12/27/23 EC Cares 1500 W. 12th Ave. Domestic Water Shutdown

Begin:  Wednesday, December 27, 2023 at 8:00 am

End:      Wednesday, December 27, 2023 at 12:00 pm

Building(s) or Area(s) Affected:  EC Cares 1500 W. 12th Ave.

Scope:  Water will be shut off for the building to replace a leaking pressure regulator.

Services Impacted:  Domestic hot and cold water as well as drinking fountains will be unavailable during the shutdown.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

EC Cares on map

11/28/23 – 11/29/23 Johnson Hall Restroom Room 006 Painting Shutdown

Begin:  Tuesday, November 28, 2023  7:30 am – 12:00 pm

End:      Wednesday, November 28, 2023  7:30 am – 12:00 pm

Building(s) or Area(s) Affected:  Johnson Hall Restroom, room 006.

Scope:  The restroom wall will be repainted due to damage from a recent water intrusion.

Services Impacted:  The restroom will be closed while the work is performed.

Special Instructions:  Please use a different restroom in the building during these times.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Johnson Hall on map

11/29/23 Matthew Knight Arena Marquee/Video Board Work Advisory

Begin:  Wednesday, November 29, 2023, at 8:30 am

End:      Wednesday, November 29, 2023, at 1:00 pm

Building(s) or Area(s) Affected:  Matthew Knight Arena

Scope:  The marquee/video board at the corner of Villard St. and Franklin Blvd., near the east entrance to Matthew Knight Arena, will have metal flashing installed.

Services Impacted:

  • There will be a lift truck blocking direct access to the North East entry on the main sidewalk.
  • Access to the arena will be available by walking around the area of work.
  • Noise is to be expected during this activity.

Work Performed By:  ES and A Signs

ContactLuke Helm, CPFM Owner’s Representative, 541-346-8216 or 458-256-7622

Current construction and impacts information can be found on the UO Maps site.

MKA on map

11/20/23 Klamath Hall Emergency Exhaust Fan Shutdown

UPDATE:  The repair has been completed and the exhaust fans returned to service.

Begin:  Monday, November 20, 2023, at 8:00 am

End:    Monday, November 20, 2023

Building(s) or Area(s) Affected:  Klamath Hall

Scope:  Due to a broken damper, exhaust fans 3 & 4 serving Klamath Hall will be shutdown for repairs some time between 8:00 am and 8:30 am this morning.

Services Impacted:  The air exhaust for all Klamath Hall will be affected.  An update will be sent out once the work is completed.

Special Instructions:  Fume hood sashes should be closed and containers within the fume hoods sealed prior to this time.

Work Performed By:  Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

klamath hall on map

11/7/23 Hendricks Hall Emergency Steam Shutdown

UPDATE:  The repair has been completed and the steam restored to the building.

Begin:  Effective Immediately – Tuesday, November 7, 2o23

End:      Tuesday, November 7, 2023

Building(s) or Area(s) Impacted:  Hendricks Hall

Scope:  Steam will be shutdown for an undetermined amount of time to make an emergency repair, another notice will be sent when it is turned back on.

Services Impacted:  This will affect the heating and HVAC system throughout the building.

Work Performed By:  CPFM Facilities Services

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

map showing Hendricks Hall

10/20/23 – 10/26/23 Prince Lucien Campbell Elevator Emergency Shutdown

UPDATE:
The part arrived and the elevator has been repaired.

 

Begin:  Friday, October 20, 2023 – effective immediately

End:      Unknown  Thursday, October 26, 2023

Building(s) or Area(s) Affected:  Prince Lucien Campbell

Scope:  The northern most elevator has been shutdown and will remain down at least through the weekend

Services Impacted:  The north elevator is out of service.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

map showing PLC

9/19/23 – 10/12/23 Lillis Hall North Entrance Closure

UPDATE 10/12/23: 
The north entrance of Lillis will be closed from 5:00 pm to 7:00 pm today for the final cleaning of the new tiles.

 

UPDATE 10/3/23:
Due to unforeseen subsurface conditions and weather, the North Lillis entrance will now be completely open October 9, 2023.

 

Begin:  Tuesday, September 19, 2023

End:      October 2, October 9, Thursday, October 12, 2023, at 7:00 pm

Building(s) or Area(s) Affected:  Lillis Hall North Entrance

Scope:  Repair work on the brick walkway outside of the North entrance will begin today.

