8/12/23 Huestis Hall and Lokey Labs Domestic Water Shutdown

Begin:  Saturday, August 12, 2023, at 7:00 am

End:      Saturday, August 12, 2023, at 3:00 pm

Building(s) or Area(s) Affected:  Huestis Hall Basement, Lokey Labs

Scope:  As part of the Huestis Renovation project, domestic water will be shut down on a Saturday to allow for final connections of the new domestic water main.

Services Impacted:  Handwashing sinks, lab sinks, toilets and drinking fountains will not be available during this event.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall and Lokey Labs

 

7/26/23 Prince Lucien Campbell (PLC) Heat for Hot Water Shutdown

Begin:  Wednesday, July 26, 2023, at 8:00 am

End:      Wednesday, July 26, 2023, at 1:00 pm

Building(s) or Area(s) Affected:  Prince Lucien Campbell

Scope:  Heat to all hot water (domestic and heating) in PLC will be turned off to work on a steam line.

Services Impacted:  Water in the building will continue to flow, but it will not get hot.

Work Performed By:  CPFM Facilities Mechanical Shop

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Prince Lucien Campbell Hall

7/19/23 Lawrence Hall Emergency Hot Water Shutdown

UPDATE:
The hot water has been returned to service.

 

Begin:  Wednesday, July 19, 2023 – effective immediately

End:      Wednesday, July 19, 2023 – approximately 3 hours

Building(s) or Area(s) Affected:  Lawrence Hall

Scope:  The hot water system has been shut down to make an emergency repair.

Services Impacted:  Hot water will be offline during this time.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Lawrence Hall

UPDATED: 8/28/23 – 8/30/23 Global Scholars Hall Steam Shutdown

Begin: Wednesday, August 9, 2023 at 2:00 pm  Monday, August 28th, 2023 at 2:00 pm

End:      Friday, August 11, 2023, at 4:00 pm Wednesday, August 30th, 2023 at 4:00 pm

Building(s) or Area(s) Affected:  Global Scholars Hall

Scope:  Due to a failing steam flow meter, the building steam heat and hot water will be shut down to replace the meter and upgrade piping to meet campus standards.

Services Impacted:

  • Building steam heat and the domestic hot water will be offline during this time.
  • Work will take place in the utility tunnel and main mechanical room.

Work Performed By:  S2 Industrial

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

 

7/10/23 Living Learning Center North Domestic Water Shutdown

Begin:  Monday, July 10, 2023, at 10:00 am

End:      Monday, July 10, 2023, at 3:00 pm

Building(s) or Area(s) Affected:  Living Learning Center North

Scope:  EWEB will be shutting down a water line fed from Agate Street in order to move a fire hydrant for the Walton Replacement Project. This line will be isolated between Agate Street and a valve north of Living Learning Center North.

Services Impacted:  This will shut down the domestic water line to the LLC North building only, affecting drinking fountains, sinks, and restrooms.

Work Performed By:  EWEB

ContactGeorge Bleekman, CPFM Owner’s Representative, 541-346-2625

Current construction and impacts information can be found on the UO Maps site.

Image of area around Living Learning North

7/06/23 PeaceHealth North Domestic Water Shutdown

Begin:  Thursday, July 6, 2023, at 5:00 am

End:      Thursday, July 6, 2023, at 7:30 am

Building(s) or Area(s) Affected:  PeaceHealth North

Scope:  The main water line that supplies 677 E. 12th is in need of repair.  Work will be performed early in the morning.

Services Impacted:  There will not be any water during this time for drinking fountains, sinks, or toilets until the repair is completed.

Work Performed By:  Rexius and PeaceHealth North

ContactMelinda Seeley, CPFM Campus Planning, Real Estate Property Specialist, 541-346-5550

Current construction and impacts information can be found on the UO Maps site.

Image of PeaceHealth North

6/14/23 – 6/15/23 – 1715 Franklin North Wing Drainage System Shutdown

UPDATE:
While repairs are made to the sewage lift station, seven parking spaces (#8 – #14) will be blocked off for the contractor’s pump truck.  These spots are located directly in front of the east entrance.

Image of parking lot at 1715 Franklin

 

Begin:  Wednesday, June 14, 2023, at 7:00 am

End:      Thursday, June 15, 2023, at 5:00 pm

Building(s) or Area(s) Affected:  1715 Franklin Blvd – North Wing

Scope:  Due to sewage lift station repair/upgrade, all drain piping will be out of service on the first and second floor of the north wing until repairs are complete.

Services Impacted:  This will impact usage of domestic hot and cold water in all sinks, toilets, urinals, and drinking fountains.

