10/26/22 Lawrence Hall Core Drilling Advisory

Begin:  Wednesday, October 26th, 2022 at 5:30 am

End:      Wednesday, October 26th, 2022 at 8:00 am

Building(s) or Area(s) Affected:  Lawrence Hall Lobby (L100) and Exterior Entry

Scope:  Three holes will be cored at the main south entry of Lawrence Hall to provide access under the concrete slab for geo tech analysis of the subsurface.

  • Two holes will be cored inside the Lobby (L100)
  • One hole will be cored outside under the covered entry area

Services Impacted:  Access to the doors will be affected but will remain open.  Noise from the drilling should be expected.

Work Performed By:  Cutting Edge Concrete

ContactLuke Helm, CPFM Owner’s Representative, 458-256-7622

To view current construction and impacts. visit UO Map.

10/20/22 Exterior Areas of Volcanology, Columbia, and Cascade Annex Underground Utilities Work Advisory

Begin:  Thursday, October 20th, 2022, at 7:30 am

End:      Thursday, October 20th, 2022, at end of day

Building(s) or Area(s) Affected:  Lawn area and sidewalk between Volcanology and Columbia, and also by Cascade Annex West

Scope:  A contractor will be performing mapping and excavation of underground utilities between the Volcanology Building and Columbia Hall, and then adjacent to Cascade Annex West.   Work is anticipated to occur outside Volcanology from 7:30am to 10:00am, then proceed to the Cascade Annex area for the remaining time.

Services Impacted:

  • During this work, travel along the adjacent sidewalk(s) will be blocked at times.  Please consider taking other paths of travel.
  • Medium level construction noise will be occurring during this time.

Work Performed By:  Vac-X

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.

10/17/22 – 10/22/22 Lawrence Hall 106 and 107C HVAC Construction Activity Advisory

Begin:  Monday, October 17th, 2022

End:      Saturday, October 22nd, 2022

Building(s) or Area(s) Affected:  Lawrence Hall

Scope:  Contractor will be working on a HVAC installation in the ceiling of the highlighted rooms (see diagram below).

Services Impacted:  No service interruptions are expected, however light construction noise and movement of materials will occur intermittently throughout the duration of the project.

Work Performed By:  Phoenix Mechanical

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.

10/17/22 – 10/18/22 Streisinger Hall Basement Core Drilling Noise and Vibration Advisory

Begin:  Monday, October 17th, 2022 at 7:00 am

End:      Tuesday, October 18th, 2022 at 3:00 pm

Building(s) or Area(s) Affected:  Streisinger Hall basement

Scope:  A contractor will be performing core drilling in the basement – see picture below.

Services Impacted:  No services shall be interrupted, but please be prepared for intermittent noise and vibration throughout the work.

Work Performed By:  EC Electric

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.

 

10/13/22 East 13th Avenue Emergency Tree Branch Removal and Access Advisory

UPDATE:
The tree work has been completed.

 

Begin:  Thursday, October 13th, 2022 – effective immediately

End:      Thursday, October 13th, 2022 – unknown

Building(s) or Area(s) Affected:  East 13th Avenue in front of Chapman Hall

Scope:  A large overhanging branch was hit by a delivery truck and needs to be removed immediately. The area will be cordoned off.

Services Impacted:  This affects pedestrian traffic in the Street Faire area.  Work is expected to be finished within a couple of hours.

Work Performed By:  CPFM Landscape Crew

ContactRosalee Clanton, CPFM Landscape Maint Supervisor, 760-445-7302

To view current construction and impacts, visit UO Map.

10/10/22 – 10/14/22 Huestis Basement and Lokey Labs Construction Noise and Vibration Advisory

Begin:  Monday, October 10th, 2022 at 6:00 am

End:      Friday, October 14th, 2022 at 4:00 pm

Building and Area:  Huestis Basement and Lokey Labs

Scope:  As part of the ongoing demolition work in Huestis Hall, contractors will be chipping away and removing concrete house keeping pads in the basement mechanical room.