Services Impacted:  This entrance will be closed entirely through 9/26/23 and then partially closed for the duration of the work.

Work Performed By:  Haps Machinery

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

lillis hall

8/14/23 and 8/28/23 Lokey Education Wing C Elevator Shutdown

UPDATE:
The contractor needs to come out again to complete this work, next Monday, August 28th.  The elevator will be down for the entire day.
If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

 

Begin:  Monday, August 14, 2023 at 8:30 am plus Monday, August 28, 2023

End:      Monday, August 14, 2023 at 5:00 pm plus Monday, August 28, 2023

Building(s) or Area(s) Affected:  Lokey Education Building (Wing C – Building #41)

Scope:  Due to warranty work required for the Lokey Elevator project, the elevator will be down for the day to service the equipment.

Services Impacted:  The elevator will be offline, please use alternate means of access during this time.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  TK Elevator

ContactDamon Rutherford, CPFM D&C Owner’s Representative, 541-346-8285

Current construction and impacts information can be found on the UO Maps site.

map of lokey education building C

8/15/23 Lawrence Hall Steam Heat Advisory

Begin:  Tuesday, August 15, 2023 at 8:00 am

End:      Tuesday, August 15, 2023 at 9:00 am

Building(s) or Area(s) Affected:  Lawrence Hall

Scope:  Due to the installation of a new steam pressure control valve, the steam will be turned on to set the pressure and check for leaks.  At the conclusion of testing the steam will be turned back off.

Services Impacted:  Little to no impact will be observed by building users.

Work Performed By:  Work will be performed by CPFM Utilities & Energy

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

map showing lawrence hall

8/23/23 Huestis Hall RO/DI Water Shutdown

Begin:  Wednesday, August 23, 2023, at 7:00 am

End:      Wednesday, August 23, 2023, at 11:00 am

Building(s) or Area(s) Affected:  Huestis Hall, Lokey Labs, Willamette Hall, Streisinger Hall, Onyx Bridge, Pacific Hall, Lewis Integrated Science Building, and Klamath Hall

Scope:  As part of the Huestis Renovation project, the RO system will be temporarily offline.  During this time, the RO supply may be affected in the buildings listed above.

Services Impacted:  RO water supply will be unavailable during this time.

Work Performed By:  JH Kelly

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

map of Huestis Hall

8/16/23 Huestis Hall Basement AHU1 & 2 and Lab Exhaust Shutdown

Begin:  Wednesday, August 16, 2023, at 7:00 am

End:      Wednesday August 16, 2023, at 8:00 am

Building(s) or Area(s) Affected:  Huestis Hall Basement

Scope:  Air Handling Units 1 and 2, as well as the lab exhaust fans, will be temporarily offline for routine cleaning.

Services Impacted:  Supply and exhaust air will be offline during this time.

Work Performed By:  FM Sheetmetal and Siemens

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impacts information can be found on the UO Maps site.

map showing Huestis Hall

8/8/23 Knight Law Emergency Hot Water Shutdown

Begin:  Effective Immediately

End:      Tuesday, August 8, 2023, by end of day

Building(s) or Area(s) Affected:  Knight Law

Scope:  Due to a faulty valve the domestic hot water will be shut down to the entire building.

Services Impacted:  All sinks in labs, break rooms, and bathrooms will be without hot water until the repair can be completed.

Work Performed By:  CPFM Facilities Services Plumbing Department

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

7/14/23 – 7/26/23 Berwick Hall AHU-1 Emergency Shutdown

Begin:  Friday, July 14, 2023

End:      Wednesday, July 26, 2023

Building(s) or Area(s) Affected:  Berwick Hall, Main Concert Hall, Room 101

Scope:  Air Handling Unit #1 has gone down and is awaiting parts delivery before the contractor can make the repair.

Services Impacted:  The HVAC cooling with be offline in the main concert hall until the repair is complete.

Work Performed By:  Hermanson

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

map showing Berwick Hall

7/28/23 – 7/29/23 Riverfront Parkway Road Closure

Begin:  Friday, July 28, 2023

End:      Saturday, July 29, 2023

Building(s) or Area(s) Affected:  Riverfront Parkway between Millrace Drive and Franklin Boulevard

Scope:  All lanes of Riverfront Parkway will be closed to install a tower crane; the east sidewalk will remain open for pedestrian traffic.  See the image below for detour routes.