Special InstructionsPlease use restrooms and sinks in the south wing.

Work Performed By:  CPFM Facilities and Roto Rooter

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of 1715 Franklin 1st floor north wing

5/22/23 Jordan Schnitzer Museum of Art Domestic Hot and Cold Water Shutdown

UPDATE:
The domestic water has been restored and work outside of Chapman is complete.

 

Begin:  Monday, May 22, 2023, at 7:00 am

End:      Monday, May 22, 2023, at 11:00 am

Building(s) or Area(s) Affected:  Jordan Schnitzer Museum of Art

Scope:  The domestic hot and cold water will be shut down to repair a fire line backflow assembly located near 13th Ave, by the NW corner of Chapman Hall, however, this will not interfere with Chapman’s domestic water supply.

Services Impacted:  This will affect all of the JSMA’s domestic hot and cold water, all restrooms, and drinking fountains.

Work Performed By:  Harvey and Price

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Chapman Hall and backflow location

4/18/23 – 4/19/23 Klamath and Price Science Commons Automation System Panel Upgrades Advisory

Begin:  Tuesday, April 18, 2023, at 6:00 am

End:      Wednesday, April 19, 2023, at 10:00 am

Building(s) or Area(s) Affected:   Klamath Hall and Price Science Commons

Scope:  Due to building automation system upgrades, two Siemens building automation system panels will be upgraded to provide better reliability of the building mechanical systems.  We will perform one panel upgrade per day starting at 6:00 am with systems returning to some level of operation by 8:00 am and all systems operating normally by 10:00 am.

4/18/23: PXCM60 – Located in Klamath Hall,

Systems impacted:
– Air Handling Unit Systems serving Klamath Hall Ground, 1st, and 2nd Floors
– Lab and Domestic Hot Water Heating System serving Klamath Hall
– Terminal HVAC devices and room temperature control serving Klamath Basement, Ground, 1st, and 2nd floor
– Lighting Controls: Lab 261

4/19/23: PXCM187 – Located in Klamath Hall,

Systems Impacted:
– Air Handling Unit Systems serving Price Science Commons and Klamath Basement
– Chilled water System serving Price Science Commons
– Heating Water System serving Price Science Commons and Klamath Hall
– Terminal HVAC equipment serving Price Science Commons
– Domestic Hot Water System serving Price Science Commons

Work Performed By:  Siemens

ContactKevin Waldrop, CPFM Facilities Engineer, 541-346-2315

Current construction and impacts information can be found on the UO Maps site.

Image of Klamath and Price Science Commons

3/28/23 Living Learning Center North and South Steam Shutdown

Begin:  Tuesday, March 28, 2023, at 7:00 am

End:      Tuesday, March 28, 2023, at 1:00 pm

Building(s) or Area(s) Affected:  Living Learning North and South

Scope:  Due to a steam pipe component leak, building heat, and hot water will be shutdown to remove and install new component gaskets.

Services Impacted:

  • Domestic hot water and building heat will be down during this time.
  • Work will take place in room 020 of LLC North.

Work Performed By:  Utilities and Energy

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Map of Living Learning Center

1/24/23 Fine Arts Studios and Millrace Studios Emergency Domestic Water Shutdown

UPDATE:
The water has been restored.

 

Begin:  Tuesday, January 24, 2023 – effective immediately

End:      Unknown

Building(s) or Area(s) Affected:  Millrace 1, 2, and 3, and all Fine Arts Studios

Scope:  Emergency shutdown of domestic water due to contractor hitting the water line at the north end of the parking lot, behind Knight Campus.  Domestic water will be offline until repairs can be made.  An update will be sent when water has been restored.

Services Impacted:  Domestic water not available.

Work Performed By:  CPFM Facilities Crews

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

1/24/23 Oregon Hall Steam Heat and Hot Water Shutdown

UPDATE:
The steam was restored today at 1:45 pm.

 

Begin:  Tuesday, January 24, 2023 at 11:00 am

End:      Tuesday, January 24, 2023 at 3:00 pm

Building(s) or Area(s) Affected:  Oregon Hall

Scope:  Due to a failed steam pressure relief valve, building steam heat and hot water will be briefly shutdown to replace the valve.

Services Impacted:

  • Domestic hot water and building steam heat will be offline during this time.
  • Work will take place in the utility tunnel and mechanical room 001.