Services Impacted:  Noise and vibration may be disruptive to occupants in the Zebrafish Facility as well as Lokey Labs

Work Performed By:  Staton

Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

10/04/22 – 10/06/22 Onyx Bridge HVAC Light Construction Noise Advisory

Begin:  Tuesday, October 4th, 2022

End:      Thursday, October 6th, 2022

Building(s) or Area(s) Affected:  Onyx Bridge – second floor, west hallway

Scope:  An HVAC contractor will be installing HVAC equipment and related piping.  The work will be non-invasive but be aware there will be contractors working in the area and light construction noise will occur.

Services Impacted:  No impact to services is expected

Work Performed By:  Phoenix Mechanical

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.

9/26/22 – 9/30/22 University Hall and Villard Hall Light Construction Advisory – REVISED DATE

DATE REVISED:
The work described in this notice was unfortunately postponed but has been rescheduled for Monday, September 26 through Friday, September 30.

 

Begin:  Monday, September 12th, 26th, 2022 at 8:00 am

End:      Friday, September 16th, 30th, 2022 at 4:00 pm

Building(s) or Area(s) Affected:  University Hall and Villard Hall

Scope:  For the “Heritage Project” (University and Villard Halls), our General Contractor (Fortis) will be performing some very light selective demolition within both buildings. This will range from drilling some small holes, to opening up some larger areas in walls and floors to assess and document existing conditions. EH&S has approved the assessment locations. All areas will be covered and safe immediately after each task takes place.

Services Impacted:  Light construction in these locations:

  • University Hall – General public areas, hallways, and room 012, and 011A
  • Villard Hall – Basement hallway (003), Pocket Playhouse (024), and storage room (011)

Work Performed By:  Fortis Construction

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

To view current construction and impacts. visit UO Map.

9/24/22 Huestis Hall, Lokey Labs, Streisinger Hall Noise and Vibration Advisory

UPDATE: Work was completed.  See notice “11/28/22 – 12/7/22 Huestis Hall Demolition Noise Advisory”

UPDATE:  This work has been cancelled and will be scheduled at a later time TBD

Begin: Saturday, September 24, 2022 at 6:00 am TBD

End:    Saturday, September 24, 2022 at 6:00 pm TBD

Building(s) or Area(s) Affected:  Huestis Hall, Streisinger Hall, and Lokey Labs

Scope:  Demolition activities on level 1, north lobby of Huestis Hall

Services Impacted:  The equipment used during this work will create noise and vibration.

Work Performed By: Lease Crutcher Lewis and Staton

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

To view current construction and impacts. visit UO Map.

9/22/22 Volcanology and Columbia Lawn Construction Activity Advisory 9/22/22

Begin:  Thursday, September 22, 2022 at 7:00 am

End:      Thursday, September 22, 2022 at 10:30 am

Building(s) or Area(s) Affected:  Lawn Located Between Columbia and Volcanology

Scope:  This Thursday morning, Vac-X will be performing work in the lawn area adjacent to the Volcanology building (shown in pic). Expect intermittent mid-to-high level construction noise during the course of the work.

Services Impacted:  The contractor will be parking near the sidewalk, out of the walkways, and the work zone will be roped off.

Special Instructions:  Please avoid the area while work is occurring.

Work Performed By:  Vac-X

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.

9/21/22 – 9/23/22 Fine Arts / Gallery Walk Underground Utilities Work Advisory

UPDATED SCHEDULE:

  • 9/21 – Cancelled
  • 9/22 – Cancelled
  • 9/23 – Core Drilling of Asphalt (smaller targeted locations) and Vacuum Excavation (at removed asphalt locations)
  • 9/26 – Surveyor documentation of utility locations

 

 

BeginWednesday, September 21st, 2022 Friday, September 23rd, 2022 at 8:00 am

End:      Friday, September 23rd, 2022 Monday, September 26th, 2022 at end of day

Building(s) or Area(s) Affected:  Exterior of Fine Arts buildings in north campus – See map below

Scope:  Site investigations to locate underground utilities.