Services Impacted:  Riverfront Parkway will be closed to all vehicle traffic during this time.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

map of construction area

7/17/23 – 7/19/23 Knight Law Center Carpet Replacement Advisory

Begin:  Monday, July 17, 2023, at 8:00 am

End:      Wednesday, July 19, 2023, at 5:00 pm

Building(s) or Area(s) Affected:  Knight Law Center, Space 160

Scope:  Carpet will be removed and replaced in the 160 commons space.

Services Impacted:  The 160 commons space will be inaccessible for the duration of this work and some construction noise and odor can be expected in surrounding areas.

Work Performed By:  Rubenstein’s

ContactBrianna Liberty, CPFM D&C Design Associate, 541-346-7612 or 541-556-9618

Current construction and impacts information can be found on the UO Maps site.

knight law on the mapknight law interior map

7/13/23 – TBD Klamath Hall Emergency 60 lb. Steam Shutdown

Begin:  Thursday, July 13, 2023

End:      Unknown

Building(s) or Area(s) Affected:  Klamath Hall

Scope:  60 lb. steam feeding for the autoclave has been shut down until further notice due to a leak.

Services Impacted:  The autoclave fed by the 60 lb. steam line will be down.

Work Performed By:  Outside Contractor

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

klamath hall on map

6/28/23 Streisinger Hall RO/DI Water Shutdown

Begin:  Wednesday, June 28th at 9:00 am

End:      Wednesday, June 28th by end of day

Building(s) or Area(s) Affected:  Streisinger Hall Rooms 315(A-F), 331, 333, 345, and 355

Scope:  Due to a necessary replacement of a RO water supply valve in Streisinger Hall Room 315, the RO water supply will be shut down.

Services Impacted:  The RO water supply to the north side of 3rd floor Streisinger Hall will be temporarily interrupted.

Work Performed By:  CPFM FS Plumbing Dept.

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

streisinger on map

6/23/23 Willamette Hall Fume Hood Shutdown

Begin:  Friday, June 23, 2023, at 8:00 am

End:      Friday, June 23, 2023, at 3:30 pm

Building(s) or Area(s) Affected:  Willamette Hall

Scope:   Fume hoods will be out of service for preventative maintenance.

Services Impacted:  The East side fume hoods will be shutdown in the morning, 8:00 am – 12:00 pm, the West side fume hoods will be shutdown in the afternoon, 12:30 pm – 3:30 pm.

Special InstructionsFume hood sashes should be closed and containers within the fume hoods sealed.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

map of willamette hall

6/05/23 – 6/07/23 Miller Theatre Complex Concrete Core Testing Noise Advisory

UPDATE:
The work by Carlson Testing will continue through tomorrow, June 6th, and potentially into Wednesday, June 7th.

 

Begin:  Monday, June 5th, 2023 at 7:00 am

End:      Monday, June 5th, 2023,  Wednesday, June 7th, 2023, at 5:00 pm

Building(s) or Area(s) Affected:  Miller Theatre Complex Rooms 18 & 23

Scope:  Concrete core testing in the Robinson Theater auditorium and stage areas will be taking place.  Noise can be expected throughout the day due to the drilling.

Services Impacted: No impact to services is expected and no shut down to systems will occur.

Work Performed By:  Carlson Testing and Fortis Construction

ContactGene Mowery, CPFM Owner’s Representative, 541-346-5593 or 541-799-4016

Current construction and impacts information can be found on the UO Maps site.

Miller Theatre on map

5/01/23 – 5/31/23 Campus Air Handling Unit Preventative Maintenance Schedule

Begin:  May 1, 2023

End:     May 31, 2023

Building(s) or Area(s) Impacted:

  • Knight Library
  • Baker Downtown Center
  • Susan Campbell Hall
  • Hendricks Hall

Scope:  AHU preventative maintenance work will be performed, over the course of the month, for the buildings listed above.

Services Impacted:  No services are expected to be impacted.

Work Performed By:  CPFM Preventative Maintenance Crew or Contractor

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

map of locationsmap of location

4/13/23 Parking Lot 51 South Entrance blockage Advisory

Begin:  Thursday, April 13th, 2023 @ 8:00 am

End:      Thursday, April 13th, 2023 @ 5:00 pm

Building(s) or Area(s) Affected:  South entrance to Lot 51, behind Moss Street Children’s Center

Scope:  Contractor will be sleaving a pipe that runs under the Alleyway

Services Impacted: Access to and from Lot 51 at East 17th Avenue will be closed and noise from boring equipment can be expected in the course of this work.

Work Performed By:  Roto Rooter

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

To view current construction and impacts, visit UO Map

Image of the Alley behind Moss Street Children's Clinic where the closure will occur

3/29/23 Riverfront Parkway Road Closure Advisory

Begin:  Wednesday, March 29, 2023, at 8:00 am

End:      Wednesday, March 29, 2023, at 1:00 pm

Building(s) or Area(s) Affected:  Riverfront Parkway between Millrace Drive and Franklin Boulevard

Scope:  An unexpected shutdown of the intersection at Riverfront Parkway and Millrace Drive is underway.  The shutdown is expected to last until 1:00 pm today with southbound traffic opening sooner if possible.

Services Impacted:  All vehicles in the area will need to travel East on Millrace Drive to Garden Avenue for egress.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

3/14/23 McArthur Court Steam Shutdown

Begin:  Tuesday, March 14, 2023, at 8:00 am

End:      Tuesday, March 14, 2023, at 3:oo pm

Building(s) or Area(s) Affected:  Mac Court

Scope:  Steam will be shutdown to replace and install new steam valves

Services Impacted:  Heat will be off during this time for the entire building

Work Performed By:  FS Mechanical Shop

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

2/02/23 – 4/17/23 Johnson Hall North Entrance Closure and Repair

UPDATE 4/17/23:
The scaffolding has been removed and the work is complete except for the installation of the new globes.  Once they have arrived and are ready to be placed, an update will be sent.

 

UPDATE 3/14/23:

Begin:  Monday, March 20, 2023

End:      Thursday, April 20, 2023

Scope:  Harver Construction will be setting up scaffolding on the entire North porch of Johnson Hall to repair the stucco failure in the soffits.   The scaffolding will remain in place until work is completed.  There will be a dumpster located on the east sidewalk of the north entrance as well.

UPDATE 2/22/23:

Begin:  Tuesday, February 28, 2023, at 10:30 am

End:      Tuesday, February 28, 2023, at 2:30 pm

Scope:  Due to stucco failure on the soffit at the North entrance of Johnson Hall, we will have contractors using a boom lift to investigate scope of work.

Services Impacted:  This will affect the north entrance and side walk.

Special Instructions:  We ask the building occupants to use the south entrance during this time.  Although the north entrance will be cautioned taped, it will remain open for emergency use only.  Thank you for your understanding and support.

Work Performed By:  Preferred & Harver Construction

ContactJeff Hanson, CPFM Construction Project Manager, 541-346-7991 or 541-951-7195

 

UPDATE 2/03/23:
The north doors to Johnson Hall will be available to use after 4:00 pm today (2/3/23). Please stay out of the taped off areas on both the east and west side of the porch.  Thanks to our campus partners in CPFM for quickly securing a safe passageway in order to reopen this entrance.  This temporary scaffold tunnel will be in place until it can be assured that the hazard is mitigated.

 

Original announcement 2/02/23:
A piece of soffit has broken off and fallen on to the top step of the North entrance to Johnson Hall. There is a potential that other sections of this soffit may also drop. Safety and Risk Services and Campus Planning and Facilities Management are asking that all building users refrain from using the north entrance until further notice, except in case of emergency.  CPFM will be working in the area to erect a scaffold tunnel to provide a safe entrance/exit for building users and visitors. Once this safeguard is in place, the building occupants will be notified and the entrance will be put back into service. Thank you for your understanding and support of this safety measure.

1/19/23 East 13th Developments and Safety Plan

A traffic control plan has been approved and will be implemented in phases. The fence line has already been moved back to the north curb, allowing west bound bicycle traffic.

 

By the end of this week (1/20/23), the city plans to install water filled barriers on the portion of the street that currently has the dashed bike lane lines. This will create a protected bike/ped area on the north side of the street. This is intended to function as shared use path with both bikes and peds traveling both directions

 

On the south side of the street, the existing back-in parking will be removed to create an eastbound vehicle lane allowing LTD buses and other vehicles through. There will initially be a parallel parking area on the far south side of the street. This will convert to a pedestrian path when the Taylor’s redevelopment takes over the sidewalk on the south side.