Thursday, August 15, 2024 – approximately 11:00 am

Building(s) or Area(s) Affected:  Lills Hall West Side

Scope:  Due to an emergency angle stop replacement, the domestic hot and cold water will be shut down for approximately 30 minutes.

Services Impacted:  The domestic hot and cold water will be offline in the restrooms, sinks, and drinking fountains.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map Image of Lillis Hall

8/20/24 – 8/21/24 Pacific Hall and Columbia Hall Steam Shutdown

UPDATE:
The steam has been returned to service.

 

UPDATE:
The steam shutdown has been rescheduled for next Tuesday, August 20th, at 3:00 pm and will end on Wednesday, August 21st, by 5:00 pm.    This will also affect the building heat in Columbia Hall.

 

UPDATE:
The steam shut down has been postponed.  A notice will be sent when it has been rescheduled.

 

BeginAugust 13, 2024, at 3:00 pm   Postponed   Tuesday, August 20, 2024, at 3:00 pm

End:      August 14, 2024, at 12:00 noon    Postponed   Wednesday, August 21, 2024, at 5:00 pm

Building(s) or Area(s) Affected:  Pacific Hall and Columbia Hall

Scope:  The steam will be shut down for repairs.

Services Impacted:

  • This will affect the industrial hot water and the domestic hot water in Pacific Hall.
  • The building will be a bit cooler on Wednesday morning in Pacific Hall and Columbia Hall, but adjustments will be made overnight as needed.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Pacific Hall and Columbia Hall

8/05/24 HEDCO Education Emergency Hot Water Shutdown

UPDATE:
The hot water has been restored to service.

 

Begin:  Monday, August 5, 2024 – effective immediately

End:      Monday, August 5, 2024 – approximately 12:00 noon

Building(s) or Area(s) Affected:  HEDCO

Scope:  Due to a leak, the hot water has been shut down to make repairs.  An update will be sent when the hot water has been returned to service.

Services Impacted:  Only the hot water is offline.  The cold water is not affected.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead aerial view of HEDCO Education

8/09/24 Huestis Hall Steam System Shutdown

Begin:  Friday, August 9, 2024, at 7:00 am

End:      Friday, August 9, 2024, at 9:00 am

Building(s) or Area(s) Affected:  Huestis Hall

Scope:  The steam system will be temporarily shut down to install a condensate blowdown valve for maintenance purposes.

Services Impacted:

  • Huestis Basement: Depending on the outside air temperature, the AHUs and LEFs that serve the basement may need to be shut down to avoid unheated air blowing into occupied spaces.
  • Huestis all floors: Domestic hot water will be offline during this outage.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Huestis Hall

8/05/24 – 8/07/24 Knight Law Center Building Steam Heat and Domestic Hot Water Shutdown

Begin:  Monday, August 5, 2024, at 7:00 am

End:      Wednesday, August 7, 2024, at 3:00 pm

Building(s) or Area(s) Affected:  Knight Law Center

Scope:  Due to the replacement of a utility steam flow meter, building steam heating and domestic hot water will be shut down.

Services Impacted:

  • This shutdown will have minimal impact to building heating.
  • The cold-water supply will not be affected.
  • Work will take place in the utility tunnel and basement mechanical space.

Work Performed By:  CPFM Utilities & Energy and S2 Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Knight Law Center

7/23/24 Streisinger Hall Domestic and Industrial Water Shutdown

UPDATE:
Domestic and industrial water have been restored to the building.

 

Begin:  Tuesday, July 23, 2024, at 7:00 am

End:      Tuesday, July 23, 2024, at 3:00 pm

Building(s) or Area(s) Affected:  Streisinger Hall

Scope:  Due to a leak on the 1st floor 3″ domestic water line, the entire building will need to be shut down to fix this leak.

Services Impacted:  All water in the building will be offline:  domestic hot and cold water, industrial hot and cold water, auto claves, cage washers, restrooms, drinking fountains, and anything else that is connected to the domestic cold and hot water lines.

Special Instructions:  Please use the facilities in nearby buildings.

Work Performed By:  CPFM Facilities Plumbing Shop, BAS Shop, and Mechanical Shop

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Streisinger Hall

7/20/24 Lawrence Hall, Allen Hall, and Miller Theatre Domestic Hot and Cold Water Shutdown

Begin:  Saturday, July 20, 2024, at 6:00 am

End:      Saturday, July 20, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Lawrence Hall, Allen Hall, Miller Theatre Complex

Scope:  For the Heritage Project, a domestic water line in University Hall needs to be cut to add a new valve.

Services Impacted:  Domestic hot and cold water will be shut down to Lawrence Hall, Allen Hall, and Miller Theatre Complex for approximately 6 hours.

Work Performed By:  Alliant

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

Current construction and impacts information can be found on the UO Maps site.

Overhead map image of Miller Theatre Complex, Allen Hall, and Lawrence Hall

6/25/24 Clinical Services Building Domestic Hot and Cold Water Shutdown

Begin:  Tuesday, June 25, 2024, at 8:00 am

End:      Tuesday, June 25, 2024, at 3:00 pm

Building(s) or Area(s) Affected:  Clinical Services Building – 1st floor restrooms on east side

Scope:  The domestic hot and cold water will be shut down while repairs are being made to a hose bib.