  • 9/21 at 8:00 am – Core Drilling of Asphalt (smaller targeted locations) cancelled
  • 9/22 at 7:00 am – Vacuum Excavation (at removed asphalt locations) cancelled
  • 9/23 – Surveyor documentation of utility locations  Core Drilling of Asphalt (smaller targeted locations) and Vacuum Excavation (at removed asphalt locations)
  • 9/26 – Surveyor documentation of utility locations

Services Impacted:  This affects mainly bicycle & pedestrian traffic plus will create noise when equipment is in use.

Work Performed By:  Empire Concrete Cutting, Mid State Industrial

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

To view current construction and impacts. visit UO Map.

9/12/22 – 9/14/22 Streisinger Hall Conduit Installation Advisory

Begin:  Monday, September 12th, 2022 at 7:30 am

End:      Wednesday, September 14th, 2022 at 5:00 pm

Building(s) or Area(s) Affected:  Streisinger Hall

Scope:  An electrical contractor will begin installing new fire alarm conduits within the Streisinger electrical rooms.

Services Impacted:

  • Be advised some minimal roto hammering noise will be generated at the beginning of the work, anticipated to last 30 minutes.
  • Besides contractors being in the area, no other effects are anticipated.

Special Instructions:

Work Performed By:  EC Electric

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.

9/06/22 – 12/9/22 Knight Library Roofing Project Advisory

UPDATE 12/2/22:

This work is not yet complete, work will continue through next week with a projected completion date of 12/9/22

UPDATE 11/14/22:
Roofing on Knight Library should be complete by week of 11/28 based on favorable weather projections.  Construction fencing will be removed once roofing is complete and bike/pedestrian access will be restored at that time.

Thank you for your patience during this challenging project.

UPDATE 10/26/22:
Due to weather delays and unforeseen conditions, the completion date has been extended until November 30th.

 

Begin:  Tuesday, September 6th, 2022 at 6:30 am

End:      Friday, October 28th, 2022 Wednesday, November 30th Monday, November 28th, 2022 at 5:00 pm Friday, December 9th, 2022

Building(s) or Area(s) Affected:  Knight Library plus west side of Gerlinger Annex alley way between Knight Library and Cemetery.

Scope:  Roofing replacement work has begun on the middle and south sections of the building.

Services Impacted:

  • There may be some dust and odors from this work outside the building.
  • The East side of the building is closed to bikes and pedestrians.  Signs are posted to direct pedestrian and bike traffic around the North and West sides of the building.
  • Building occupants can expect to hear construction noises associated with this work which are: crane engine, banging and bumps on the 4th floor.

Work Performed By:  Preferred Construction and Umpqua Roofing

ContactBruce Budzik, CPFM Small Projects & Cap Imp Manager, 541-346-8834

To view current construction and impacts. visit UO Map.

9/06/22 – 9/19/22 Huestis, Streisinger, Willamette, Klamath, & Lokey Labs Noise/Vibration Advisory

UPDATE 9/16/22:
The completion date has been extended to the end of the day on Monday, September 19th.

 

UPDATE 9/7/22:
This work will continue into next week, however, with less noise and vibration, as well as more intermittent. The updated end time is 9/16 at 5:00 pm.

 

Begin:  September 6th  2022 at 7:00 am

End:      September 9, 16, September 19th, 2022 at 5:00 pm

Buildings Affected:  Huestis, Streisinger, Willamette, Klamath, Lokey Labs

Scope:  As part of the Huestis Renovation Project, the hole around the new structural tower on the west side of Huestis will be filled in the week of September 6, 2022. The equipment used for this work could generate some noise and vibration.

Services Impacted:  Possible noise and vibrations heard and felt in surrounding buildings.

Work Performed By: Lease Crutcher Lewis

Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880

9/06/22 – 9/07/22 Student Rec Center SE Patio Construction and Noise Advisory

Begin:  Tuesday, September 6th, 2022

End:      Wednesday, September 7th, 2022

Building(s) or Area(s) Affected:  Student Rec Center

Scope: Exterior repairs take place on the southeast corner of the covered patio area, on the east side of the building.