Work Performed By:  CPFM Utilities & Energy

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

12/13/22 – 12/15/22 Student Rec Center Steam and Hot Water Shutdown

Begin:  Tuesday, December 13th, 2022, at 10:00 pm

End:      Thursday, December 15th, 2022, at 4:00 pm

Building(s) or Area(s) Affected:  Student Rec Center (SRC)

Scope:  Due to a failing steam flow meter and damaged steam expansion joint, the steam heat and hot water to the Student Recreation Center will be shutdown to affect repairs. The meter, expansion joint, and associated piping will be re-insulated after repairs. All work will take place in the tunnel and mechanical room 004.

Services Impacted:  This will affect the building heating systems and the domestic hot water.

Work Performed By:  S2 Industrial

ContactKyle Wilson, CPFM Utilities Maintenance Manager, 541-346-2246

Current construction and impacts information can be found on the UO Maps site.

12/12/22 – 12/13/22 – Living Learning Center Steam Shutdown

UPDATE 12/5/22:  This work has been rescheduled for 12/12/22 at 10:00 pm – 12/13/22 at 3:00 pm

POSTPONED:  This work is being postponed until the Winter Break, fixed dates and time to be determined

BeginTuesday, November 22nd, 2022 at 11:00 pm Monday, December 12th, 2022 at 10:00 pm

End:      Wednesday, November 23rd, 2022 at 3:00 pm Tuesday, December 13th, 2022 at 3:00 pm

Building(s) or Area(s) Affected:  Living Learning Center North and South

Scope:  Due to a leaking main steam valve and drainpipe, the building heat and hot water will be shut down to replace the valve and repair the pipe.  Work will take place in room #20 and in the adjacent utility tunnel.

Services Impacted:

  • This will affect the heat and domestic hot water in both the North and South buildings.
  • Slight noise from grinding and odor from welding will occur.

Work Performed By:  S2 Industrial and Utilities & Energy staff

ContactKyle Wilson, CPFM Utilities Maintenance Manager, 541-346-2246

To view current construction and impacts, visit UO Map.

 

11/16/22 Volcanology, Pacific, Cascade, and Columbia Halls Steam Shutdown Advisory

Begin:  Wednesday, November 16th, 2022, at 7:30 am

End:      Wednesday, November 16th, 2022, at 3:00 pm

Building(s) or Area(s) Affected:  Volcanology, Pacific Hall, Cascade Hall, and Columbia Hall

Scope:  A valve installation related to an emergency steam pipe replacement will be conducted

Services Impacted:  Steam will be shutdown and there will be no heat or hot water to the buildings for the duration of the work.  This work will be expedited as much as possible and steam service restored following its completion.

Work Performed By:  S2 Industrial

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.

11/08/22 Zebrafish International Resource Center Steam Shutdown

Begin:  Tuesday, November 8th, 2022 at 11:00 am

End:      Tuesday, November 8th, 2022 at 3:00 pm

Building(s) or Area(s) Affected:  Zebrafish International Resource Center

Scope:  Due to a leaking main steam valve, the steam will be shut down to make repairs.

Services Impacted:  This will affect the building heat and the domestic hot water.

Work Performed By:  CPFM Utilities & Energy

ContactKyle Wilson, CPFM Utilities Maintenance Manager, 541-346-2246

To view current construction and impacts, visit UO Map.

 

11/03/22 Bean Hall Steam Heating and Hot Water Shutdown

UPDATE:
The work has been completed.

 

Begin:  Thursday, November 3rd, 2022, at 10:00 am

End:      Thursday, November 3rd, 2022, at 3:00 pm

Building(s) or Area(s) Affected:  Bean Hall

Scope:  Due to a steam valve leak in the tunnel, the steam has been shut down to make repairs.

Services Impacted:  This will affect the building heat and the domestic hot water.

Work Performed ByCPFM Utilities & Energy

ContactKyle Wilson, CPFM Utilities Maintenance Manager, 541-346-2246

To view current construction and impacts, visit UO Map.

10/26/22 Price Science Commons and Cascade Hall Discolored Water Advisory

Buildings Affected:  Price Science Commons and Cascade Hall

Scope:  Yesterday (Wednesday, October 26th) Price Science Commons and Cascade Hall experienced discolored water.  Facilities Services and EHS responded to attempt to identify the cause of the discoloration.  FS custodians flushed the potable water systems in both buildings overnight.

FS plumbers have investigated the points of connection for these 2 building and EHS performed another inspection this morning at 6:30am.  The results of the inspection identified probable iron sediment dislodge as part of the Huestis renovation project.

FS and EHS will continue to monitor the water and  respond to discoloration calls from the call log.

ContactJim Cody, CPFM Associate Dir. of Facilities Services, 541-346-2302

To view current construction and impacts, visit UO Map.