Services Impacted:  This will only affect the 1st floor restrooms on the east side of the building.

Special Instructions:  Please access the other restrooms located within the building.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

clinical services building interior map

3/25/24 – 3/28/24 Fine Arts A, B, C, Woodshop, and Urban Farm Domestic and Irrigation Water Shutdown

UPDATE 3/28/24:
This work is complete, and the water is back online to all buildings.

 

UPDATE:

  • The building water shutdown will extend to end of day tomorrow, March 28th.   CPFM has additional work to perform tomorrow to repair a leaking water line.
  • Irrigation water will be back on end of day today as planned.

 

 

 

Begin: Monday, March 25, 2024, at 7:00 am

End: Wednesday, March 27  Thursday, March 28, 2024, at 6:00 pm

Building(s) or Area(s) Affected: Fine Arts A, Fine Arts B, Fine Arts C, Woodshop, and Urban Farm

Scope: In order to reconfigure underground water piping, building water and irrigation water will be shutdown. Work will include the use of vacuum excavation equipment.

Services Impacted:

  • Work to be performed during Spring Break in order not to impact classes.
  • Domestic water and irrigation water will be offline during this time.
  • Systems will come back online as soon as possible.

Work Performed By: Hoffman Construction

Contact: Denise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Image of Fine Arts Studios, Woodshop, and Urban Farm

3/15/24 Friendly Hall Emergency Restroom and Drain Shutdown

UPDATE: 
The system has been restored to service.

 

Begin:  Friday, March 15, 2024 – effective immediately

End:      Friday, March 15, 2024 – unknown 4:00 pm

Building(s) or Area(s) Affected:  Friendly Hall

Scope:  The drains are offline and Roto Rooter is headed over to unclog the system.  An update will be sent when service has been restored.

Services Impacted:  Restrooms, sinks, and drinking fountains are offline at this time.

Special Instructions:  Please use the facilities in adjacent buildings.

Work Performed By:  Roto Rooter

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Friendly Hall

3/26/24 – 3/27/24 Buildings B and C (Walton replacements) Steam Shutdown

Begin:  Tuesday, March 26, 2024, at 2:00 pm

End:      Wednesday, March 27, 2024, at 3:00 pm

Building(s) or Area(s) Affected:  Building B and C  (Walton replacements)

Scope:  Steam serving buildings B and C will be shut down to replace the 2/3 steam valve.

Services Impacted:  There will be no hot water in either building, but the building heat will not be affected.

Work Performed By:  Alliant Mechanical, CPFM CPS Utilities & Energy

ContactGeorge Bleekman, CPFM Owner’s Representative, 541-346-2625

Current construction and impacts information can be found on the UO Maps site.

Image of Walton Buildings B & C

3/05/24 Romania Warehouse Domestic Water Shutdown

Begin:  Tuesday, March 5, 2024, at 11:00 am

End:      Tuesday, March 5, 2024, at 1:00 pm

Building(s) or Area(s) Affected:  Romania Warehouse

Scope:  The domestic water will be shut down while a new water meter is installed.

Services Impacted:  Restrooms, sinks, and drinking fountains will be offline during this time.

Work Performed By:  EWEB

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Romania Warehouse

3/27/24 Hamilton Hall Steam Heat Shutdown

Begin:  Wednesday, March 27, 2024, at 10:00 am

End:      Wednesday, March 27, 2024, at 2:00 pm

Building(s) or Area(s) Affected:  Hamilton Hall

Scope:  Due to a leaking steam valve in the utility tunnel, building heat and hot water will be shut down to replace the valve.

Services Impacted:

  • Building heat and hot water will be offline during this time.
  • This work is scheduled during spring break to limit impact to building users.
  • Work will take place in the utility tunnel.

Work Performed By:  CPFM Utilities & Energy

ContactContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Hamilton Hall Complex

2/22/24 – 2/23/24 Huestis Hall Basement Sanitary Discharge Shutdown

Begin:  Thursday, February 22, 2024, at 6:00 pm

End:      Friday, February 23, 2024, at 3:00 pm

Building(s) or Area(s) Affected:  Huestis Hall basement

Scope:  Sanitary discharge in the Huestis Hall basement will be limited to allow work to be completed in the sanitary pit.

Services Impacted:

  • Restrooms and handwashing sinks in labs and the break room will not be available during this shutdown.
  • Contractor will provide overflow waste bins for lab water discharge at floor sinks and floor drains.

Special Instructions:  Please use restrooms in adjacent buildings.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

map of Huestis Hall

2/10/24 Lawrence Hall, Allen Hall, Villard Hall, and Miller Theatre Domestic Water Shutdown

Begin:  Saturday, February 10, 2024, at 6:00 am

End:      Saturday, February 10, 2024, at 5:00 pm

Building(s) or Area(s) Affected:  Lawrence Hall, Allen Hall, Villard Hall, and Miller Theatre

Scope:   Domestic water will be shut down to relocate the building’s water and fire service shutoff valves into the tunnel.  This is needed to avoid conflict with the current Heritage Project’s demo and build back activities.