Services Impacted:

  • Advisory only – no impacts to the use of the building or fields is expected.
  • Some intermittent noise from light construction activities will be heard (hammering, drilling, cutting).

Work Performed By:  Contractor

ContactJustin Grishkin, CPFM Construction Services Manager, 541-346-5242

To view current construction and impacts, visit UO Map.

8/22/22 – 9/16/22 CPFM Quonsets 128, 132, and 133 Demolition Advisory

UPDATE:

  • Expect noise and vibration from concrete demolition and heavy equipment use mid to end of this week (8/31 to 8/2).
  • Project timeline extended 2 weeks to 9/16.

 

Begin:  Monday, August 22nd, 2022

End:    Friday, September 2nd 16th, 2022

Building(s) or Area(s) Affected:  CPFM Quonsets 128, 132, and 133

Scope:  Demolition of three (3) Quonset structures and resurfacing of asphalt will take place on the north side of the CPFM Compound.

Services Impacted:

  • Service parking within project footprint will be impacted for the duration of the project.
  • There will be no impact to vehicle circulation within the compound.
  • Contractor vehicles and equipment will be coming and going from the job site.
  • Elevated noise levels can be expected.

Work Performed By:  PMG & CPFM Facilities Services

ContactJustin Grishkin, CPFM Construction Services Manager, 541-346-5242

To view current construction and impacts, visit UO Map.

8/19/22 Chiles Pressure Washing of Exterior Benches / Noise Advisory

UPDATE:
The pressure washing of the benches has been rescheduled for Friday, 8/19/22.

 

BeginThursday, August 18th, 2022 Friday, August 19th, 2022 at 7:30 am

End:      Thursday, August 18th, 2022 Friday, August 19th, 2022 at 11:30 am

Building(s) or Area(s) Affected:  South side of Chiles

Scope:  The benches in the courtyard on the south side of Chiles will be pressure washed.

Services Impacted:  Loud noise is to be expected during this event.

Work Performed By:  CPFM Facilities Crew

ContactGabe Hein, CPFM Facilities Services, 541-346-2319

To view current construction and impacts, visit UO Map.

8/15/22 – 9/23/22 Baker Downtown Center Reroofing Project Advisory

Begin:  Monday, August 15th, 2022

End:      Friday, September 23rd, 2022

Building(s) or Area(s) Affected:  Baker Downtown Center

Scope:  Phase 2 of the Baker Reroofing project will begin next Monday.  The projected completion date is mid-September.

Services Impacted:

  • Parking lot 1E will be occupied by the roofing company for the duration of the project.
  • Access to the Printing Services Department will be through the alley on the east side of the building.

Work Performed By:  Anderson Roofing and All Aspects Environmental

ContactLuke Helm, CPFM Owner’s Representative, 541-346-8216

To view current construction and impacts. visit UO Map.

8/01/22 PLC Fire Alarm Noise Advisory

Begin:  Monday, August 1st, 2022 at 6:00 AM

End:    Monday, August 1st, 2022 at 8:00 AM

Building(s) or Area(s) Impacted:  PLC

Scope:  A contractor will be performing work on the fire system Monday morning. This may cause fire alarms to sound.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By:  UO Safety & Risk Services and a contractor

Contact: Zach Earl, UO Fire Systems Program Manager, 541-521-0351 or 541-346-9295.

8/01/22 – 9/16/22 McKenzie Hall Construction & Noise Advisory

Begin:  August 1, 2022

End:      September 16, 2022

Building(s) or Area(s) Impacted:  McKenzie Hall 121-123, H121, H125, 111, 113, 115, and 116

Scope: During a recent flood in the mechanical room, ducts that provide ventilation to a portion of the first floor were damaged and cannot be re-used. New overhead ductwork and sprinkler piping to serve the classrooms and hallways shown will be installed.

Services Impacted:  We will be closing part of the SW section of McKenzie Hall to install new ductwork to classrooms 121-123 and the adjacent hallways H121 and H125. There will be no access to restrooms 111, 113, 115, and 116. Second floor rooms above the construction zone will experience light noise from work on first floor.

Work Performed By:  Harvey & Price

Contact: Jeff Madsen, CPFM Asst. Dir Engineer Utility Systems, 541-346-2256

7/11-7/13 Huestis Hall, Lokey Labs, Streisinger, LISB, Deschutes, Carson, Willamette, and Klamath Noise and Vibration Advisory

Begin:  July 11, 2022 at 7:00 am

End:      July 13, 2022 at 3:30 pm

Building(s) or Area(s) Affected:  Huestis Hall and surrounding buildings

Scope:  As part of the Huestis Hall renovation project, occupants and neighbors could experience noise and vibration due to additional bedrock chipping in the new elevator pit.

Services Impacted:  This will create noise and vibration.

Work Performed By: Lease Crutcher Lewis

Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880

7/6/22 Onyx Bridge HVAC Construction Activity Advisory

Begin:  Wednesday, July 6th, 2022 at 7:00 am

End:      Wednesday, July 6th, 2022 at 9:00 am

Building(s) or Area(s) Affected:  Onyx Bridge

Scope:  As part of an HVAC installation within room 291, be advised that contactors will be drilling through the adjacent hallway wall, for approximately two hours, in order to prep for incoming refrigerant lines.

Services Impacted:

  • The areas that will be affected by the construction noise and activity are room 291 and the adjacent hallway, as shown in the picture below.
  • This is not expected to cause disturbances to adjacent spaces beyond some moderate construction noise during the course of the work.

Work Performed By:  Phoenix Mechanical

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

To view current construction and impacts. visit UO Map.

6/29-7/7 Klamath Hall Noise Advisory

Begin:  June 29th, 2022 in the morning

End:      July 7th, 2022

Building(s) or Area(s) Affected:  Klamath Hall Room 019

Scope:  Due to plumbing modifications in Klamath 019, there will be intermittent noise from activities such as cutting out old piping and attaching new anchors to the concrete ceiling.

Services Impacted:  Noise can be expected in spaces around, above, and below Klamath 019.

Work Performed By: Total Mechanical

Contact: Tim Allenbaugh, CPFM Owner’s Representative, 541-346-8214

To view current construction and impacts. visit UO Map.

6/27/22 – 6/29/22 Many Nations Longhouse Domestic Hot and Domestic Cold Water Shutdown

UPDATE:
The repairs have been completed and the system is operational.
UPDATE:
This shutdown has been extended to 4:00 pm tomorrow, Wednesday, June 29th.
Work is expected to take place from 9:00 am to 4:00 pm.
Noise from the construction equipment will be heard in that area.

 

Begin:  Monday, June 27, 2022 at 7:00 am

End:      Wednesday, 29, 2022 at 7:00 am 4:00 pm

Building: Many Nations Longhouse

Scope: Due to damage to a sewer pipe, Roto Rooter will be excavating a small area of ground in the grass west of the Longhouse. The sewer pipe with be repaired and relined.

Services Impacted: Domestic Hot and Cold Water. All restroom, sinks, drains, and faucets will be shut down temporarily

Work Performed By:  Roto Rooter

ContactKyle Harshbarger, CPFM Mechanical and Plumbing Shop Manager, 541-346-5406

To view current construction and impacts, visit UO Map.

6/22/22 – 6/24/22 EMU Construction Work and Loud Noise Advisory

When:

  • Wednesday, June 22nd, 2022 at 7:00 am – 9:00 am
  • Thursday, June 23rd, 2022 at 7:00 am – 9:00 am
  • Friday, June 24th, 2022 at 7:00 am – 9:00 am

Building(s) or Area(s) Affected:  Erb Memorial Union (EMU)

Scope:  Structural connections to steel and concrete will be performed by a contractor on the north end of room 036.  These connections will be made with a propane tool that makes a very loud pop when used.  There will be approximately 30 connections made over the next three mornings.

Services Impacted:  Loud noise will be heard during this time.

Work Performed By:  Bridgeway Contracting

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

To view current construction and impacts. visit UO Map.

emug (1)