10/17/22 – 10/18/22 Lawrence Hall 106 and 107C Water Line Construction Activity Advisory

Begin:  Monday, October 17th, 2022 at 7:00 am

End:      Tuesday, October 18th, 2022 at 5:00 pm

Building(s) or Area(s) Affected:  Lawrence Hall rooms 106, 107C, and associated hallway

Scope:

  • A contractor will be both cutting and draining pipes, as well as core drilling within the Lawrence Hall office spaces shown as highlighted (see diagram below).
  • Core drilling will occur between the hours of 8:00 am and 10:00 am on 10/17/22.  Construction noise will occur intermittently during this time.
  • While pipe draining occurs be advised that the contractor will be removing water from the space and a hose running to the nearest drain may be required.  The hose, if required, will be protected with cones and markers to isolate it’s run from general office traffic however, being aware of your surroundings during this time is encouraged.

Services Impacted:  No significant service interruptions are expected

Work Performed By:  Phoenix Mechanical / Harvey and Price

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.

10/10/22 Huestis Basement Domestic and Industrial Water Outage

Begin:  Monday, October 10th, 2022 at 7:30 am

End:      Monday, October 10th, 2022 at 8:30 am

Building and Area:  Huestis Basement

Scope: There will be a brief power outage to the domestic hot water and industrial water circulation pumps in the basement of Huestis Hall to install a temporary panel for power during construction

Services Impacted:  This will shutdown the domestic hot water and industrial water

Work Performed By:  EC

Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

10/04/22 – 10/06/22 Willamette Hall Steam System Shutdown

Begin:  Tuesday, October 4th, 2022 at 12:00 noon

End:      Thursday, October 6th, 2022 at 4:00 pm

Building(s) or Area(s) Affected:  Willamette Hall

Scope:  Due to a failing steam meter, the building steam heat will be shut down to replace the meter and insulation in the tunnel.

Services Impacted:  This will affect the building’s heating system, domestic hot water, the heating hot water, and steam condensate.

Work Performed By:  CPFM Utilities & Energy and a contractor

ContactKyle Wilson, CPFM Utilities Maintenance Manager, 541-346-2246

To view current construction and impacts, visit UO Map.

9/08/22 1900 Millrace (Innovation Center) Domestic Hot and Cold Water Shutdown

UPDATE:  The domestic hot and cold water to the building has now been restored

Begin:  Thursday, September 8th, 2022 at 8:00 am

End:      Thursday, September 8th, 2022 at 12:00 pm

Building(s) or Area(s) Affected:  1900 Millrace

Scope:  The domestic water will be shut down to repair an outside hose bib.

Services Impacted:  This will shut down the hot and cold water to the entire building.

Work Performed By:  CPFM FS Plumbing Dept.

ContactOlin Vermillion, CPFM Facilities Services Plumbing, 541-346-2319

8/23/22 UPDATE: Many Nations Longhouse Emergency Domestic Water Shutdown

UPDATE:   The Domestic Water to the Longhouse has now been restored

Begin:  Tuesday, August 23, 2022 – effective immediately

End:      Undetermined    Completed

Building(s) or Area(s) Impacted:  Many Nations Longhouse         

Scope:  A contractor accidentally damaged the domestic water line to the Longhouse causing the shutdown

Services Impacted:  All domestic water to the Longhouse will be shutdown until the supply line can be repaired

Work Performed By:  Contractor

ContactRon Warren, CPFM Facilities Plumbing, 541-346-2319

7/22/22 Huestis Hall – Domestic Water Shutdown Notice

Begin:  Friday, July 22, 2022 at 8:00 am

End:      Friday July 22, 2022 at 12:00 pm

Building(s) or Area(s) Impacted:  Huestis Hall Basement

Scope:  As part of the Huestis renovation project, the DHW-1 supplying domestic water will be shut down.

Services Impacted:  Training room sinks and restrooms

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

7/8/22 Gerlinger Hall Water Meter Replacement Notice

Begin:  Friday, July 8, 2022 at 6:00 am

End:      Friday, July 8, 2022 at 8:00 am

Building(s) or Area(s) Affected:  South East Gerlinger parking strip. The flow meter will be tested after install. Water from testing will be directed to the street gutter and is not a concern.

Scope:  Due to a failed water meter, EWEB will be replacing the meter for Gerlinger Hall early Friday morning. There will not be any water outage. The meter bypass water pipeline will be active during the work.

Services Impacted:  There will be little to no impact to campus.

Work Performed By:  EWEB

ContactKyle Wilson, CPFM Utilities Maintenance Manager, 541-346-2246