Services Impacted:  This will affect domestic hot and cold water service for the listed buildings in all sinks, restrooms, and drinking fountains.

Special Instructions:  Fire sprinkler systems will be shut down in University Hall, Villard Hall, and Miller Theatre.  These will be monitored by Fortis Construction.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  Fortis Construction / Alliant systems

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214 or 541-510-2772

Current construction and impacts information can be found on the UO Maps site.

Image of University Hall, Villard Hall, Miller Theatre, Allen Hall, and Lawrence Hall

2/02/24 University Hall, Villard Hall, Miller Theatre Complex, Allen Hall, and Lawrence Hall Water Pressure Advisory

Begin:  Friday, February 2, 2024, at 6:00 am

End:      Friday, February 2, 2024, at 8:00 am

Building(s) or Area(s) Affected:  University Hall, Villard Hall, Miller Theatre Complex, Allen Hall, Lawrence Hall

Scope:  Fire flow testing will take place at University Hall. This will be a short duration shutdown (under 1 hour) and won’t need the water valve shut off,  but it will steal all of the water pressure supply of the other buildings mentioned, when they are performing the flow test.

Services Impacted:  Water to entire buildings (listed above) will have reduced flow for a short period of time.

Work Performed By:  Fortis Construction/Alliant Systems

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

Current construction and impacts information can be found on the UO Maps site.

Image of University Hall, Villard Hall, Miller Theatre, Allen Hall, and Lawrence Hall

1/25/24 Esslinger Hall Emergency Steam Heat Shutdown

UPDATE:
This work is actually scheduled for tomorrow.
Sorry for any inconvenience this may have caused.

 

BeginWednesday, January 24, Thursday, January 25, 2024, at 8:00 am

End:      Wednesday, January 24, Thursday, January 25, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Esslinger Hall

Scope:  Steam to radiators will be shut down to repair control valves.

Services Impacted:  This will affect building heat and might also affect domestic hot water temperatures.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Esslinger Hall

1/25/24 and 2/08/24 Huestis Hall Basement Domestic and Industrial Water Shutdown

UPDATE 2/06/24:
The valves for this shutdown have arrived, however the contractor has additional prep work to perform prior to the shutdown that was unforeseen.  This shutdown will occur on Thursday, February 8th from 7:00 am – 1:30 pm.

 

UPDATE 1/31/24:
The domestic water valves have arrived.  Work will take place on Wednesday, February 7th, from 7:00 am to 1:30 pm.
– Domestic hot and cold water will be offline.
– Restroom and handwashing sink fixtures will not be available during this outage.

 

UPDATE 1/23/24:
Delivery of the domestic water valves is delayed. Tomorrow’s shutdown for January 24th will be rescheduled for a later date.  A new shutdown notice will be distributed.

The project is proceeding with the Thursday, January 25th  industrial water shutdown from 7:00 am – 1:30 pm.   However, the shutdown affects industrial hot water only. There are no anticipated impacts to RO generation and therefore, the bypass is not necessary.

 

BeginJanuary 24, Thursday, January 25, 2024, at 7:00 am

End:      Thursday, January 25, 2024, at 1:30 pm

Additional Date:  Thursday, February 7 8, 2024, from 7:00 am to 1:30 pm

Building(s) or Area(s) Affected:  Huestis Hall basement

Scope:  Contractor will install control valves on the existing domestic and industrial water lines over two days.

Services Impacted:

  • January 24, February 7, Thursday, February 8, 7:00 am – 1:30 pm:  Domestic hot and cold water will be offline. Restroom and handwashing sink fixtures will not be available during this outage.
  • Thursday, January 25, 7:00 am – 1:30 pm:  Industrial and RO water service will be offline. Bypass valve will be open to provide cold water for the RO generator.

Work Performed By:  Siemens and JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall

1/02/24 – 1/03/24 Walton Replacement Buildings B and C Hot Water Shutdown

Begin:  Tuesday, January 2, 2024, at 4:00 pm

End:      Wednesday, January 3, 2024, at 3:00 pm

Building(s) or Area(s) Affected:  Walton Replacement Buildings B and C

Scope:  In order to repair a faulty steam valve, steam to both buildings will be shut down.

Services Impacted:  Domestic hot water in both buildings will be unavailable for the duration of the work.

Work Performed By:  Fortis and Alliant with CPFM Utilities and Energy support

ContactGeorge Bleekman, CPFM Owner’s Representative, 541-346-2625

Current construction and impacts information can be found on the UO Maps site.

map view of new res halls

12/28/23 Huestis Hall Basement Domestic Hot and Cold Water Shutdown

Begin:  Thursday, December 28, 2023, at 7:00 am

End:      Thursday, December 28, 2023, at 1:30 pm

Building(s) or Area(s) Affected:  Huestis Hall basement

Scope:  Domestic water service will be offline to install a new mixing valve for the safety showers as part of the connections with the Huestis Hall project.

Services Impacted:  During this shutdown, the following will not be available for use – restrooms, handwashing sinks, drinking fountains, safety showers.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall