4/08/23 Klamath, LISB, Onyx, Lokey Labs Nitrogen Tank Maintenance and Upgrades

Contractors will be performing maintenance and upgrades on the large Onyx Nitrogen tank this Saturday 4/8/2023. In preparation for this work, we have bypassed the gas supply from the large tank with two smaller pressure building vessels. The reason for the bypass is to allow the system to settle and de-ice. Over the next two days the house nitrogen lines may experience short drops in pressure.

Please alert the following groups if the issue occurs during the indicated times:

Thursday – Friday 8:00 am – 5:00 pm: workcontrolcenter@uoregon.edu and or the Science Stores via email (sciencestores@uoregon.edu) or phone 541-346-4636

Thursday – Friday after hours and weekend: UO Dispatch – 541-346-2919 and or email tsacore@uoregon.edu

Once the proper contact is alerted, the issue can be fixed within 20 minutes.

Locations Impacted:

Klamath, LISB, Onyx, Lokey Labs

Image of Onyx Bridge, Klamath, LISB, and Lokey Labs

4/07/23 Huestis Basement Emergency HVAC Air Supply and Exhaust Shutdown

Begin:  Friday, April 7, 2023, at 7:00 am

End:      Friday, April 7, 2023, at 11:00 am

Building(s) or Area(s) Affected:  Huestis Basement

Scope:  There is an emergency shutdown required tomorrow on the Willamette AHU 2 fan supplying the Huestis basement and Huestis basement AHU 1 & 2 and LEF 1 & 2 to allow for cleaning the VFDs.

Services Impacted:  This will affect the HVAC Air Supply and Exhaust.

Work Performed By:  Lease Crutcher Lewis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Image of Huestis Hall

4/07/23 – 4/08/23 Riverfront Parkway South-Bound Road Closure

UPDATE:
Additional road map provided to assist with traffic flow.

Map to assist with traffic flow

REVISED MAP – UPDATED 4/4/23
See below

Begin:  Friday, April 7, 2023, at 7:00 am

End:      Saturday, April 8, 2023, at 5:00 pm

Building(s) or Area(s) Affected:  Riverfront Parkway

Scope:  Riverfront Parkway south-bound at Millrace Drive will be shutdown per attached detour plan.  Work is to pothole and locate EWEB utility main lines for protection during construction.

Services Impacted:  Riverfront Parkway & Knight Campus Building 1 – See attached detour plan.

Work Performed By:  Hoffman Construction

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258

Current construction and impacts information can be found on the UO Maps site.

Revised Riverfront Parkway map 4/4/23

Riverfront Detour Map_4-7 & 4-8-23_REVISED

4/04/23 – 4/07/23 Ford Alumni Center Light Construction Work Advisory

Begin:  Tuesday, April 4, 2023

End:      Friday, April 7, 2023

Building(s) or Area(s) Affected:  Ford Alumni Center

Scope:  Light construction work (electrical, removal/installation of wall mounted items, painting) happening in 201 and in hallway outside of 209F.

Services Impacted:  Noise and odor can be expected during this time.

Work Performed By:  CPFM Facilities

ContactBrianna Liberty, CPFM D&C Design Associate, 541-346-7612 or 541-556-9618

Current construction and impacts information can be found on the UO Maps site.

Image of Ford Alumni room 201 and hallway by 209F