12/13/22 – 12/15/22 Student Rec Center Steam and Hot Water Shutdown

Begin:  Tuesday, December 13th, 2022, at 10:00 pm

End:      Thursday, December 15th, 2022, at 4:00 pm

Building(s) or Area(s) Affected:  Student Rec Center (SRC)

Scope:  Due to a failing steam flow meter and damaged steam expansion joint, the steam heat and hot water to the Student Recreation Center will be shutdown to affect repairs. The meter, expansion joint, and associated piping will be re-insulated after repairs. All work will take place in the tunnel and mechanical room 004.

Services Impacted:  This will affect the building heating systems and the domestic hot water.

Work Performed By:  S2 Industrial

ContactKyle Wilson, CPFM Utilities Maintenance Manager, 541-346-2246